Develop an environment and third party management plan

Assignment Help Other Engineering
Reference no: EM131737391

Water Network Design Assignment :-

Task

1. Design of Water Supply Network by proprietary hydraulic analysis software.

2. Optimise the design, efficiency and cost of the system.

3. Produce an NPV Cost Analysis

4. Develop an Environment & Third Party Management Plan and Risk Register

Outline:-

Consider this as your submission as Design Engineer to the Developer, Architect. Contractor and City Planner in a bid to win the Project for undertaking Detailed Design by your Engineering Consultancy.

Clearly communicate all assumptions, design decisions and further actions required later at the detailed design stage etc.

Guidelines for Health and Safety Risk Assessment Register
Titles: Purpose, document reference and project, date, sheet number etc

Format: Tabular columns on single A4 sheet

Suggested Headings:
Date Raised
Raised by
Item Reference Number
Activity Element
Potential Hazards
Consequence/Likelihood/Risk Rating
Persons at Risk
Design measures taken to eliminate or reduce the hazard
Information provided about the residual hazards
Actioned by
Date Actioned

Guidelines for NPV Analysis

Key Objective :

To demonstrate full understanding of performing an NPV analysis of two or more competing options for a relevant element of design within the network.

Reference no: EM131737391

Questions Cloud

Important issue in maintaining managed care : "Maintenance of the professional relationship with physicians in the network recently has assumed a far greater role in in the industry's history."
Explain the role and importance of an sm within a company : Explain the role and importance of an SM within a company. Analyze the approach of your selected three companies toward sustainable management.
What factors accounted for the additional inflation : In 1974, the unemployment rate was 5.6%. What would have been the projected inflation rate using the Phillips curve based on these data alone?
What is mitigation and why is a mitigation plan necessary : What is mitigation and why is a mitigation plan necessary? How was the plan prepared? How did you obtain your information?
Develop an environment and third party management plan : CE5616-CE3608 Design of Water Supply Network by proprietary hydraulic analysis software and Optimise the design, efficiency and cost of the system
Compute the value of the dollar rose : In the early 1980s, both US interest rates and the value of the dollar rose sharply, reducing the current account balance.
What amount would be reported for net investing cash flows : A company had the following cash flows for the year: What amount would be reported for net investing cash flows on the Statement of Cash Flows
Review problem on stock market crash : Because of a stock market crash, consumer and business optimism declines, so both consumption and investment drop. On a ceteris paribus basis, a drop in C.
Should you add the vc fund to your portfolio : It has a correlation of 0.19 with the Farrallon Fund. Should you add the VC fund to your portfolio? Explain.

Reviews

len1737391

11/25/2017 2:51:16 AM

Inside the Powerpoint file you can see the requirements and guidelines for the task. There is also a marking criteria available on slide 2 The Demand and costing data is included on slide 3 Inside the Dropbox link there is a file called water assignment background which is an aerial map The Powepoint also gives recommended settings for the software for the health and safety risk register they give all the details lots of sources and info is available inside the Dropbox link

len1737391

11/25/2017 2:51:09 AM

Dear Writer Please find details of the new task below Module: Water and Wastewater Engineering Task Design of Water Supply Network by proprietary hydraulic analysis software. Optimise the design, efficiency and cost of the system. Produce an NPV Cost Analysis Develop an Environment & Third Party Management Plan and Risk Register Consider this as your submission as Design Engineer to the Developer, Architect. Contractor and City Planner in a bid to win the Project for undertaking Detailed Design by your Engineering Consultancy. Clearly communicate all assumptions, design decisions and further actions required later at the detailed design stage etc. Design Report as “DesignReportxxx.doc (Where xxx is your unique candidate number) EPANET Model Save as “WaterModelxxx.net” and….. Export as “WaterModelxxx.inp” Cost Analysis as “Cost Analysisxxx.xls”

Write a Review

Other Engineering Questions & Answers

  Characterization technology for nanomaterials

Calculate the reciprocal lattice of the body-centred cubic and Show that the reciprocal of the face-centred cubic (fcc) structure is itself a bcc structure.

  Calculate the gasoline savings

How much gasoline do vehicles with the following fuel efficiencies consume in one year? Calculate the gasoline savings, in gallons per year, created by the following two options. Show all your work, and draw boxes around your answers.

  Design and modelling of adsorption chromatography

Design and modelling of adsorption chromatography based on isotherm data

  Application of mechatronics engineering

Write an essay on Application of Mechatronics Engineering

  Growth chracteristics of the organism

To examine the relationship between fermenter design and operating conditions, oxygen transfer capability and microbial growth.

  Block diagram, system performance and responses

Questions based on Block Diagram, System Performance and Responses.

  Explain the difference in a technical performance measure

good understanding of Mil-Std-499 and Mil-Std-499A

  Electrode impedances

How did this procedure affect the signal observed from the electrode and the electrode impedances?

  Write a report on environmental companies

Write a report on environmental companies

  Scanning electron microscopy

Prepare a schematic diagram below of the major parts of the SEM

  Design a pumping and piping system

creating the pumping and piping system to supply cool water to the condenser

  A repulsive potential energy should be a positive one

Using the data provided on the webvista site in the file marked vdw.txt, try to develop a mathematical equation for the vdW potential we discussed in class, U(x), that best fits the data

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd