1. Develop a summary bar chart for the activities listed in the table below.
2. Assuming the cost to operate each activity run at a linear rate, calculate the cost per day to run the project.
3. Plot the cost versus time cumulative curve (S curve) for this project. Reference page 230 in the text.
Activity List for a small Commercial Building Project
Activity
Duration
Cost
Predecessor
Foundations and slab utilities
6
12,500
none
Structural Steel
4
23,000
Fnds & Slab
Roof Deck
10,000
Floor Slab
2
5,500
Siding
19,000
Windows and Doors
4,700
Mechanical
14
16,800
Electrical
15,700
Insulation
8,800
Finishes
5
7,000
A 10 m long built-up beam is to be fabricated from a universal section beam (UB) and two 'C' channel sections (as indicated). The beams are joined by bolts, with the allowable shear load in each bolt being 12 kN.
A very small country has just gained independence in the year 2000, at which time its population was 1,000. The new country has a birth rate of 0.02 yr-1, death rate of 0.004 yr-1, immigration rate of 0.01 yr-1, and emigration rate of 0.005 yr-1.
Determine (a) the final mixture temperature and (b) the final mixture pressure.
A ciricular sewer is laid on a slope of 0.5%. What diameter is required if the concrete pipe is to carry 25 cfs If the desired design mean suction velocity is between 3 and 7 ft/s, is the design acceptable
Write a computer program that for a given state of plane stress and a given yield strength of a ductile material, can be used to determine whether the material will yield.
A previously calibrated rotometer is being used to measure a gas flow. The old calibration curve is a straight line described by the following equation:
Calculate the (maximum) design load on a hollow AISI 1020 steel shaft with an outside diameter of 2.5 inches and an inside diameter of 2 inches. Assume a safety factor of 2.
Suppose that the probabilities are , respectively , 0.6, 0.2, 0.1 and 0.1 that an income tax form will be filled out correctly , that it will contain an error favoring a taxpayer , that it will contain an error favoring the government
determin the force in memebers de, hg and he of the trees and state if the members are in comperhemsion
As an aspiring civil engineer, please write a 1-2 page summary suggesting what could be designed and implemented to transform the Montebello property into "LEED certified" green building(s) that would serve as a dormitory or dormitories for our gr..
Aerodynamics plays an important rule in high-speed sports. This is especially true for bobsleigh and it experiences the average speed of around 130 km/h.
A concrete sewer pipe 1m in diameter is laid so it has a drop in elevation of 30cm per 300m of length. If sewage (assume the properties are the same as those of water) flows at a depth of 50cm in the pipe, what will be the discharge?
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd