Determining the cord for equilibrium

Assignment Help Civil Engineering
Reference no: EM13878648

The bucket has weight W. Determine the tension developed in each cord for equilibrium.

Given:

W = 20 lb

a = 2 ft

b = 2 ft

c = 8 ft

d = 7 ft

e = 3 ft

f = a

1652_Determine the tension.jpg

Reference no: EM13878648

Questions Cloud

What is the ending value of the bond when it is sold : A 25 year bond issued today by Carris, Inc. has a coupon rate of 11%, a required return of 12% and a face value of $1000. The bond will be sold 8 years from now when interest rates will be 9%. what is the Beginning value of the bond when it is iossue..
What possible motivation might a business manager : What possible motivation might a business manager have for perpetrating fraud?
Other miscellaneous closing costs : You are about to purchase your first home for a purchase price of $323,210 and would like to know the amount of money needed at closing. You will place a 17% down payment and will pay 2 points on the loan. Other miscellaneous closing costs (appraisal..
Distinguish between the trust services principles of privacy : Distinguish between the Trust Services Principles of privacy and confidentiality.
Determining the cord for equilibrium : The bucket has weight W. Determine the tension developed in each cord for equilibrium.
Considered different allocation methods : 1.In the previous chapters, we considered different allocation methods and considered which one might be "better."
Analyse the events which have occurred within sioca plc : Critically analyse the events which have occurred within Sioca PLC since January 2003 and the management accounting information systems related problems that have resulted.
What is this projects equivalent annual cost or EAC : A five-year project has an initial fixed asset investment of $360,000, an initial NWC investment of $40,000, and an annual OCF of −$39,000. The fixed asset is fully depreciated over the life of the project and has no salvage value. If the required re..
Using the node-voltage method : Problem (1):  For the circuit shown in Figure PI: a) Using the Node-Voltage method. find the three nodes voltages VI. V2 and V3 b) Calculate the power delivered or absorbed by each source.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determine the specifications unstretched length and spring

Determine the specifications (unstretched length and springconstant k) for the elastic cord to be used at a bungee-jumpingfacility. Participants are to jump from a platform 150 ft above the ground. When they rebound, they must avoid an obstacle that ..

  Determine what is the change in length in inches

The strain in member AB was measured to be 8.9*10-4. If the member is an L3*2 1/2* 1/4 of A36 steel determine the following: a) What is the change in length in inches b) What is the force in the member

  Determine two possible angles theta at which this

A fireman is standing on a hoist and sprays water at a fire. the fire is 35 ft in the x direction and 20ft downward in the y direction. the water flows at 65 ft/s. determine two possible angles theta at which this can be done. assume the angle below ..

  Determine the velocity at x in the velocity equation

The acceleration of a particle is defined by the relationship a=-kx^-2 ft/s^2, where x is in feet and k is a constant. At x(0)=0.1ft, v(0)=0 and at x(1)=1ft, v(1)=10ft/s. Find the velocity at x=5ft.

  Find the displacement of the water tower

Using the central difference method and a time step of ?t = 0.02 seconds, find the displacement of the water tower at t = 0.02 and 0.04 seconds.

  Calculate required compressive strength for a concrete mix

Calculate the required compressive strength for a concrete mix design if F'c = 5000 psi and data indicate a standard deviation of 600 psi based on 15 tests for a similar concrete mix

  How many acres should the detention pond be to store

a rainstrom lasts for 90 min at a constant intensity of 3.2 in/hr over a five acre parking lot. a detention pond is used to store all of the runoff from the parking lot and cannot be deeper than 2 ft.

  Determine the layout for a set of no-3 u-stirrups with fy

A concrete beam that is simply supported sustains a uniform live load of 1.8 kips/ft and a uniform dead load (not including self weight) of 1 kips/ft on a span of 24 ft. Determine the layout for a set of No.3 U-stirrups with Fy=60 ksi and F'c=3.5 ..

  Calculate the time interval between air photo exposures

Air photos are taken with specified overlap to take advantage of image parallax. Calculate the time interval between air photo exposures if the ground speed of the aircraft is 160km/h, the focal lenght is 50mm,

  Calculate the depreciated portion of the ownership cost

Property taxes,insurance and storage will run 5%.What is the owning cost for the dozer?Use the time value method to calculate the depreciated portion of the ownership cost.

  Determine what is the drag coefficient at the cars top speed

A 3000-lb car has a maximum speed (at sea level and on a level, paved surface) of 140 mi/h with 16" radius wheels, a gear reduction of 3.5 to 1, and a drivetrain efficiency of 92%. It is know that at the car's top speed the engine is producing 220..

  Conveyor system experiences continued operation

Given that the minimum footing size is 2(m) x 2 (m), design the foundation so that the conveyor system experiences continued operation.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd