Determining the amount of investment

Assignment Help Civil Engineering
Reference no: EM1383462

In order to have money available for replacing their family vehicle, a couple plans to have $38,000 available 5 years from now by investing in a global mutual fund. If they plan to increase their savings by 5% each year, how much must they invest in the first year given that they expect to earn 4% per year on their investment?

Reference no: EM1383462

Questions Cloud

Municipal utility-considering two large-scale conduits : A big municipal utility district is considering two large-scale conduits. The first includes construction of a steel pipeline at a cost of $200 million.
Clerical employees who process insurance application forms : A firm has a large pool of clerical employees who process insurance application forms. When the firm hires a new clerical employee, it takes that person about 48 minutes to process a form.
The manager of the burger doodle restaurant believes : The manager of the Burger Doodle restaurant believes the time to fill orders at the drive-through window is too long. She suspects that the window cashier spends too much time making change,
What is the total cost with the discount : Happy Pet would have to buy shipments of 3,000 at a time. Should Happy Pet use the new supplier and take this discount for quantity buying
Determining the amount of investment : If they plan to increase their savings by 5% each year, how much must they invest in the first year given that they expect to earn 4% per year on their investment?
Work at stinson shipping was getting extremely hectic : Work at Stinson Shipping was getting extremely hectic. Tom Murphy, the loading dock manager, looked over the list of shipping documents that he needed to process and marveled at the increase in business over the past three months
Environmental soil cleaning company : How much money should an environmental soil cleaning company borrow to finance a site reclamation project if it expects revenue of $140,000 in the first year increasing by 3% per year over the 5-year cleanup period? The interest rate is 8%.
Assuming that the probability of a customer waiting mores : In a call center, the waiting time for a customer is normally distributed with an average of 65 seconds and a variance of 25 seconds. Assuming that the probability of a customer waiting more than
Waterline of center of gravity : The ship has a total weight of 155,000 tons, length = 1,600 feet and a beam = 150 feet (assume that it is the shape of a rectangular box). Calculate the height above the waterline of its center of Gravity (G).

Reviews

Write a Review

Civil Engineering Questions & Answers

  Cleaning paintbrush with solvent

The brush is immersed in the first volume and agitated until equilibrium is established, removed and the exercise is repeated with the second volume. Assume that the solvent remaining in the brush after it is removed from the first batch is insign..

  Discuss the different environmental companies

Discuss the different agencies, institutes, centers, different environmental companies that are active in UAE.

  Foundation raft of water tower

A circular rc girder for the foundation raft of water tower has dia 10m.the udl load transmittedby 8 coloumn on te girder being 300 kn/m.the width of the beam is 500 mm and the over depth.

  Industrial history repeats itself

There are many parallels between the industrialization of the United States after Reconstruction and the modernization of the American workforce in the last twenty to thirty (20-30) years as it transitions from industry to a service-oriented econo..

  Find out velocity head expressed in atmospheres

What is the velocity head expressed in atmospheres for a rapid filter operated at a surface loading rate of 475 m/d when the local porosity is 0.40?

  Pore water pressure at failure

A CU triaxial test with σc = 20 psi is performed on a sand and a deviator stress of 80 psi fails the specimen. Previous tests revealed that the effective friction angle for this sand is 35°. Calculate the pore water pressure at failure.

  Regenerative thermal oxidizers

A company that manufactures regenerative thermal oxidizers made an investment 10 years ago that is now worth $1,300,000.

  Projectile shot vertically upward

The height (in meters) of a projectile shot vertically upward from a point 2 m above ground level with an initial velocity of 24.5 m/s is h2+24.5t-4.9t^2 after t seconds. a) When does the projectile reach its maximum height? b) What is the maximum..

  Determining the crest and sag vertical curves

Determine, for the crest and sag vertical curves required, the stationing and elevation of the PVCs and PVTs given that the PVC of the crest curve(on westernmost level highway section) is at station 0+00 and elevation 100 ft.

  Mannering traffic and highway engineering

An approach to a pretimed signal with a 60 sec cycle has nine vehicles in the queue at the beginning of the effective green. Four of the nine vehicles in the queue are left over from the previous cycle.

  Analyze a structural system of a building

Use modern software tools to analyze a structural system of a building.

  Regular hexagonal pyramid

A regular hexagonal pyramid has an upper base edge of 16 ft. and a lower base edge of 28 ft. if the volume of the frustum is 18041 ft^3., find the lateral area of the frustum.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd