Determine which method will accomplish the job in the short

Assignment Help Civil Engineering
Reference no: EM13560294

Given: A tank with a volume (?) of 5,000 gal contains salt solution at an initial concentration (C0*) of 70,000 mg/L, but the concentration in the tank (C) needs to be reduced to 500 mg/L. Two approaches are being considered as indicated below (Alternatives 1 and 2).

Alt. 1: Flush tank with clean tap water while tank is mixed. Flowrate into the tank (QIn) and flowrate out of tank (QOut) are each 40 gpm (both flows are limited by the drain pipe capacity). If you do not derive equations used (which is not required), identify the source of the ones used with specificity; Define all variables used.

Alt. 2: First decant a portion of the salt solution at a flowrate (QOut) of 40 gpm, then replace the decanted volume with clean tapwater at a flowrate into the tank (QIn) of 100 gpm.

Required: a) Determine which method will accomplish the job in the shortest time.

b) Determine the difference in clean water used/ wastewater generated (gal.) by each method.

c) Of course our time is valuable and the importance of accomplishing the task quickly is obvious. Rather than discussing time, discuss, from the standpoint of sustainability, the importance of:

1) conserving (not wasting) clean water, and

2) minimizing the generation of waste brine (salty water) in the Central San Joaquin Valley.

Be thoughtful; Simplistic answers will not receive much credit. Include in your discussion:

the long-term outlook of groundwater reserves in the Central Valley

the challenges we face with respect to disposal of waste brine solution; what are the legal ways of doing this in the Valley? Note that it would not be legal to put brine in the sewer or percolate it into the ground due to the negative impact both would have on the groundwater.

Reference no: EM13560294

Questions Cloud

What is the specific heat of the unknown piece of metal : A 100-g piece of metal initially at 100 C is placed in a 250 gof water contained in a 300-g aluminum vessel initially at 20.o C. what is the specific heat of the unknown piece of metal
Business there in the shorter term : How does that impact your ability to do business there in the shorter term?
What would your answer be if the refrigerant were first : Saturated refrigerant-134a vapor at 20 psia is compressed reversibly in an adiabatic compressor to 120 psia. Determine the work input to the compressor. What would your answer be if the refrigerant were first condensed at constant pressure before it ..
Compute what is actual direction of the sun : An underwater scuba diver sees the Sun at an apparent angle of28.0° from the vertical. What is actual direction of the Sun
Determine which method will accomplish the job in the short : First decant a portion of the salt solution at a flowrate (QOut) of 40 gpm, then replace the decanted volume with clean tapwater at a flowrate into the tank (QIn) of 100 gpm.
Volunteer water metering in the city of richmond : Volunteer Water Metering in the City of Richmond
Why and how the material is important : Why and how the material is important and relevant to the course content; and
Determine the dimensions of the best hydraulic trapezoidal : Determine the dimensions of the best hydraulic trapezoidal concrete channel section to convey water at a rate of 2200 gal per min on a channel slope of 0.015 m/m.
How much time have you got to move equipment from the top : You are in charge of the construction site of a new dam. Extremely heavy rainfall starts and Bureau of Meteorology hydrologists tell you that beginning at about 8 AM, 2 GL per hour (2 x 106 m3 per hour) will flow into the dam. The lake behind the dam..

Reviews

Write a Review

 

Civil Engineering Questions & Answers

  Ddetermine the tension of each cable above the incline

two cars, connected by a cable, are winched up an incline using a second cable. the incline makes an angle of 25 degrees with the horizontal, and the winch rises another 30 degrees above the incline.

  Calculate the ratio of the area to volume for unit cube

calculate the ratio of the area to volume for unit cube,a unit sphare inscribed inside the cube,and as right cylinder inscribed inside the cube.

  What will be approximate distance from pipe entrance

Oil with a kinematic viscosity of 0.0035ft3/s flows through a 4-in-diameter pipe with a velocity of 15ft/s. What will be the approximate distance from the pipe entrance to the first point

  Determine the vertical stress of 4m below the centre

Determine the vertical stress of 4m below the centre of shallow foundation 3 x 3m carrying a uniform pressure of 275 kN/m3. Plot the variation of vertical stress with depth (up to 10m) below the centre of the foundation

  Calculate the average annual price increase in salaries paid

Here is some information about a professor salary index (PSI) Year PSI Change in PSI 2004 82 3.22% 2005 89 8.50 2006 100 a 2007 b 4.00 2008 107 c 2009 116 d 2010 e 5.17 2011 132 7.58

  Determine the adequacy of the design using basic principles

For the eccentric shear loading of the accompanying figure, 7/8 inch diameter A325 bolts are used in two vertical lines in a bearing-type (A325-X) connection. The loading is 10 kips dead load and 30 kips live load.

  Plot the values on a graph of u versus y for earths surface

The Earth's surface creates a boundary layer in the atmosphere. The velocity profile near the surface can be expressed as a power law, u = a * y n, where the constants a and n depend on the roughness of the surface.

  Find require diameter of bar according to max stress critera

A bar with a circular cross-sectional area is made of SAE 1045 carbon steel having a yield stress of sY = 1000 MPa. The bar is subjected to a torque T=3.75 kNm and a bending moment M=7 kNm. Using a factor of safety FS=2 with respect to yielding

  Determine the service rate for six vehicles per minute

Vehicles begin to arrive at a toll booth at eight vehicles per minute from 9 A.M. to 10 A.M. The booth opens at 9:10 A.M. and services at a rate of ten vehicles per minute until 9:40 A.M. From 9:40 A.M. until 10 A.M.

  What resistor is needed to create the necessary coil voltage

The available relay for switching a secondary circuit requires 4 volts and has a coil resistance of 145 ohms. If a voltage divider circuit is used to reduce the voltage to activate the relay, what resistor is needed to create the necessary coil vo..

  Determine what value of n was used in the design

An irrigation channel is constructed of earth and is 8.1km long and has a capacity of 10 m^3/s for a flow depth of 2m. The cross section is trapezoidal with a bid width of 8 m and side slopes of 2 horizontal to 1 vertical.

  Calculate the force on the levee gates form storm surge

Higher water level inside the eye, combined with wind results in a "storm surge". Calculate the force on the levee gates form storm surge 20 feet above level of the lake traveling at about 25 ft/sec.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd