Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
A solid steel shaft of circular cross section and diameter 6 inches in pure torsion under torque. If E=30x10^6 pse and max shear stress is 30 ksi, calculate the torque.
If the shaft was hollow, with an innner diameter of 2 inches and outer diameter 4 inches, what will be the max torque?
A four year financial project has net cash flows of $20,000; $25,000; $30,000; and $50,000 in the next four years. It will cost $75,000 to implement the project. If required rate of return is 20%, conduct a discounted cashflow calculation
A 40 oF breeze of 10 miles per hour blows over the top of a round open-top water cooling tank which has a bulk temperature of 100 oF. What is the rate of energy in kW that enters into the air What type of heat transfer mechanism is employed in thi..
The buildings are single story with a rood line 6 feet above the man-door opening is constructed from clay brick that is 12 inches thick and weighs 115 psf. the opening of the man-doors are 3 feet 4 inches wide.
The jib crane supports a load of 750 lb from the trolley which rides on the top of the jib. The members of the crane are pinned together at B, E, and F and supported by a short link BH.
The train passes point A with a speed of 30 m/s and begins to decrease its speed at a constant rate of at = - 0.25 m/s2. Determine the magnitude of the acceleration of the train when it reaches point B, where sAB = 412 m.
Devise a appropriate management system that you as a commercial manager for the contractor would recommend to the project team for use on a construction or building contract.
A compressible clay layer 10.0m thick has an initial void ratio in situ of 1.026. Tests and computations show that the final void ratio of the clay layer after construction of a structure is 0.978. Determine the estimated primary consolidation set..
Find the time for one complete cycle of this motion if the spring constant is 21 N/m. (Assume that once the pendulum ball hits the spring there is no effect due to the vertical movement of the ball.)
What are the important findings in Austin Road Co. v. OSHRC and Builders Steel Co. v. Marshall? Your response should be approximately 200 - 300 words and include a reference citation for your response.
the recommended threshhold limit value ( TLV-ACGIH) air concentration for occupational exposure to water-insoluble hexavalent chromium Cr (VI) is 0.01 mg/M^3. this concentration is based on an assumption that the individual is generally healthy an..
It is required to dewater a construction site 80 m by 80 m. The bottom of the construction will be 1.5 m below the initial water surface elevation of 90 m.
Conduct either a qualitative or quantitative risk assessment on this project. Identify the risk factors that you consider most important for the suspension bridge construction. How would you assess the riskiness of the project? Why?
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd