A flood control project has a construction cost during the first year of $10 million, during the second year $6 million, and during the third year $2 million. It is completed at the end of the third year and thereafter incurs an annual operating cost of $200,000 per year. Benefits from the project also begin during the fourth year and are valued at $1.5 million in that year, growing at a 2% compound rate of increase out to the planning horizon (analysis period) of 50 years. The interest rate is taken to be 6%. Carefully draw the cash flow diagram. What is the present worth of cost? What is the present worth of benefit? Is this a viable project economically?
The factory will use a 4 ft deep on-site lagoon to stabilize the waste with a loading rate of 20 lb BOD/acre-day. Part a) What is the total BOD loading per day?
A hydroelectricity plant is supplied from a resevoir via a pipeline 2km long and 2.5m in diameter. The pipeline terminates at the downstream end at in a control valve. Determine the minimum surge tank size if the max allowable height
If an additional 11ft lane is added (each direction) and all other factors stay the same, what will be the new level of service?
What is the composition of this last remaining liquid phase?
What pressure gradient is required to accelerate water vertically upward in a vertical pipe at a rate of 0.5g
In a right triangle with the hypotenuse c = 10 and the angle A =50 degrees , what is the value of side b ?
You are a real estate salesperson working for Good Earth, Realtors, Inc. You receive 50 percent of all commissions received by the firm (net of MLS fees) for which you were either the listing agent or the selling agent.
Suppose the summer daily demand for water use in Phoenix is normally distributed with a mean of 310 million gallons/day and a standard deviation of 45 million gallons/day. Also suppose the city has reservoirs whose combined storage is 350 million ..
Processing begins when the lane reaches capacity, what is the uniform deterministic arrival rate if the vehicle queue is cleared in 35 minutes after vehicles begin to arrive (in veh/min.)?
When a rocket reaches an altitude of 40 m it begins to travel along the parabolic path (y-40)^2=160x, where the coordinates are measured in meters. If the component of velocity in the vertical direction is constant at Vy=180m/s
In that season, what are the hydraulic radius of the river, its mean velocity and volumetric discharge?
Geometric design and construction of a new two-lane two-way road has been recently completed and now it is time for design pavement near Ballarat, Victoria.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd