Determine what is present worth of maintaining the bridge

Assignment Help Civil Engineering
Reference no: EM13300295

Maintenance expenses for a bridge in Georgia are estimated to be $200,000 for the first eight years followed by two separate million dollar expenditures in years 12 and 18. The expected life of the bridge is thirty years. For i=6% what is the present worth of maintaining the bridge?

Reference no: EM13300295

Questions Cloud

Allows the user to enter the cost for an item : Write a program that allows the user to enter the cost for an item and the number of that item ordered.
What percentage of new product ventures end in failure : Approximately, what percentage of new product ventures end in failure?
Explain real orbitals and which are impossible : Which of the following combinations of n and l represent real orbitals and which are impossible? 4s 3p 3f 2p
What is the angular speed of the ball after impact : A uniform solid ball that has a mass of 21.8 g and a radius of 5.1 cm rests on a horizontal surface. What is the angular speed of the ball after impact
Determine what is present worth of maintaining the bridge : Maintenance expenses for a bridge in Georgia are estimated to be $200,000 for the first eight years followed by two separate million dollar expenditures in years 12 and 18. The expected life of the bridge is thirty years.
How attractive is the boeing 7e7 project : Judged against your WACC, how attractive is the Boeing 7E7 project?
Determine the bod of biodegradable industrial wastewater : A biodegradable industrial wastewater (paper production) has a COD of 600 mg/ L. If the BOD progression follows first-order kinetics with a rate constant of 0.10 per day, determine the BOD5
How many photons are present in each pulse : A surgeon is attempting to correct a detached retina by using a pulsed laser. If the pulses last for 35.1 ms, how many photons are present in each pulse
The first stage of the team development process : The last stage of the team development process is usually: The first stage of the team development process is:

Reviews

Write a Review

Civil Engineering Questions & Answers

  Force required to maintain this motion

The viscosity of the film of oil separating the piston from the cylinder is 0.020 lb.s/ft. Calculate the force required to maintain this motion.

  Estmate the capacity of the roadway

given s=.30/(60-u), where s is the spacing (space headway) in miles, and u is the speed in miles per hour, derive the relationships u-k, u-q, and q-k. Also, estmate the capacity (qmax) of the roadway.

  Find what are the monthly payments and the total interest

A 2014 Ford Mustand convertible in 'Gotta have it Green Metallic' is retailing for $38,000. If you put $3,500 down on the vehicle, and obtain approval for a 2.19% car loan compounded monthly for 5 years.

  What is the flow rate that can be delivered

A water line to a home is usually 3⁄4" copper tube. What is the flow rate that can be delivered and still maintain laminar flow in the tube?

  Deriving the 1-d poisson equation

Beginning whith the 1-D, steady state, general mass(volume) balance equation Qin-Qout=0 derive the 1-D poisson equation.

  Calculate the required diameter of steel tie rods

CALCULATE THE REQUIRED DIAMETER OF STEEL TIE RODS NECESSARY TO SUPPORT A BALCONY. EACH ROD, SUSPENDED FROM A ROOF TRUSS, SUPPORTS A FLOOR AREA OF 7.0m^2. THE COMBINED BALCONT FLOOR LOAD IS 10.5 kPa

  Determine what is the static height reading of manometer

A manometer of water reads a height of 20cm at a temperature of 15 degrees C. If the diameter of the manometer tube is 1mm, what is the static height reading

  Determine what is the probability that the system operates

Consider a system that consists of 4 devices. The probabilities of failure for each of the devices are, respectively: 10%, 25%, 20%, and 30%. (a) If these components were in series, what is the probability that the system operates

  How to calculate the asphalt content by weight of mix

The VMA of a mixture is 15.0% and the air voids are 4.0%.If the aggregate has a specific gravity (bulk dry) of 2.700 g/cm3 and percent binder absorbed (by the mass of aggregate) is 0.5%, calculate the asphalt content by weight of mix.

  What is the void ratio and the porosity of the sample

An undistured soil sample has a dry unit wieght of 112 pcf with specific gravity of solids equal to 2.68. a. What is the void ratio of the sample b. What is the porosity of the sample

  Density specifications under average operating conditions

Calculate the compacted cubic yards per hour if a compactor with a 5-ft drum width travels at 3 mph over a 10-in. lift of aggregate base course with 4 passes required to meet density specifications under average operating conditions.

  What is the cubic feet of gas storage space in fault block

After injecting 50 MMSCF (14.7 psia and 60 oF), the pressure increase from 2500 to 3500 psia. Deviation factors for the gas are 0.90 at 3500 and 0.80 at 2500 psia and the bottom-hole temperature is 160 oF. What is the cubic feet of gas storage spa..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd