Determine three bars each of mass 3 kg and lenght of 450mm

Assignment Help Civil Engineering
Reference no: EM13561598

1.Calculate the evaporative heat output for the lake. The area, volume, and depth of the lake are irrelevant for this problem:

evaporation rate = 4.6 mm/day

H_L = 2,400 J/g

The formula for the Evaporative heat output is Q_e = Q_m*H_L

2.Three bars each of mass 3 kg and lenght of 450mm are welded together and are pin connected to two links be and cf. neglecting the weight of the links, determing the force in each link immediately after the system is released from rest.

y with bar above it = 0.15m

Reference no: EM13561598

Questions Cloud

Determine its angular velocity after it has rotated through : A slender 9 lb rod can rotate in a vertical plane about a pivot at b. a spring of constant k=30 lb/ft and of unstretched length is 6in is attached to the rod as shown.
Determine the resulting velocity of carriage : A 9in radius cylinder of weight 18lb rests on a 6lb carriage. the system is at rest when a force p of magnitude 2.5 lb is applied ( p is coming out of the car the cylinder is sitting on and going to the right) for 1.2s. knowing that the cylinder roll..
Estimate the ground level so2 : A power plant emits 95 g/s of SO2 from an effective stack height of 60 m. The wind speed is 3 m/s and the solar insolation is slight.
Esitmate the ground level no2 : A factory emits 70 g/s of NO2 from an effective stack height of 40 m. The wind speed is 5.5 m/s and it's a cloudy night. There is an atmospheric inversion at an elevation of 100 m.
Determine three bars each of mass 3 kg and lenght of 450mm : Three bars each of mass 3 kg and lenght of 450mm are welded together and are pin connected to two links be and cf. neglecting the weight of the links, determing the force in each link immediately after the system is released from rest.
Calculate the escalaed dollar irr for an escalated dollar : An investment of $80,000 is projected to generate escalated dollar net revenues (income minus costs) of $10,000 in year one, $30,000 in year 2 and $40,000 in year 3 with a $100,000 salvage
Develop a mass balance for this problem and estimate : You purchase a house with a known radon problem. The house has a 1 m high dirt-floored crawl space. The emission rate of radon into the crawl space is reported to be 0.6 pCi/m2s.
Calculate the maximum bending stress due to the load : Calculate the maximum bending stress due to the load q if the beam has a rectangular cross section with width b=140mm and height h=240 mm.
Compute the least-squares line for predicting vertical : An article reports measurements of expansion for several concrete bridges in the area of Quebec City. Following are measurements of horizontal and vertical expansion (in parts per hundred thousand) for several locations on the Pere-Lelievre Bridge.

Reviews

Write a Review

Civil Engineering Questions & Answers

  What are reasons for difference in coefficient of friction

what are reasons for difference in the coefficient of kinetic friction on horizontal surface with a hanging mass at constant velocity compared to object one on incline

  Suppose the utility encourages its customers to replace

Suppose a utility generates electricity with a 36 percent efficient coal-fired power plant emitting the legal limit of 0.6 lb of SO2 per million Btus of heat into the plant. Suppose the utility encourages its customers to replace their

  Explain how to estimate the diameter of the small pipe

Fluid flows steadily, at a volume rate Q, through a large pipe and then divides into two small pipes, the larger of which has an inside diameter of 25 mm and carries three times the flow of the smaller pipe.

  How are you to tell what the reynols number is

A rectangular concrete channel 4m wide on a slope of 0.002 is designed to carry water(T = 10 C) at discharge rate 25m^3/s. Estimate the uniform flow depth for these conditions?

  Determine the increase in vertical stress at 2m below ground

Three parallel line loads of 500kN/m are applied at ground level in a straight line 4.0m apart. Determine the increase in vertical stress at 2.0m below ground level beneath the middle load.

  Formulate a linear program for blend mix

Formulate a Linear Program for Blend Mix at Bluegrass Distillery, The Bluegrass Distillery produces custom-blended whiskey

  Plot the drawdown after 4 hours as function of position

a confined aquifer with a transmissivity of 7.0x10^-3 m^2/s and a storativity of 5.0x10^-4 is pumped by two wells 35 m apart. One well is pumped at 7.6 L/s and the other at 15.2 L/s.

  How many students have heights equal to 68 inches

how many students have heights, (a) Greater than 72 inches (b) Less than or equal to 64 inches (c) Between 65 and 71 inches inclusive (d) equal to 68 inches * Assume the measurements to be recorded to the nearest inch.

  Determine the maximum possible precipitation at new york

Determine the maximum possible precipitation at New York City that may be encountered on a 100 mi^2 drainage area over a 96 hr period.

  Determine the vertical stress of 4m below the centre

Determine the vertical stress of 4m below the centre of shallow foundation 3 x 3m carrying a uniform pressure of 275 kN/m3. Plot the variation of vertical stress with depth (up to 10m) below the centre of the foundation

  You are part of the structural engineering design team on

you are part of the structural engineering design team on the design of a new five story office building. the

  Calculate the angle between the resultant force

Here are 3 forces acting on the ring. using the non vector approach, determine the resultant force of only the 150 Ib and 100 Ib forces. Also calculate the angle between the resultant force and the positive x axis.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd