Write an eight to ten (8-10) Risk Workshop and Risk Register Component paper in which you:
Identify the required pre-workshop activities.
Prepare a risk workshop agenda based on Day, Sample Agenda for a First Risk Assessment / Two - Day Risk Workshop (Appendix B of the Hillson and Simon text). Include suggested time intervals for each activity and justify why each agenda item is relevant for this case.
DAY
Morning
1. Introductions
2. Confirm project objectives
3. Confirm scope of risk process for this workshop
4. Workshop ground rules
5. Risk management briefing (if required)
6. Expectations and Results
7. Identify risks
Brainstorm risks using the risk breakdown structure
Afternoon
Analyze assumptions and constraints to generate further risks Standard risk checklist to identify any further/final risks
8. Rationalize risks
9. Describe risks using risk metalanguage
10. Record identified risks (during workshop or after meeting)
Determine the top five (5) threats in a risk register, Sample Simplified Risk Register Format (Appendix B of the Hillson and Simon text). Include information from the case for each threat.
Justify the assignment of probability and impacts for each threat identified in criterion number 3 of this assignment.
Document the top three (3) opportunities in a risk register, Sample Simplified Risk Register Format (Appendix B of the Hillson and Simon text). Include information from the case for each opportunity.
Justify the assignment of probability and impacts for each opportunity identified in criterion number 5 of this assignment.
Use at least two (2) quality resources in this assignment. Note: Wikipedia and similar Websites do not qualify as quality resources.
Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides.
Include a cover page containing the title of the assignment, the student's name, the professor's name, the course title, and the date.
The cover page and the reference page are not included in the required assignment page length.
The specific course learning outcomes associated with this assignment are:
Assess and prioritize risks to the project through an analysis of the active threats and opportunities presented.
Apply the Active Threats and Opportunities Management (ATOM) process to ensure a consistent, measurable result of this analysis.
Use technology and information resources to research issues in project risk management
Write clearly and concisely about project risk management using proper writing mechanics.
Attachment:- case_study_pack.rar
|
Represents the p-value shaded
: (a) Does the population have to be normally distributed to test this hypothesis by using the methods presented in this section? Why? (b) If = 48.3 and s = 8.5, compute the test statistic. (c) Draw a t-distribution with the area that represents the ..
|
|
Determine the approximate number of american adults
: According to recent research from the PewFoundation, 91% of all American adults have cell phones of some type. Use the statistics given to determine the approximate number of American adults who would find giving up their phone more difficult than..
|
|
What are your impressions of the environment
: As you have discussed in the class, nonverbal codes have many functions including reinforcing, replacing or contradicting the verbal message. Location and time of day? What are your impressions of the environment (include graphic elements)
|
|
Problem regarding the two population means
: A tomato farmer with a very large farm of approximately 2200 acres had heard about a new type of rather expensive fertilizer which would supposedly significantly increase his production.
|
|
Determine the top five threats in a risk register
: Analyze assumptions and constraints to generate further risks Standard risk checklist to identify any further/final risks
|
|
Estimate the gas rate as pounds per hour
: A larger distillation tower is needed for the same mixture, and it has been decided to use a 12-in. inside-diameter tower with the same type and size of packing.
|
|
What are the risks of revealing mistakes in an open culture
: What are the risks of revealing mistakes in an open culture, as a way of being transparent with patients and families? What are the risks of concealing mistakes and errors
|
|
Mean between two populaces
: It is altogether unique in relation to the t-test and the chi-square test of freedom.
|
|
Estimate the optimum diameter per foot of packed height
: Cost of installed unit, complete with distributor plates, supports, and all auxiliaries = 2.0 times purchased cost of shell and packing
|