Determine the time it takes to break the cord

Assignment Help Civil Engineering
Reference no: EM13306030

A 3 kg mass is attached to one end of a 1 m long cord. The other end of the cord is attached to the center of a rotating disk (with radius greater than 1 m) that has a very large constant angular velocity. The 3 kg mass is dropped onto the rotating disk. If the maximum tension that the cord can handle is 50 N and the coefficient of kinetic friction between the disk and the mass is 0.1, find the time it takes to break the cord. (Assume that the disk is rotating faster than the angular velocity needed to break the cord).

Reference no: EM13306030

Questions Cloud

Determine how many electrons pass through the resistor : A 15 V constant voltage battery is connected to 120 kΩ resistor, How many electrons pass through the resistor
Strategic management and business policy 3 : 1. In the External Factors column, list at least six opportunities you saw in the company you researched. Underneath the opportunities, list at least six threats you saw in the company you researched.
Design and detail two span continuous welded plate girder : assume lateral support at each support and every 20 ft between supports. assume constant depth for girder. use A 572 grade 50steel. use LRFD methods. minimum web thickness is 5/16 inches.
Estimate the maximum charge on the capacitor : Consider a resistor (R=1000 kΩ) and a capacitor (C=1mF) connected in series. Find the maximum charge on the capacitor
Determine the time it takes to break the cord : A 3 kg mass is attached to one end of a 1 m long cord. The other end of the cord is attached to the center of a rotating disk (with radius greater than 1 m) that has a very large constant angular velocity.
How much charge is stored on the capacitor : Skip text editor options A parallel plate capacitor has an area A=10 m2 and a separation of 1Ã-10-4m. How much charge is stored on the capacitor
Determine if its possible to pull at p without causing wheel : If the coefficient of sratic friction between the wheels at B and the ground is 0.5 determine if it is possible to pull at p=1200 lb without causing the wheels at B to slip or the front wheels of A to lift off the ground
Evaluate the service relationship that exists : Evaluate the service relationship that exists between you and a service provider with which you have a longer term relationship.
Determine what is the overflow rate of each tank : two sedimentation tanks operate in parallel. The combined flow to the two tanks is .1 m^3/s. the depth of each tank is 2 m and each has a detention time of 4 h.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Estimate the power required to accelerate a 1350 kg vehicle

The vehicle has a frontal cross -sectional area of 1.9 m^2. The roadway has a straight alignment and a badly patched and broken asphalt surface. assume a drag coefficient of 0.3 and p of air of 1.29 kg/m^3

  Describe what is the definition of a friend function

Provide the function prototype for the following function if it is to be declared as a friend function of class Planet. Include the class declaration and the proper access attribute, but you are not required to add any additional class data or fun..

  How many gallons of water are contained in the tank

Develop a table that shows: 1) How many gallons of water are contained in the tank if the volume is measured in increments of 1 ft from the bottom to the top. 2) The mass of water at each increment, expressed in lbm.

  Determine the largest mass-m which the frame can carry

The frame is desinged to carry the hanging mass at G equal to 167 kg. The frame is supported by a pin connection at C and the rope AB, and constructed with pin connections at points E, F, and D.

  How to determine the diameter of a drilled shaft pile

Using 1630.56 kN as the ultimate capacity determine the diameter of a drilled shaft pile that would have the same ultimate capacity and depth embedment (11.5 m) using the FHWA method. Neglect shaft resistance. Use a F.S. of 2

  Determining the dry volume

A saturated sample of clay with an sl 20 has a natural water content of 32%. What would its dry volume be as a percentage of its original volume of Gs.= 2.67.

  Determine the normal and shear stresses

The grains of wood in the board make an angle of 20 degrees with the horizontal as shown. Determine the normal and shear stresses that act perpendicular and parallel to the grains if the board is subjected to an axial load of 250 N.(Dimensions l=3..

  Determine the total elongation of the steel rod

A steel rod having a cross sectional area of 1/2in^2 and length of 600ft is suspended vertically. It supports a load of 5000 pounds at the lower end. If steel weighs 490 lb/ft^3 and E=30,000,000 psi, find the total elongation of the rod

  List five soil and water management strategies

List five soil and water management strategies appropriate for agricultural use of ultisols. 100-150 word limit.

  Estimate the mean and standard deviation of time

The probability density function, f(t), of the time in hours between storms during the summer in Miami is estimated as f(t) = .014e^(-.014t) if x > 0, f(t) = 0  if x is less than or equal to 0 where t is the time interval between storms in hours.

  Formulate the shear and bending moment expressions

Show/formulate the shear and bending moment expressions for each board, and plot/draw the shear and bending moment diagrams of the boards.

  Determining optimal solution

The company would like to distribute the songs between the two CDs such that the used space on each CD is about the same. Formulate the problem as an IP, and find the optimal solution.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd