A tray rests on an extendible arm consisting essentially of two steel tubes of different outer diameters. The downward force is applied at the tray center F0 = 1000 N. Determine the stresses at the point of tube 1 where the bending and torsional stresses are greatest. Draw the Mohr's circle for that stress state. Both members have a wall thickness of 4 mm

458_641931d3-d719-44e0-8645-1eb3241407e1.png

Reference no: EM131152348

Questions Cloud

Costs for a month : Bubba's Steakhouse has budgeted the following costs for a month in which 1,600 steak dinners will be produced and sold: Materials, $4,080; hourly labor (variable), $5,200; rent (fixed); depreciation, $720; and other fixed costs, $570. Each steak d..
Determine the total charge entering a terminal : Determine the total charge entering a terminal between t=1 and t=2s if the current passing the terminal is i= (3t2-t)A.
Semitool actual excess return : Semitool's products experience more rapid growth than anticipated, thus pushing up the stock price by another 1%. Based on this information, what was Semitool's actual excess return?
What is swimkid margin of safety : Swimkids is a swimsuit manufacturer. They sell swim suits at a selling price is $30 per unit. Swimkids variable costs are $18 per unit. Fixed costs are $70,900. Swimkids expects sales of $268,000 next year. What is Swimkid's margin of safety (in d..
Determine the stresses at the point of tube 1 : Determine the stresses at the point of tube 1 where the bending and torsional stresses are greatest. Draw the Mohr's circle for that stress state. Both members have a wall thickness of 4 mm
Estimated total costs for a production : Total costs were $73,000 when 28,000 units were produced and $96,000 when 36,000 units were produced. Use the high-low method to find the estimated total costs for a production level of 32,000 units.
Describe a high-level timeline that includes key tasks : Describe at least three (3) key milestones and /or deliverables for your project. Describe a high-level timeline that includes key tasks and deadlines. Estimate the project's overall cost and any key staffing and non-staffing resources needed
Expected for the company stock price : The stock price of W Co. is $65. Investors require an 11 percent rate of return on similar stocks. If the company plans to pay a dividend of $3.75 next year, what growth rate is expected for the company's stock price?
Company target debt-equity ratio : Fama's Llamas has a weighted average cost of capital of 10.4 percent. The company's cost of equity is 13 percent, and its pretax cost of debt is 8.4 percent. The tax rate is 40 percent. What is the company's target debt-equity ratio?

Reviews

Write a Review

Civil Engineering Questions & Answers

  Calculate fiber weight fraction for unidirectional carbon

For unidirectional carbon/epoxy tape at a 60% fiber volume fraction, calculate E11 and E22. Given Ef= 211 GPa and Em =10 GPa. Calculate the fiber weight fraction. Given pf=1.95 g/cm3 and pm =1.3 g/cm3.

  Determine the diameter of the pipe assume smooth transition

It is required to reduce a pipe of diameter 8 in to a minimum diameter pipe that allows the downstream velocity not to exceed twice the upstream velocity. Determine the diameter of the pipe. Assume smooth transition

  Plot the vertical load versus the horizontal load

Recommend the friction angle to be used for the foundation design of a 10-story-high building. Explain your recommendation.

  How can you prove that your answer is correct

Would it be possible to compact the above soil at a water content of 13.5% to a dry density of 2.00 Mg/m3? How can you prove that your answer is correct?

  Given bulk density as 1300kgcubic meter and field

given bulk density as 1300kgcubic meter and field capacity as 22 by weight and permanent wilting point as 10 by

  Determine the spiral curve length to satisfy all requirement

A horizontal curve on a two-lane highway is designed with a 818.51ft radius, 12ft lane, superelevation 6.4%, and a 50mph design speed. Deflection angle is 90 degree. The maximum relative gradient is 0.50.

  Problem regarding helium balloons

To float a 160 pound man using helium balloons (assume 0.52 cubic feet per inflated balloon). How many balloons would it take? Assume density of air is 1.29 kg/cubic meter and the density of helium is 0.179 kg/cubic meter.

  Design of building foundations

Perform laboratory tests on soil samples to determine engineering properties and write the foundation report - collect and analyze the geologic/geotechnical literature for the project area

  What is the expected annual savings and expected pw

An energy efficiency project has a first cost of $300,000, A life of 10 years, and no salvage value. Assume that the interest rate is 9%. The most likely value for annual savings is $60,000.

  Determine height from ground and time at which may pass

Ball A is thrown vertically upward from the top of a 30-m-high building with an initial velocity of 5 m/s. At the same instant another ball B is thrown upward from the ground with an initial velocity of 20 m/s. Determine the height from the ground..

  Discuss the effects of the project on the local community

Discuss the effects of the project on the local community of the project described below 1.) The social, economic and environmental significance of the project within the local community 2.) The good, and bad impacts the project might have.

  Determine level of service at which the highway will operate

A 3-mi section of a two-lane, two-way highway located in a mountainous terrain is to be designed to carry a peak hour volume of 750 vehicles. Using the operational level of analysis

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd