Determine the speed of the impellers in rpm

Assignment Help Civil Engineering
Reference no: EM13296991

An impeller-powered flocculation basin is to be designed for a tertiary treatment plant having a flow of 25 MGD. The plant is to employ alum coagulation. and pertient data for the folcculation basin are as follows: detention time = 20 min, G = 35 /sec at 50F, GT = 10000 to 100000, width = 1.25 depth, length = 2width, no baffling, number of impellers = 2, blades per impeller = 6 pitched at 45 degreen angle, impeller diameter = 30% of width, KL = 70 and KT = 1.65
Determine the speed of the impellers in rpm

Reference no: EM13296991

Questions Cloud

What is your percentage return on equity for this trade : Suppose you are correct and the stock falls to $70.50 per share at the end of the year. What is your percentage return on equity for this trade?
Calculate the amount of water to be added per cubic meter : An undisturbed soil sample has a total unit weight of 19.4 kN/m3, a dry unit weight of 16.9 kN/m3, and a specific gravity of soil solids (Gs) of 2.69. If the sample could be saturated without changing its porosity, calculate the amount of water (i..
What is the implied value of each warrant : The current yield on similar straight bonds is 15%. What is the implied value of each warrant? (a) $3.76 (b) $3.94 (c) $4.14 (d) $4.35 (e) $4.56
What is the value of a share of stock : A firm paid a $3.00 dividend last year and dividends are expected to grow at 15% for the next 5 years and 5% thereafter. If the required return is 13%, what is the value of a share of stock?
Determine the speed of the impellers in rpm : The plant is to employ alum coagulation. and pertient data for the folcculation basin are as follows: detention time = 20 min, G = 35 /sec at 50F, GT = 10000 to 100000, width = 1.25 depth, length = 2width, no baffling, number of impellers = 2
Draw and submit a time line : Draw and submit a time line, including EBIT, taxes, depreciation, operating cash flow, tvm factors, and discounted cash flow.
Devise a synthetic strategy to transform : Devise a synthetic strategy to transform 1-Bromobutane to heptane
Determine using energy methods speed of crate after moving : The coefficient of friction between the crate and the floor is µs = 0.4 and µk = 0.3. If P is slowly increased until the crate starts to move and then remains constant, determine using energy methods the speed of the crate after moving 2 m.
How many turns does the secondary have : A transformer for an answering machine takes an ac voltage of amplitude170V as its input and supplies a8.4V amplitude to the answering machine. How many turns does the secondary have

Reviews

Write a Review

Civil Engineering Questions & Answers

  Calculate the normal and shear stress on planes making angle

a tension member with cross-sectional area 3 in2 resists a load of 10 kips. How do you Calculate the normal and shear stress on planes making a 0, 20, 45, and 60 angle with the transverse section.

  Determine specific surfaces in m2 per g units for the sphere

Determine the specific surfaces in m2/g units for the spheres of diameters (a) 10.0 cm, (b) 1.0 cm,(c) 0.1 cm, (d) 0.01 cm. (e) 0.001 cm and (f) 0.0001 cm. Assume the mass density of spheres as 2.5g/cc.

  Determine the acceleration due to gravity at the location

An object has a mass of 46kg and weighs 450N on a spring scale. Determine the acceleration due to gravity at this location.

  Determine the length of time

The 20-lb cart B is supported on rollers of negligible size. If a 10-lb suitcase A is thrown horizontally on it at 10 ft/s, determine the length of time that A slides relative to B, and the final velocity of A and B. The coefficient of kinetic fri..

  Total energy per unit weight of fluid

A fluid flowing in a pipe 30cm in diameter has a uniform velocity of 4m/s. The pressure at the center of the pipe is 40KPa, and the elevation of the pipe's centerline above an assumed datum is 4.5m. Compute the total energy per unit weight of the ..

  What is the total bod loading per day

The factory will use a 4 ft deep on-site lagoon to stabilize the waste with a loading rate of 20 lb BOD/acre-day. Part a) What is the total BOD loading per day?

  Tackling the problem of making tunnel

You are a Project Manager on site where work for 3K.m. long Tunnel has been undertaken. The site is remote and takes about 2 days travel to nearest town. Supervisors, Technicians & Skilled Workers are engaged in dangerous / hazardous work.

  Determine the rate of flow-unconfined aquifer

In an unconfined aquifer having K = 30/m/day, two observation wells, 3km apart, have water levels of 50 and 40 m, respectively, above the base of the aquifer. Determine the rate of flow.

  Crash at a railroad crossing

Due to a crash at a railroad crossing, an overpass is to be constructed on an existing level highway. the existing highway has a design speed of 50 mi/h.

  How much further would the car have skid

The car was travelling on a 3% upgrade on a pavement with friction factor of 0.30. How much further would the car have skid if it did not strike the concrete barrier?

  Hypothetical velocity distribution in a horizontal channel

The hypothetical velocity distribution in a horizontal, rectangular open channel is V=0.3y (m/s), where V is the velocity at a distance y (m) from the bottom of the channel. If the vertical depth of flow is 2 m and the width of the channel is 4 m,..

  Constant head permeability test

A constant head permeability test was conducted on a clean sand sample. The diameter and length of the test specimen were 10 cm and 12 cm respectively.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd