Determine the post construction vertical stress imposed

Assignment Help Civil Engineering
Reference no: EM13305739

Given: A 300-kn loading is supported on a 1.5 m by 1.5 m square foundation constructed on the ground surface of a homogeneous soil deposit (soil unit weight is 19kN/m3).

Required: Determine the preconstruction and postconstruction vertical stress imposed on the soil at a point 2 m below the center of the foundation area (assume westergaard conditions applied)

Reference no: EM13305739

Questions Cloud

What are the excess reserves on the deposit : What is the largest loan that the bank can make on the basis of the new deposit? If the bank chooses to hold reserves of $3,000 on the new deposit, what are the excess reserves on the deposit?
Determine the velocity of roller when theta is given : The bar is confined to move along the vertical and inclined planes. The velocity of the roller at A is Va=5.2 ft/s when theta=40 . a)Determine the bar's angular velocity when theta=40. b)Determine the velocity of roller when theta=40.
Obtain the separation distance of the wires : Two long parallel wires carry currents of 3.85 A and 4.31 A. The magnitude of the force per unit lengh acting on each wire is 3.77 Ã- 10-5 N/m
Is the financial risk of the business different : What would the new debt ratio be if the machine were leased? If it is purchased?
Determine the post construction vertical stress imposed : Determine the preconstruction and post construction vertical stress imposed on the soil at a point 2 m below the center of the foundation area (assume westergaard conditions applied)
What is the balls velocity just before striking the ground : A ball is thrown straight up with a velocity of 18.0 m/s from the edge of the top of a building 30 meters tall. What is the balls velocity just before striking the ground
What is abc after-tax debt payment : In 20X1, ABC paid $40 million in interest and earned $75 million in accounting income.
Design the pins so that the ledge can support doug : Design the pins so that the ledge can support Doug and Jeremy and eight others on each side of the building. Assume each person weighs 200 lbs.Pin properties: Ultimate shear strength = 100 lb/in^2
Estimate the initial temparature of the hot horseshoe : a hot iron horseshoe(mass=0.50kg), which has just been forged,is dropped into 2.7 L of water in a o.45 kg iron pot initially at 22 degree celcius.If the final equilibrium temparature is 27 degree celcius, estimate the initial temparature of the hot..

Reviews

Write a Review

Civil Engineering Questions & Answers

  Find what is the annual crash rate for the intersection

The four approach volumes per day at this intersection are 28,648, 23,856, 12,150, and 10,174. The crash totals for the last 3 years are 91, 96, and 87. What is the annual crash rate for this intersection

  What is the amplitude of the vertical vibration

if the enginer is mounted floatiing on very weak spring, what is the amplitude of the vertical vibration of the engine? (b) if the engine is mounted solidly on a rigid foundation, what is the alternating force amplitude transmitted? Assume the con..

  Determine the height from the ground at which ball pass

Ball A is thrown vertically upward from the top of a 20-{\rm m}-high-building with an initial velocity of 3m/s . At the same instant another ball B is thrown upward from the ground with an initial velocity of 16m/s .

  What is the rockets acceleration in meters per square

At a certain altitude and time, a rocket's acceleration is 2.5 g. One gravity (g) is equivalent to 32.2 ft/s^2. What is the rocket's acceleration in meters per square second

  Find allowable load p that can be supported by connection

A steel bar is attached to a wood support beam with four 20 mm diameter lag screws. The steel bar is 75-mm-wide by 6-mm-thick. For the steel bar, the yield strength is 260 MPa and the ultimate bearing strength is 350 MPa.

  What is tension in the cable connecting the boat to the pier

What is the tension in the cable connecting the boat to the pier Angle of spray 50 degrees off horizontal axis and is spraying toward the pier and pushing the boat away from the pier.

  What is the total bod loading per day

The factory will use a 4 ft deep on-site lagoon to stabilize the waste with a loading rate of 20 lb BOD/acre-day. Part a) What is the total BOD loading per day?

  Find the net force required to hold the bend in place

A 1m diameter pipe bend is carrying water with a steady flow rate of 2 m3/s. The bend has an angle of 90o and lies in a horizontal plane. The volume of water in the bend is 1.5 m3 and the empty weight of the bend is 4 kN.

  Calculate the difference in heat loss through the roof

Your family cabin now has a roof that is rectangular, 60 feet by 20 feet, and is covered by 2 inch thick hardwood siding and tapped wood shingles. You propose adding 2 inches of cellulose fiber insulation under the hardwood.

  Determine what is the air void content of core 2 of mixture

An asphalt mixture is placed and compacted. Two tests are taken from the compacted mixture and checked for density. Core 1 had a density of 2403 kg/m3 and an air void content of 6.5%. Core 2 had a density of 2419 kg/m3.

  Determine the sludge age and cell wastage flow rate

Assume: Suspended solids in effluent negligible Wastage is from aeration tank Yield coefficient = 0.4 Bacterial decay rate = 0.04 1/d Effluent BOD5 = 10mg/L F/M = 0.33 mg/mg*d BOD5 after primary settling = 150mg/L MLVSS = 1700mg/L MLSS = 1.4(MLVSS..

  Calculate the forces exerted by the water on the bend

Water flows through a horizotal 45 deg reducing bend with a 36 inch. diameter upstream and a 24 inch diameter downstream, at the rate of 20 cfs under a pressure of 15 psi at the upstream end of the bend. Neglecting head loss in the bend, calculate..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd