Given: A 300-kn loading is supported on a 1.5 m by 1.5 m square foundation constructed on the ground surface of a homogeneous soil deposit (soil unit weight is 19kN/m3).
Required: Determine the preconstruction and postconstruction vertical stress imposed on the soil at a point 2 m below the center of the foundation area (assume westergaard conditions applied)
The four approach volumes per day at this intersection are 28,648, 23,856, 12,150, and 10,174. The crash totals for the last 3 years are 91, 96, and 87. What is the annual crash rate for this intersection
if the enginer is mounted floatiing on very weak spring, what is the amplitude of the vertical vibration of the engine? (b) if the engine is mounted solidly on a rigid foundation, what is the alternating force amplitude transmitted? Assume the con..
Ball A is thrown vertically upward from the top of a 20-{\rm m}-high-building with an initial velocity of 3m/s . At the same instant another ball B is thrown upward from the ground with an initial velocity of 16m/s .
At a certain altitude and time, a rocket's acceleration is 2.5 g. One gravity (g) is equivalent to 32.2 ft/s^2. What is the rocket's acceleration in meters per square second
A steel bar is attached to a wood support beam with four 20 mm diameter lag screws. The steel bar is 75-mm-wide by 6-mm-thick. For the steel bar, the yield strength is 260 MPa and the ultimate bearing strength is 350 MPa.
What is the tension in the cable connecting the boat to the pier Angle of spray 50 degrees off horizontal axis and is spraying toward the pier and pushing the boat away from the pier.
The factory will use a 4 ft deep on-site lagoon to stabilize the waste with a loading rate of 20 lb BOD/acre-day. Part a) What is the total BOD loading per day?
A 1m diameter pipe bend is carrying water with a steady flow rate of 2 m3/s. The bend has an angle of 90o and lies in a horizontal plane. The volume of water in the bend is 1.5 m3 and the empty weight of the bend is 4 kN.
Your family cabin now has a roof that is rectangular, 60 feet by 20 feet, and is covered by 2 inch thick hardwood siding and tapped wood shingles. You propose adding 2 inches of cellulose fiber insulation under the hardwood.
An asphalt mixture is placed and compacted. Two tests are taken from the compacted mixture and checked for density. Core 1 had a density of 2403 kg/m3 and an air void content of 6.5%. Core 2 had a density of 2419 kg/m3.
Assume: Suspended solids in effluent negligible Wastage is from aeration tank Yield coefficient = 0.4 Bacterial decay rate = 0.04 1/d Effluent BOD5 = 10mg/L F/M = 0.33 mg/mg*d BOD5 after primary settling = 150mg/L MLVSS = 1700mg/L MLSS = 1.4(MLVSS..
Water flows through a horizotal 45 deg reducing bend with a 36 inch. diameter upstream and a 24 inch diameter downstream, at the rate of 20 cfs under a pressure of 15 psi at the upstream end of the bend. Neglecting head loss in the bend, calculate..
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd