Determine the overturning moment of silt and water

Assignment Help Civil Engineering
Reference no: EM13210723

The cross-section of a 5 m long dam for a fresh water lake is shown. Over a period of time, a layer of silt has settled on the bottom to a depth of 2 m. Assuming that silt is equivalent to a liquid having a density of 1760 kg/m3, determine the overturning moment of silt and water about point A.

Reference no: EM13210723

Questions Cloud

What are the basic differences between the afl as a labor : What are the basic differences between the AFL as a labor union and the CIO type of union?
Compute the standard potential for the cell : Electrode composed of chromium in a 1.0 M chromium(III) ion solution and another electrode composed of silver in a 1.0 M silver ion solution, connected by a salt bridge. Calculate the standard potential for this cell at 25 °C
Determine the force developed in the link : The coefficients of kinetic friction between the blocks and the inclined plane are a=0.1,b=0.3. Neglect the mass of the link. Angle between the inclined plane and the surface is 30 degree.
Terms and definitions worksheet. : Terms and Definitions Worksheet. Write brief descriptions for each of the following terms. If you use an outside source to define them, include an APA citation for the source.
Determine the overturning moment of silt and water : Assuming that silt is equivalent to a liquid having a density of 1760 kg/m3, determine the overturning moment of silt and water about point A.
What is the charge on each : Two point charges have a total charge of 260 . When placed 1.50 apart, the force each exerts on the other is 20.2 and is repulsive.
Explain density generally increase decrease : density generally increase decrease or remain unchanged when items are heated,Briefly explain your answer?
How large of a sales increase can the company achieve : How large of a sales increase can the company achieve without having to raise funds externally? Write out your answer completely.
Describe the use of productivity models for estimating land : Describe the use of productivity models for estimating land productivity. Provide details about various attributes that can be used and how the model is developed . Examples can be used to demonstrate model workability.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Designing the tangent vertical curve

Due to a street crossing a roadway, the elevation of the roadway at station 3 +413.760 must be at 129.388 m. Design the curve?

  Compression of a concrete cubes under friction

How do the crack behaves under the compression of a concrete cubes under friction between the plates and specimen with stress strain diagram?

  What is the new water content

A soil sample with a water content of 14.5% and unit weight of 128.2 lb/cu. ft. was dried to a unit weight of 118.8 lb/cu. ft. without changing its void ratio. What is its new water content (in %)?

  Define coil spring which has been compressed

Question about Spring, A 37kg object is placed onto a coil spring which has been compressed 43mm. The force used to compress the spring was 35KN.

  Absolute pressure of the carbon dioxide in the can

The circular top of a can has a radius of .0320m. the pull-tab has an area of 3.8x10^-4 m^2. The absolute pressure of the carbon dioxide in the can is 1.40x10^5Pa. find the force that these gas generates on the top of a can?

  Force required to hold the pipe

A 0.3-m diameter pipeline terminates in a nozzle of outlet diameter = 0.15 m. When water flows through this pipe at a rate of 0.25 m3/s, the force required to hold the pipe (N) is most nearly.

  Magnitude of the acceleration of the train

The train passes point A with a speed of 30 m/s and begins to decrease its speed at a constant rate of at = - 0.25 m/s2. Determine the magnitude of the acceleration of the train when it reaches point B, where sAB = 412 m.

  Estimating the volume of soil in cubic meters

The void ratio of soil in the borrow pit is 1.12. Estimate the volume of soil (cubic meters) that must be excavated from the borrow pit.

  Scale of a spring balance problem

The scale of a spring balance reading from 0 to 235 N has a length of 13.0 cm. A fish hanging from the bottom of the spring oscillates....

  How many short tons of coal are required

How many short tons of coal are required by this plant per year, assuming it operates continuously? If 10% of the coal mass remains as residual ash, how many tons will develop in the ash pile over 25 years?

  Calculating energy for vacancy formation

The number of vacancies in some hypothetical metal increases by a factor of 4 when the temperature is increased from 1090 K to 1140 K. Calculate the energy (in J/mol) for vacancy formation assuming that the density of the metal remains the same ov..

  Required to dewater a construction site

It is required to dewater a construction site 80 m by 80 m. The bottom of the construction will be 1.5 m below the initial water surface elevation of 90 m.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd