Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Vehicular access to the Toronto Island Airport now involves the use of a small ferry, capable of carrying about 8 automobiles or an equivalent number of trucks, which operates across the 150 metre wide body of water known as the Western Gap. Due to significant growth in traffic to the Island Airport, consideration is being given to bridging the channel with a two lane (7.4m) road. Surveys indicate that, in order to provide adequate clearance for the majority of pleasure craft using the channel, the elevation of the road surface over the entire width of the channel must be 6.0 metres above the existing road surface. Because there are many large tanker trucks involved, the maximum permissible grade is 3.0%. For a design speed of 70 km/h, determine the minimum distance from the channel edge where it would be necessary to begin elevating the road.
Note: For this problem use tables on vertical curves (vertical curve design tables)
You have been assigned to design a heat exchanger to cool a gaseous process stream in a chemical plant. The stream flow at 20 kg/s and enters at 431 oK, It has a heat capacity of 3.45 J/g-oC , and needs to be cooled to 402 oK.
The initial velocity of a 15-lb block is given as mv1=15i+15j (ft/s). A force defined by F=250i-250tj (lb) acts on the particle from time t=0 to time t=0.3 s for a total duration of 0.3 s. Determine the particle’s velocity at t=1 s. Neglect friction.
A rectangular concrete channel is 3 m wide and 2 m high. The water 20 deg Celsius in the main channel is 1.5 m deep and is flowing at a rate of 30 m^3/s. determine the flow area, wetted perimeter, and hydraulic radius. is the flow laminar or turbu..
The initial ultimate BOD after mixing of the Bergelmir Riveris 12.0 mg/L. The DO in the Bergelmir River after the wastewaterand river have mixed is at saturation. The river temperature is 10degrees celsius
How much differential settlement is causing the additional stress of 4,000 psi in girder that is rigudly attached to columns at either end of its 50-ft span. The moment of inertia of the beam is 15,000 in4, and it is a 24-in.-deep beam section.
An area that varies in elevation from 463ft - 634ft is being mapped. What contour intervals will be drawn if a 50ft interval is used? Which lines are emphasized?
Determine the required size of new Schedule 40 steel pipe to carry 0.5 cfs (Q = 0.5 cfs) of water at 160o F with a maximum pressure drop of 10 psi per 1,000 ft.
A solid circular shaft AC of total length L=L1+L2 is fixed against rotation at ends A and C and is loaded by a tourqe T_b at joint B. If the diameter of the two segements of the shaft are in ratio d2/d1
Find the nominal flexural strength from part (d.) to the service capacity from part (c.). e.) Compute the ratio of the flexural strength from part (d) to the service capacity from part (c).
A hydroelectric facility operates with an elevation difference of 50.0 m with a flow rate of 500 m3/sec. If the rotational speed is 90 rpm, determine the most suitable type of turbine and estimate the power output of the arrangement.
Forces F and P have magnitudes of F=40 lb. and P= 60 lb., Using the paralellogram law, determine the magnitude of the resultant R and the angle theta it makes with the horizontal. The given angle is 40 degrees.
A flow of 4.8 m3/s is to be developed from a 500 km2 watershed. The reservoir is estimated to cover 1,700 ha. The annual rainfall is 97 cm, the annual runoff is 30 cm, and the annual evaporation is 120 cm
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd