draw shear and bending moment diagrams determine the maximum stress on the beam (E=2.0E+11Pa) a simply supported beam AB is 5 m long carrying a uniform distributed load of 10kn/m over a 4m span

Reference no: EM13305638

Questions Cloud

The social economy: finding a way between market and state : Write 900 word summary for given case study. Summary should be less than 20%, more on your personal reflection and opinion.
What is the temperature gradient along the length of the bar : A copper bar 2.5 m long has a circular cross section of radius 2 cm. One end is kept at 80oC, what is the temperature gradient along the length of the bar
Determine the volumetric flow rate in each 15-cm duct : Air enters an electrical furnace at 20oC, 100 kPa, with a volumetric flow rate of 30 m3/min. The furnace delivers air at 40oC to a duct system with three branches consisting of two 15-cm-diameter ducts and a 30-cm-diameter duct.
How do the two images differ from each other : an object is at a distance d to the left of a flath screen. A converging lens with focal length f
Determine the maximum stress on the beam : draw shear and bending moment diagrams determine the maximum stress on the beam (E=2.0E+11Pa) a simply supported beam AB is 5 m long carrying a uniform distributed load of 10kn/m over a 4m span
What does the beta of the new security have to be : You have another $8,000 to invest, and would like to invest it in a manner such that the risk of the new portfolio matches that of the overall market. What does the beta of the new security have to be?
What length would be recorded by the observer : A meter stick travels past an observer at the speed of 0.9c. What length would be recorded by the observer
Compute the permability based on the conditions and results : A constant head permability test is performed on a soil that is 2 cm X 2 cm square and 2.5 cm long. The head difference applied during the test is 18 cm, and 5 cm^3 is collected over a time of 100 sec.
What is the projected inventory turnover ratio : All dollars are in millions. What is the projected inventory turnover ratio for the coming year?

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determine the flow area

A rectangular concrete channel is 3 m wide and 2 m high. The water 20 deg Celsius in the main channel is 1.5 m deep and is flowing at a rate of 30 m^3/s. determine the flow area, wetted perimeter, and hydraulic radius. is the flow laminar or turbu..

  Design of wastewater treatment plant for a community

Consider the design of wastewater treatment plant for a community wiyh average daily and peak hourly wastewater design flows of 2.0 mgd. The raw sewage has an average of 230 mg/l BOD5 and 260 mg/l of suspended solids.

  Municipal utility-considering two large-scale conduits

A big municipal utility district is considering two large-scale conduits. The first includes construction of a steel pipeline at a cost of $200 million.

  Explain what is the hydraulic residence time of the river

An industry is illegally discharging benzene into a river. The concentration in the river at the point of discharge is 0.2 mg/L. A drinking water treatment plant (DWTP) is located 1.5 km downstream. The water velocity in the river is 0.35 km/day.

  Probelm relating to fire a bullet

A bullet is fired from a height of 150m at a velocity of 300kmph at an angle of 35 upward. Neglecting air resistance. Find: a) total time of flight b) horizontal range

  Determine the power that must be supplied

determine the power that must be supplied to the motor at this instant. The motor has an efficiency of 76 %. Neglect the mass of the pulleys and cables.

  What are the important findings

What are the important findings in Austin Road Co. v. OSHRC and Builders Steel Co. v. Marshall? Your response should be approximately 200 - 300 words and include a reference citation for your response.

  Calculate compressive capacity using australian standard

A client has engaged your consultancy company to undertake a conversion of a warehouse to a residential dwelling in the northern city of Darwin. You are required to check the capacity of a proposed column to ensure it can support a mezzanine floor..

  Ehermal conductivity of the radioactive wastes

The outer surface of the tank is cooled by air at 300 K with a heat transfer coefficient of 100 W/m2K. Determine the maximum temperature in the tank. Take the thermal conductivity of the wastes as 2.0 W/mK.

  What thickness of bc will result in same compressive stress

A second load P2 is uniformly distributed around the cap plate at B. The diameters and thicknesses of the upper and lower parts of the post are dAB= 1.25 in, tAB= 0.5 in, dBC= 2.25 in and tBC= .375 in respectively.

  Estimate the pullout length required for each reinforcement

A continuous geogrid having a reinforcement coverage ratio equal to 100 percent. A continuous metallic grid consisting of W4 bars having a diameter equal to 5.7 mm, a distance between longitudinal bars equal to 150 mm, a distance between transvers..

  Determine the differential settlement

Determine the differential settlement between the centre line of the ring beam and under the centre of beam. The inner and outer radii of the ring beam are 8m and 12m respectively.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd