Determine the magnitude of the resultant r and angle theta

Assignment Help Civil Engineering
Reference no: EM13309787

Forces F and P have magnitudes of F=40 lb. and P= 60 lb., Using the paralellogram law, determine the magnitude of the resultant R and the angle theta it makes with the horizontal. The given angle is 40 degrees.

Reference no: EM13309787

Questions Cloud

Obtain the change in internal energy of the air : The air inside a bicycle tirenpumphas 202 joules of work done on it as 66.1 joules of heat is conducted away from it
Create a text file called yourstudentid : Create a text file called YourStudentId-Create.sql (format xxxxxxx-Create.sql) for example 2225991- Create.sql that will.
Determine the resolving power of the objective : What is the resolving power of the objective if it is used in an oil-immersion microscope with n oil = 1.45
What is an unconscionable contract-exculpatory clause : What is an unconscionable contract, exculpatory clause, and Blue Sky laws and give explanations and examples of each?
Determine the magnitude of the resultant r and angle theta : Forces F and P have magnitudes of F=40 lb. and P= 60 lb., Using the paralellogram law, determine the magnitude of the resultant R and the angle theta it makes with the horizontal. The given angle is 40 degrees.
Estimate the velocity of a wave on this bungee cord : A bungee cord is stretched between two poles with a force of 411 N. What is the velocity of a wave on this bungee cord
The residual and tidal volumes are important to consider : The residual and tidal volumes are important to consider. Assume that an allergen is in an aerosol form (1.0g/L air) and can be inspired and expired at the same rate a normal air. When first exposed to the allergen, how long will it take to reach equ..
Bank operations using t accounts : Bank operations using T accounts
Large multi-national projects : What challenges do you see for large multi-national projects, and what solutions would you suggest to keep communication channels open and strong?

Reviews

Write a Review

Civil Engineering Questions & Answers

  Find magnitude of the velocity and acceleration of light

The search light is rotating at a constant rate of 4 rad per second. Find the magnitude of the velocity and acceleration of the spot of light on the wall when the search light beam makes a 45 degree angle with the wall.

  Develop an estimate of the volumetric flow rate of air

Develop an estimate of the volumetric flow rate of air that will be required for aeration of the mixed liquor in an activated sludge system.For this calculation, assume that the (ultimate) CBOD is 200 mg/L and (ultimate) NBOD is 50 mg/L.

  Determine time at which collar starts to slip relative to it

The coefficient of static friction between the collar of mass m=2 kg and the bent bar is Us=0.35, and the collar is initially d=70 cm from the spin axis AB. Assuming the motion starts at t=0, determine the time at which the collar starts to to sli..

  Determine what is the minimum standard size that is needed

a mountain water reservoir in a national park is to provide water at a flow rate of Q= 200 gpm and a minimum pressure of 40 psig in the lodge of the valley 200 ft below the reservoir.

  Calculate the coefficient of permeability

The temperature was 200C, and the void ratio (e) of the soil was 0.43. Calculate the "Coefficient of Permeability" in "centimeters per second" (Given, k = (QL)÷(A Δh t)).

  Determine the height of the weir p and the weir length

The discharge range is 0.1 to 1.0 cfs. The maximum approach flow depth is 18 inches. Determine the height of the weir P and the weir length l in the flow direction. Assume cv =1.

  Determine what is the runoff rate into the inlet grate

A paved parking lot section has a uniform slope over a length of 100 m (in the flow direction) from the point of a drainage area divide to the inlet grate, which extends across the lot width of 30 m.

  What will be the total cost per lane-mile per inch depth

If an alternative base material is available for $5,791.50 per lane-mile per inch depth, to use it, the minimum depth for asphalt has to be increase to 6 inch with no change of base and subbasedepth. What will be the total cost per lane-mile per i..

  Determine the operating speeds of the machine

Determine the operating speeds of the machine at which the machine's steady-state amplitude is less than 0.2 mm. Take keq = 3 EI/L3.

  Determine is there any runoff from the area during the storm

During a 5 hour storm event, the precipitation over a 230-acre area is 1.5niches. There is constant infiltration at a rate of 0.12 inches/hour and the depession storage is 17 acre-ft. Is there any runoff from the area during the storm

  What type of aquifer material do expect in the location

A dye test reveals that the specific discharge between the two wells is about 2.75 m/day. if the wells are 45m apart, What type of aquifer material do you expect in this location

  Define left side as starting and the right side as ending

Create a precedence (activity-on-node) diagram based off the attached activity list. You must follow the below recommendations as we discussed in class. 1) draw nodes as rectangles. It helps define the left side as starting and the right side as en..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd