Determine the hydrostatic force on one side of a vertical

Assignment Help Civil Engineering
Reference no: EM13557099

Determine the hydrostatic force on one side of a vertical clrcular gate of diameter 1.5m when its centre is immersed at a depth of 6m neto-w tne free surface of water in a reservoir. Determine also the depth from the surface to the line of action of this force. you are reminded that the second moment of area for a circle about its centroid is given as:

Ic - nd4 /64 where d = diameter.

Explain briefly what additionalforce you would need to calculate if the

gate were located in an embankment inclined at an angle 0 from the

Reference no: EM13557099

Questions Cloud

What is the probability that if you purchase the car : An automobile that you are looking at purchasing has an advertised fuel mileage of 30 miles per gallon. You rent the car for a week and track your mileage to school and back home and get (miles/gallon):
What is the work done by the wire : Water boils at room temperature of 25 degrees celsius when the pressure is 3.17 kPa (abs). Express this as a vaccum gage pressure (in mmHg) if atmospheric pressure is 101 kPa. Provide details of work to get a good rating.
Determine the flow rate : A heat pump operates between 250K and 300K. The cooling rate is 3.6 kW while the work input rate is 1.2 kW. The COP for the heating achieved is? Provide full details of work to receive good rating.
Assume the pressure increased linearly with volume : A certain fluid at 15 psia is contained in a cylinder behind a frictionless piston. The initial volume of the fluid is 300 in^3. The fluid expands to a volume of 450 in^3 while the pressure increases to 25 psia
Determine the hydrostatic force on one side of a vertical : Determine the hydrostatic force on one side of a vertical clrcular gate of diameter 1.5m when its centre is immersed at a depth of 6m neto-w tne free surface of water in a reservoir.
Determine the gauge pressure head and the absolute pressure : A vertical tank of 4.sm2 cross-sectional area is filled with 13.5m3 of water, 9.0m3 0f a fluid with an s.G. of 3.2,6.75;. or oir with an s.G. of 0.85 and 0.9m3 of mercury with an s.G. of 13.s7.
How many drums are required if the project is to be complete : If 140,000 cy of compacted fill are required using the type of compaction drums described, how many drums are required if the project is to be completed in 25 working days?
What is the penetration h for the pile : A pile resists the tension developed by three stay cables for a major for a tent (membrane) structure. Assuming no bending is desired in the pile (no resultant horizontal componenet), what is the magnitude of the force S if the and (theta sub S)
What is the greatest vertical height ball achieves : A ball is thrown with a valocity of 30 m/s at an angle of 40 degrees above the horizontal from the top of a 100m tall building. a) what is the greatest vertical height ball achieves? b) what is balls velocity when it lands. (neglect air resistance in..

Reviews

Write a Review

Civil Engineering Questions & Answers

  Smply supported beam l1l2 m long carries a point load gk

simply supported beam l1l2 m long carries a point load gk a kn qk b kn at mid-span and its self-weight with fire

  Determine the maximum allowed distributed force per length

Let the lengths be 600mm and 300mm , and the angle 50 degrees . If the permitted additional elongation of the cable is 0.20mm , determine the maximum allowed distributed force per length q.

  Determine how many kilograms of sulfur would be emitted

coal has about 2% sulfur. How many kilograms of sulfur would be emitted from coal fired plints in the US in 1 yr US electricity production is about 0.28 * 10^12 watts, & coal has an energy content of about 30*10^6 J/kg

  What is the minimum number of expansion joints required

A BRIDGE BUILT WITH STEEL GIRDERS IN 500mm in length and 50 m inwidth.Expansion joints are provided to compensate for the change inlength in the support girders as the temperature fluctuates

  Find index r and recurrence relation compute

You will be using a large crane... lets say one with a capacity of 30T. What considerations need to be made prior to picking up a 15T load with the crane? If you are familiar with the use of a crane be sure to include the discussion of the outriggers..

  Determine which should be the tangent function

in the first couple steps you are using the sine function to derive that the interior triange BCG is a right triangle. However, the sine function, by definition, is opposite divided by hypotenuse.

  What hydrodynamic model would you use for the system

Solar cookers can be used in less developed countries for cooking and also for thermal disinfection of water. To disinfect water, the water must be heated to about 35 Celsius for 5 hours. Of course, it takes time to raise the temperature of the wa..

  Determine what is max amount of cargo that can be carried

A small truck is to be driven down a 4% grade at 70mi/hr. The coefficient of road adhesion is 0.95, and it is known that the baking efficiency is 80% when the truck is empty and decreases by one percentage point for every 100 lb of cargo added.

  What is the probability that the channel will be overtopped

If the channel is overtopped for 2 years in a row, renovation cost will increase too much. What is the probability that the channel will be overtopped for only 2 years in a row in a 4 year period

  What is the discharge rate per unit width of the aquifer to

To avoid the salinization of soil in a farming area, parallel drainage canals are to be installed to maintain the water table at a depth of at least 4m below the ground surface. It is thought that no evapo-transpiration would occur below that depth.

  How many 3-4 inch diameter rivets are required to transmit

How many 3:4-inch diameter rivets are required to transmit 55,000 lb from the two angles to the gusset plate if the allowable shear stress in the rivets is 15,000 psi Assume each rivet carries the same amount of load.

  Find the final speed

Two carts with masses of 4.72 kg and 2.84 kg move toward each other on a frictionless track with speeds of 4.86 m/s and 3.97 m/s respectively. The carts stick together after colliding head-on. Find the final speed.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd