Determine the generator voltage schedules

Assignment Help Other Engineering
Reference no: EM131426669

Problem and Report -

A skeleton power system is shown in Figure 1.  The equipment specification for the system to be designed are provided in Appendix C. The performance criteria and methods to meet the criteria are provided in Appendix A. Using a power flow program, manual calculations and knowledge learned in class, the power system was designed to meet the criteria while minimizing the cost of equipment and dispatching generation in the most economical manner.

The report is broken into the following sections:

Section 1: Component Models and Parameter Evaluation.

Section 2: Preliminary Base Case and its Deficiencies

Section 3: Series and Shunt Compensation Calculations for the 345 kV line.

Section 4: Justification for Any Added Lines

Section 5: Equipment Schedules and Flow Diagrams.

The sequence of activities used to complete this system design and prepare the final report are given in Appendix B.

Appendix B - Sequence of Steps Used for Completing System Design

1- Make calculations for the system model using 100 MVA base and kV bases of 22 kV, 230 kV and 345 kV.

2- Prepare impedance diagram

3- Prepare data for computer program input

4- Make computer data file

5- Run preliminary base case.  (Heavily loaded system.)  Hint: You will need to add fictitious generators at buses to get the power flow to solve.)

6- Determine series capacitor requirements for the 345 kV lines assuming you'll need to ship all 600 MW from generators 1 and 2 over one line (one line out) under heavily loaded case.

7- Determine fixed shunt reactor requirements under lightly loaded case to compensate for the Ferranti Effect on the 345 kV lines

8- Determine the need for additional lines or equipment

9- Determine the generator voltage schedules, transformer tap schedules and switched shunt reactor and capacitor requirements for voltage control for base case.  (See definition of the base case: heavily loaded etc.)

10- Determine the generator voltage schedules, transformer tap schedules and switched shunt reactor and capacitor requirements for voltage control for lightly loaded case.

11- Fill in the schedule templates for the heavily loaded case with one line out of service and the lightly loaded case.

Attachment:- Assignment File.rar

Reference no: EM131426669

Questions Cloud

Write a summary discussing the cognitive processes associate : Write a summary discussing the cognitive processes associated with language and their functions.Write in a clear, concise, and organized manner; demonstrate ethical scholarship in the accurate representation and attribution of sources.
Draw and label the graphs of the pdf : 1. Draw and label the graphs of the pdf (together, on one set of axes) of N(0,1) and N(-1, 2). Your graphs should display how the different parameters of the two distributions affect the pdfs.
What is the mean time until the document begins to print : What is the mean time until the document begins to print?- What is the probability that the document will begin to print within 30 seconds?
Find info about iceland imports : Identify the top 5 countries that both countries receive their imports. Identify the top 2-3 product groups imported by each country. List the product code and abbreviated title.
Determine the generator voltage schedules : The sequence of activities used to complete this system design and prepare the final report are given in Appendix B. Appendix B - Sequence of Steps Used for Completing System Design. Determine the generator voltage schedules, transformer tap schedule..
Discuss overcoming chemical and behavioral addictions : According to Grant, Potenza, Weinstein, and Gorelick, "behavioral addictions are often preceded by feelings of "tension or arousal before committing the act" and "pleasure, gratification, or relief at the time of committing the act" (Grant, Potenz..
Members of the project team and key stakeholders : Who should be included as members of the project team, key stakeholders, and project sponsors in a clinical project in a physicians office? In a hospital? Support your choices.
About their product before they put out on the market : What are questions a company should ask about their product before they put out on the market? What are the steps a buyer thinks about before they purchase a product? What might influence their decision, such as brand types or prices? As you get olde..
Venture capital for software development : Hart Venture Capital (HVC) specializes in providing venture capital for software development and Internet applications. Currently HVC has two investment opportunities:

Reviews

len1426669

3/14/2017 4:41:58 AM

Please follow the template for step by step instructions. Remember: You are writing a report to be read by a colleague. You should be deleting anything I have here that is a hint/direction for you. You will lose points if leave irrelevant text in the report.

Write a Review

Other Engineering Questions & Answers

  Dawes road and jeff hamilton road intersection redesign

Dawes Road and Jeff Hamilton Road Intersection Redesign. The Mobile County and Alabama Department of Transportation desire a redesign of the intersection of Jeff Hamilton Road and Dawes Road due to safety issues and poor level of service.

  Discuss common challenges of managing projects

Also, provide a discussion of the Project Management Institute and the PMP professional certification. Do you think professional certification helps to improve the quality of Project Manager's working in industry today? Why or Why not?

  The following system of non-linear equations

1. In an Excel worksheet titled "Solver", solve the following system of non-linear equations using the Solver and find u, v, and t. Eqn

  What are the cycle times and hourly productions

What are the advantages and disadvantages of in-pit crushing - If all other factors remain the same which haul route should be selected on the basis of shortest cycle times? What are the cycle times and hourly productions?

  Explain polar winding and its limitations

Explain polar winding and its limitations.- What are the differences between SMC and BMC?- With reference to autoclave and vacuum bagging: (a) What is a release film?, (b) What is a peel-ply?, and (c) What is a breather?

  Draw the common emitter transistor bias configuration

BEKG 1123- ASSINGMENT - Print the waveform's input and output. Repeat the same proses for others two Q point. Conclude where the best Q point is for maximum output and explains why.

  What is the uniform deterministic arrival rate

what is the uniform deterministic arrival rate if the vehicle queue is cleared 35 minutes after vehicles begin to arrive?

  Explain the main purpose of an interrupt signal

Explain the main purpose of an interrupt signal. Give an example of how the interrupt is used. Why should we use pull-up and pull-down resistors on some input or output circuits to the Arduino board?

  Make a sketch of the deformed shape of a beam

Make a sketch (not to scale) of the deformed shape of a beam subject to a positive bending moment Mx. Make sure your drawing shows the thickness of the beam; i.e., do not idealize the beam by a line.

  Find required value of c and minimum required value of gm

Design the cross-coupled LC oscillator of Fig. to operate at ω0 = 20 Grad/s. The IC inductors available have L = 5 nH and Q = 10. If the transistor ro = 5 kΩ, find the required value of C and the minimum required value of gm at which Q1 and Q2 ar..

  What is the maximum dc voltage you could expect to obtain

What is the maximum dc voltage you could expect to obtain from a transformer with a 3 Vrms secondary using a bridge circuit with a filter capacitor?

  Create a multi-sim diagram

Create a MULTI-SIM diagram - Verify design of MULTI-SIM design with, calculations and a screen shot of resul

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd