A piston-cylinder device contains 0.2kg of water initially at 800 kPa and 0.06m^3. Now 200 kJ of heat is transferred to the water while its pressure is held constant. Determine the final temperature of the water. Also, show the process on a T-v diagram with respect to saturation lines.

Reference no: EM13303551

Questions Cloud

If the economy were experiencing high rates : If the economy were experiencing high rates of unemployment and low inflation, the appropriate monetary policy strategy would most likely be: a. to have the Fed sell securities on the open market.
What is the tension in the left side string : A 20.0-kg mass is supported by two strings. The left string is 2.00 m long and the right string is 5.00 m long. What is the tension in the left side string
Determine magnitude of unbalanced force acting on particle : The path of motion of a 7-lb particle in the horizontal plane is described in terms of polar coordinates as r= (3t+2) and theta=(0.2t^2-t) , where t is in seconds. Determine the magnitude of the unbalanced force acting on the particle when t=3s.
Describe the situation facing mensa at the time of case : Describe the situation facing Mensa at the time of the case. This should include the major issues facing the company and the decisions that need to be made. You are to spend no time on corporate history. You must consider the past, but your analysis ..
Determine the final temperature of the water : A piston-cylinder device contains 0.2kg of water initially at 800 kPa and 0.06m^3. Now 200 kJ of heat is transferred to the water while its pressure is held constant. Determine the final temperature of the water.
How far from the lens must the screen be placed : A slide projector has a lens of focal length 150. mm. An image 100. cm × 100. cm is formed of a slide whose dimensions are 50.0 mm × 50.0 mm
What is the speed of the jeroboam seen by captain ahab : You are in a radar station on the coast. You are monitoring the motion of two ships. The Pequod is 4.00 km away, What is the speed of the Jeroboam seen by Captain Ahab
Does the subject driver have enough time to read the sign : The letter size is such that the sign can be ready by a person with 20/20 vision from a distance of 200 ft. Does the subject driver have enough time to read the sign at a speed of 30 mi/h
Brief description of the nossal institute for global health : Give a brief description of the Nossal Institute for Global Health (Nossal) and outline how climate change is likely to affect Nossal's business operations in developing countries.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determine at which of the two points the elevation is higher

At point 2, the velocity and pressure are 14 ft/s and 23 psi. Determine at which of these two points the elevation is higher. Calculate the height difference. (Assume the sp ecific gravity of butane is 0.6 and that the butane is at a temperature o..

  What will be the force in newtons required

A lunar module weights 1500 kg on earth where g = 9.75 mps2. On the surface of the moon where g = 1.70 mps2, what will be the force in Newtons required to accelerate the module at 10 mps2?

  What will be the total vehicle delay

Assuming D/D/1 queuing, what will be the total vehicle delay?

  Calculate the surface area of the clay particles

The surface area of clay particles can be determined by measuring the number of adsorbate molecules it takes to form a monolayer. The adsorbate molecules used for these measurements are usually N2 gas, therefore partial pressure "P" is used instea..

  Establish a horizontal distance

a tape is calibrated and found to measure 100.04ft between the 0- and 100-ft marks. what measurements should be laid out to establish a horizontal distance of 682.25ft?

  How many tons of asphalt concrete will be require to overlay

How many tons of asphalt concrete will be required to overlay a 3-mile-long, 24-ft.-wide road with 2.5 in. of wearing course asphalt concrete that has a density of 146.3 pcf

  Find the direction of flow

A conical tube of length 8 m fixed vertically with its smaller end upwards. The velocity head and pressure head at upper ends are 1.27 m and 2.50 m respectively. The velocity head and pressure head at lower ends are 0.203 m and 5.407 m respectivel..

  Design the roof slab as a one-way slab system

Design the roof slab as a one-way slab system and use the worst case design scenario to determine the reinforcing for the entire roof

  Find what is the fluid velocity ft per day in the aquifer

Two monitoring wells were constructed in an unconfined aquifer. The wells are separated by a distance of 250 ft. The water surface elevations in the up-gradient and down-gradient wells were 101.00 and 100.85 ft, respectively.

  Determine the required volume flowrate qm in the model

Model tests are to be performed to study the flow through a large check valve having an inlet diameter of 2 feet and a volume flowrate Qp of 30 cfs. The working fluid in the model is water at the same temperature as that in the prototype.

  Determine the basin dimensions

Determine the basin dimensions (width, length, depth) for a detention time of 3 hours and a length to width ratio of 4 to 1. (use English units)

  Determine the acceleration of the car

Motor M draws in the cable with an acceleration of 4 , measured relative to the 220 mine car. Determine the acceleration of the car. Neglect the mass of the pulleys.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd