Determine the factor of safety against failure for pillar

Assignment Help Other Engineering
Reference no: EM131487129

Questions

1. A coal mine is using the room and pillar mining method to mine a seam. The rooms are 6m wide driven on 25m centres. Entries and entry crosscuts have the same dimensions. If no barrier pillars are left, calculate the percentage recovery both with and without pillar recovery.

2. A mining recovery rate of 60% is required in an underground coal mine using the room and pillar mining method. All entries and cross cuts are 6m wide. Pillar recovery is not undertaken and barrier pillars are not used. Determine the pillar dimension to provide the required recovery, assume square pillars

3. A retreat longwall coal mining system utilises twin accesses on both the intake and return sides of a panel whose face width is 250m. If the access drives are 4.5m wide and chain pillars are 40m wide and square between the accesses determine the extraction ratio for the following cases:
a) Panel under development
b) Panel under production

It may be assumed that a barrier pillar of 40 m width is left to protect the main mine entries and that the panel length is 2km.

4. The diagram below illustrates the amount of coal that is left intact after mining in pillars and the amount of coal that is extracted in the rooms. If a1 = 20m, a2 = 22.5 m, b1 = 5m and b2 = 4.5m determine the recovery ratio in a 2.5 m coal seam.

364_Figure.jpg

5. The hauling speed of a shearer whilst cutting a coal face bi-directionally is 7 m/min. A web of 1 m is cut with a cut height of 3.5 m.
a. How long does the shearer take to cut a complete strip of coal if the face length is 275m?
b. If the coal has a density of 800 kg/m3 how many tonnes of coal are cut in a single strip?
c. Assuming a turnaround time of 30 minutes following each strip of coal cut and assuming an effective 50 minute hour, how many strips can be mined over a 8 hour shift and how many tonnes are produced?

6. A room and pillar mining operation uses 5m wide rooms and 35m square pillars to extract a 3m thick coal seam.
a. Determine the extraction ratio for the workings
b. If the workings are located 450m below ground and the overlying strata has an average density of 2500 kg/m3 (assume g = 9.81 m/s2) what is the vertical stress on the virgin seam?
c. If the stress concentration factor following mining can be expressed in the form 1/(1-ER) where ER is the extraction ratio determine the stress on the remaining pillars
d. If the formula

Pillar Strength (Mpa) = 7.2 p0.46/m0.66

Can be applied where p = pillar width (m) and m = pillar height (m), determine the pillar strength

e. Determine the factor of safety against failure for the pillar.

7. An LHD has a bucket capacity of 4.5m3. The material being handled has a loose density of 2000 kg/m3 and the bucket fill factor is 0.9. Loading time including manoeuvring is 23 seconds and dump time is 12 seconds including manoeuvring. Acceleration and deceleration are equal at 0.3 m/s2. The one way haulage distance is 250m and the maximum speed of the unit is 2.5 m/s. Determine the following:

a) The acceleration and deceleration times
b) The acceleration and deceleration distances
c) The maximum speed haulage distance (it can be assumed that the maximum speed is the same for the full and empty elements of the run)
d) The fixed cycle time
e) The variable cycle time
f) The total cycle time
g) If the machine has an availability of 50 minutes per hour how many cycles per hour can be achieved
h) The productivity of the unit per hour

8. An ore body dips at 80° and has a vertical depth of 120m. The top of the ore body is 200m from the surface and surface mining operations have been discarded in favour of underground operations. The strike length of the deposit is 450m. The ore body varies from 8m to 20m and averages 15m. Grades are as follows:
Lead = 10% (90% recovery)
Zinc = 15% (85% recovery)
Silver = 120 g/t (60% recovery)
Gold = 2 g/t (50% recovery)
What is the total ore resource in tonnes, assume an SG of 3.6, and what is it worth at today's metal prices in A$?
Note: to calculate the worth of an ore body recovery must be considered. Recovery as quoted in the above figures means mill recovery

9. The following describes a mineral deposit. For the deposit you are required to select a suitable mining method for the deposit based on the information given and to describe the mining system in detail. The following should be included in the answer/report:
a. Describe suitable surface connection(s).
b. Detail development requirements
c. Detail Production requirements including a full description of the method selected.
d. Number of production unit's required/rate of production.
e. Describe loading/haulage requirements
f. Equipment
g. Briefly describe ventilation/drainage requirements
h. Personnel
i. Safety

As well as any other salient points as required by the mining system.For economic analysis use current market prices in A$ for the commodity as required. Accurate costings are not an essential aspect to the project but some notional costings should be undertaken to illustrate the viability of the method detailed.

A massive silver/lead/ zinc deposit approximately 250 m in width and 1,500m long ranging in depth from 300m below surface to 900m below surface. Angle of dip is 70°. The deposit grades 2g/tonne silver, 1.5% lead and 2% lead. The deposit is remotely located, however an airstrip can be developed. Additionally the site is located 15km from a rail route to a suitable port facility located 500km distant and 5km from a sealed two lane road.

Verified Expert

The material which are used in usual market or in industries is a product of mines. There are various material are available in market which is extract from mines only. There are different purpose and application of the material which are available. The process of recover that material is called mining. There are various mining process are available and there are different use according to requirement and according to convenience of that particular product.

Reference no: EM131487129

Questions Cloud

How would an engaged workforce address those issues : Analyze how James Bradshaw came to understand employee engagement as a way to ensure the ongoing business effectiveness of Modern Appliances.
What would be its cost of equity : What would be its cost of equity if it took on the average amount of debt for its industry at a cost of debt of 6.4 %?
Explain the strengths and weaknesses of the company : You will Explain the strengths and weaknesses of the company and write a report either recommending or not recommending purchase of the company stock.
What does that program do to focus on health prevention : Provide an overview-and discuss the function-of 1 publicly financed health care program in the United States.
Determine the factor of safety against failure for pillar : Calculate the percentage recovery both with and without pillar recovery - Determine the factor of safety against failure for the pillar.
How organizational structures affect organizational function : How do organizational structures affect organizational functions? How does your organization's structure affect its organizational functions?
Develop a supporting human resource plan : Will the organization need to establish a commissary (for grocery purchases), banking and currency exchange, and limited urgent-care stations?
Determine its optimal capital structure : La Lluvia Co. is trying to determine its optimal capital structure, which now consists of only debt and common equity.
Provide a brief executive summary state of the business : You need to start from the top with R and D and work your way down to finance to make well informed decisions.

Reviews

inf1487129

6/22/2017 5:59:25 AM

I was at first stressed over my performance but because of the splendid help given by the experts of Expertsmind.com things have become all-good and I have been profited gigantically. Thank you guys for boosting my score and me too :)

inf1487129

6/20/2017 6:11:56 AM

Yes, that is correct, the method needs to be a detailed underground mining process which extracts the mineral deposit as listed and involves enconomic analysis for current market prices in AUS$ for the silver/lead/zinc deposit, cheers

inf1487129

5/30/2017 5:44:37 AM

Another powerpoint for ticket #- 9 questions 23272914_1Room and Pillar stope and pillar 1.pptx Yet another powerpoint reference material for the expect, cheers 23272930_1Breast stoping reef mining.pptx And another powerpoint for your expert, cheers. 23272928_1Sub level stoping and variants.pptx To whom it may concern, can I please have a Underground solution to question 9, as the one received is an open cut solution, cheers My apologies, I should have specified that this question was based on a underground mine operation. I would appreciate a solution based on a underground mine operation, please let me know if this requires additional cost, cheers.

inf1487129

5/30/2017 5:44:30 AM

To whom it may concern, please find reference notes/study material, cheers. 23272920_1Underground production systems.pdf More information for ticket #EM20772BRU522ENGG 23272983_1Mining production academy.pdf Some more information for ticket 23272954_1Mining production academy 2.pdf Extra information for ticket #- 9 questions 23272919_1underground mining methods handbook.pdf Final information/reference notes for ticket # - 9 x questions 23272962_1underground mining equipment handbook.pdf Powerpoint information for ticket # - 9 questions 23272932_1Underground Production Systems 2.pptx

Write a Review

Other Engineering Questions & Answers

  Characterization technology for nanomaterials

Calculate the reciprocal lattice of the body-centred cubic and Show that the reciprocal of the face-centred cubic (fcc) structure is itself a bcc structure.

  Calculate the gasoline savings

How much gasoline do vehicles with the following fuel efficiencies consume in one year? Calculate the gasoline savings, in gallons per year, created by the following two options. Show all your work, and draw boxes around your answers.

  Design and modelling of adsorption chromatography

Design and modelling of adsorption chromatography based on isotherm data

  Application of mechatronics engineering

Write an essay on Application of Mechatronics Engineering

  Growth chracteristics of the organism

To examine the relationship between fermenter design and operating conditions, oxygen transfer capability and microbial growth.

  Block diagram, system performance and responses

Questions based on Block Diagram, System Performance and Responses.

  Explain the difference in a technical performance measure

good understanding of Mil-Std-499 and Mil-Std-499A

  Electrode impedances

How did this procedure affect the signal observed from the electrode and the electrode impedances?

  Write a report on environmental companies

Write a report on environmental companies

  Scanning electron microscopy

Prepare a schematic diagram below of the major parts of the SEM

  Design a pumping and piping system

creating the pumping and piping system to supply cool water to the condenser

  A repulsive potential energy should be a positive one

Using the data provided on the webvista site in the file marked vdw.txt, try to develop a mathematical equation for the vdW potential we discussed in class, U(x), that best fits the data

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd