Determine the discharge through the pipeline

Assignment Help Civil Engineering
Reference no: EM13306833

a 2000 m long commercial steel pipe of 200 m diameter converys water at 20 C between two reserviors. the difference in water level between the reserviors is maintained at 50 m. determine the discharge through the pipeline. (neglect the minor losses)

Reference no: EM13306833

Questions Cloud

Write a while or do-while loop : If the user enters a number that is not on the interval, informatively re-prompt until the user enters an appropriate number.
What is the chance of carbon running out on the earth : Deals with the origin of the universe and the Big Bang Theory and what are your thoughts on the origin of the universe and the Big Bang Theory?
Estimate the initial speed of that car assuming a level road : Police investigators, examining the scene of an accident involving two cars, measure 72-m-long skid marks of one of the cars, Estimate the initial speed of that car assuming a level road
What dose equivalent does the patient recieve : A 75 kg patient swallows a 30 micro Ci beta emitter wtih a half life of 5 days. The beta partiles are emitted with an average energy of .35MeV. What dose equivalent does the patient recieve
Determine the discharge through the pipeline : a 2000 m long commercial steel pipe of 200 m diameter converys water at 20 C between two reserviors. the difference in water level between the reserviors is maintained at 50 m.
Find the minimum thickness of the coating required : A Doctor order to prepare a glass for a patient with anti-reflection coating for 400 nm and 700 nm wavelength light. Find the minimum thickness of the coating required for this job
What is the cost of heating energy in dollar per million btu : if gas is available at $0.50 per therm and the efficiency of utilization is 80 percent, what is the cost of heating energy in dollars per million Btu
Analyze a basic set of requirements for a problem : Analyze a basic set of requirements for a problem - compose C language programs and compile a program using Microsoft Visual Studio 2012
Calculate the electrostatic force : In the Bohr theory of the hydrogen atom, an electron,oves in a circular orbit about a proton, where the radius of the orbit is 9.51 A. find the electrostatic force between the two

Reviews

Write a Review

Civil Engineering Questions & Answers

  Mixed liquor volatile suspended solids

For a mixed liquor volatile suspended solids (MLVSS) of 1800 mg/L, what is the total return solids flow rate?

  Determine what is the expected efficiency of the system

A disinfection process for potable water treatment is described by first order kinetics with a rate constant of 0.08 minute. An ideal plug flow reactor is used with a hydraulic residence time of 1 hour. What is the expected efficiency of the syste..

  Determine the specifc energy of water in the channel

A rectangular channel is 25ft wide and has a flow of 500 cfs at a velocity of 5ft/s. (a) Determine the specifc energy of water in the channel. (b) What is the criticl depth of water in the channel (c) What is the critical velocity

  What is the ultimate bod of the completely mixed wastewater

You add 100 mg/L of glucose to pure water, then decide that this was a mistake and decide to remove it biochemically before you serve the water to your friends at a cocktail party. To remove the glucose, you seed the water with a harmless bacteria..

  Determine the force in chains ac and ad during the lift

the 3.5mg engine is suspended from a 500 kg spreader beam and hoisted by a crane which gives it an acceleration of 4m/s^2 when it has a velocity of 2m/s. determine the force in chains AC and AD during the lift.

  Calculate the re-circulating load in the secondary crusher

A two stage crushing operation feeds 0.6 m diameter ore into a primary crusher at a rate of 25mt/hr. 80% of the ore feeds through an 0.2m screen into a secondary crusher. 65% of the ore from the secondary crusher comes out of a 50mm screen.

  What is the elevation difference between the high points

An equal-tangent crest vertical curve has a 50 mi/h design speed. The initial grade is +3%. The high point is at station 33+37.43 and the PVT is at station 37+18.26. What is the elevation difference between the high point and the PVT?

  Determine what will be the profit be after 4 years

A $325,000 bond has an interest rate of 8.4% but if the bond experiences an inflation rate of 8.6% what will be the profit be after 4 years

  Determine how far did the train travel during the time

A train moving at 100 km/hr decreases its speed to 80 km/hr in 3.5 seconds. How far, in meters, did the train travel during this time

  Determine what constricted width would be to force the flow

Given that uniform flow is subcritcal and there is a constriction in a rectangular channel, how do you determine what the constricted width would be to force the flow to be critical. Draw this transition on a specific energy curve.

  Determine the force exerted on the cable by the man

The beam is in equilibrium with the man standing at the end and pulling on the cable. Determine the force exerted on the cable by the man and the reactions at pinned support C.

  Find the rate of change of temperature measured by the probe

a temperature probe moves with the velocity 2i+2j-3k through air. the temperature of air changes as T(x,y,z,t)=(2x^2-3y+z^3)cos(at). Find the rate of change of temperature measured by the probe.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd