(a) A combination gutter section has the dimension W = 0.5 m, SL = 0.008 m/m, Sx = 0.02 m/m, and a = 0.05 m. The Manning roughness factor is 0.016. Determine the discharge in the gutter if the spread is 2.0 m. Estimate the flow intercepted by the curb opening inlet placed in the composite gutter if the inlet length is 1.75m.

(b) Evaluate the spread and depth at the curb for a triangular gutter section carrying a design discharge of 0.09m3/s and having a uniform cross slope of 0.022m/m, Manning's roughness of 0.015, and longitudinal slope of 0.014m/m.

Reference no: EM13339000

Questions Cloud

Capacity of the trunk sewer : The maximum population that can be served from the new development without exceeding the capacity of the trunk sewer. Diameter, slope, and invert elevations of sewer XB.
Demonstrate the use of the pythagorean theorem : Demonstrate the use of the Pythagorean Theorem in the solution of this problem
Find the magnitude of the final angular velocity of spool : a fisherman is dozing when a fish takes the line and pulls it with a tension F the spool of the reel is at rest intialy, find the magnitude of the final angular velocity of the spool
Write a function named shift_right : The function should make sure that left is less than or equal to right, and that distance is greater than zero. If either of these conditions fails, the function should return the value 1 to indicate an error.
Determine the discharge in the gutter : Determine the discharge in the gutter if the spread is 2.0 m. Estimate the flow intercepted by the curb opening inlet placed in the composite gutter if the inlet length is 1.75m.
What is the projected house value in 20 years : Tabatha's parents bought a new house in Florida for $110,000. After 10 years, the value was $145,000. Using x as the number of years and y as the house value, graph the two points.
Design storage and water surface elevation : Determine the peak outflow rate when the inflow hydrograph is routed through this basin and what is the design storage and water surface elevation at the peak outflow rate.
How long does it take to fill the bucket completely : Elaine went to her outside faucet to fill a 0.0189-m3 bucket with water to wash her car. How long does it take to fill the bucket completely
Determine the density of the unknown liquid : A column of oil of height 70.0 cm supports a column of an unknown liquid. Determine the density of the unknown liquid

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determine the angle theta as a function of delta t

At the reference temperature, three identical rods of length L form a pin jointed truss in the shape of an equilateral triangle, ABC. Determine the angle theta as a function of delta T, the temperature increase of the rod AB.

  Explain about pres-stressed concrete

Explain about pres-stressed concrete

  What force-acting on the top edge to hold the gate shut

A 6ft wide, 10ft high vertical rectangular gate has its top edge 6ft below the water level. it is hinged along its lower edge. what force, acting on the top edge, is necessary to hold the gate shut

  Calculate the largest tolerable internal crack length

Calculate the largest tolerable internal crack length for a 7075-T651 aluminum alloy component that is loaded to a stress one-half of its yield strength without catastrophic fracture. For the alloy, the plane strain fracture toughness is 24 and yi..

  Create visual window-based program for multiplying two num

create a visual, window-based program for multiplying two 3x3 matrices together. Create 18 text boxes for input and 9 text boxes or labels for output

  Determine appropriate dimensions of the finished water

Determine appropriate dimensions of the finished water clearwells to achieve adequate disinfection using chlorine. Flow Rate Q = 30 million gallons paer day.

  How many inches should the channel drop in 350feet of length

design a concrete (n = 0.013) channel that will convey 50,000 GPM. It is to be a trapezoidal in cross section with a bottom width of 7.5 feet. The side slopes are to be 1.33:1 (H:V) and it is desired to have the depth of flow constant at 2.0 feet.

  Draw to scale the streakline-path-line of the particle

A dye streak was started at a point in the flow field at time t=0, and the path of the particle in the fluid was also traced from that same point starting at the same time. Draw to scale the streakline, path-line of the particle

  Determine what is the total resistance of the loads

You have 4 resistors (loads) in parallel. What is the total resistance of those loads The loads are as follows 4ohms, 6ohms, 16ohms and 1 ohms. When calculating 1/R, round to the fourth decimal point. Percentage of error margin is 0.5

  How much more flow in cfs will be attained with project

If a 96-inch brick sewer (n = 0.015) is laid on a slope of 0.01% is set to be rehabilitated with GIPL (n = 0.01) that will need 2-inches all around it. How much more flow, in cfs will be attained with this project

  Determine station of pvc and pvt and design speed of curve

An equal-tangent crest vertical curve connects a +3.2% and -1.1% grade. The PVI is at station 98+20. Due to drainage considerations, the highest point of the curve is at station 100+79.35.

  Determine the return periods of occurrence of a hurricane

A city is subjected to occurrence of hurricane and tornado with the average probabilities of 0.3 and 0.2 per year, respectively. Assume occurrence of these events is statistically independent.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd