1) Determine the design hourly volume for the road below, recommend the K factor first.
a. For a two lane highway in a national park with AADT of 10,000 vpd.
b. A four lane highway with a directional factor of 65% and an AADT of 30,000 vpd.
2) Determine the AADT for the axle counts; 28,000 axles have been counted in a year and 10% trucks are measured.
Determine the transformed moment of inertia for the beam using steel as the reference material. Express your answer in in^4 to the nearest 0.1 in^4.
Break Even Stripping Ratio (BESR), Given an underground total mining cost of $8.85 per tonne, surface mining costs of $2.95 per tonne of ore, and surface mining stripping costs of $1.75 per tonne of waste
A rectangular channel 2.0 m wide carrying a discharge of 2.5 m3/s is to be fitted with a weir at its downstream end to provide a means of flow measurement as well as to cause heading-up of the water surface.
Also calculate the deflection of the beam to check that it complies with the design limit of L/200. Only variable actions are required for deflection check.
compose a list here of the geological terms that you encounter in this reading that you could not define and explain in a test situation.
Land is extremely valuable in this area therefore to win this job you need to consider innovative approach to reduce the waste areas
A tank is filled with oil (specific gravity 0.8) and water to a depth of 10 meter and 6 meter respectively. Find the resultant force from all fluids acting on the gate of 1.8 meter by 9 meter.
a quartzite sample in a compression testing mechine is 180mm long and 54mm in diameter. what is the stress under a load of 100kN? if the modulus of elasticity is 102kN/mm2, find the strain develope in the sample.
Sketch a streamline, pathline, and streakline, For a given flow the velocity from time t=0 to t=5s was u=2 m/s, v=0. Then from t=5s to t=10s the velocity was u=+3 m/s, v=-4 m/s. A dye streak was started at t=0
Compute the maximum acceptable service load on an A36 steel plate tension member 1/4in.x12in. having a single line of holes parallel to the direction of loading. The load is 25% dead load and 75% live load, and 7/8in. diameter bolts are used.
Is the system within membrane manufacturer's warranty requirement of maximum flux rate of 14 gfd? What is the annual power cost of the RO system?
Determine the cycle time for a single engine scraper rated at 21 cy heaped that is used to haul material from a pit to a fill 900 ft away under severe conditions.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd