Determine the design flow for the conduit

Assignment Help Civil Engineering
Reference no: EM13299367

An intake conduit from a well field used to pump ground water is being designed for a town with a population of 23,000 people. Six years ago the population was 21,500 people.

a) assuming deometric growth, calculate the population in 50 years

b) the city planners would like to design the conduit such that it will accommodate the city's demands for 50 years. Given an average daily per capita usage of 177 gpcd, determine the design flow for the conduit. (If required, you may assume the maximum daily per capita usage to be twice the average daily per capita usage.)

Reference no: EM13299367

Questions Cloud

Evaluate the molar concentration of hcl in a solution : Calculate the molar concentration of HCl in a solution that has a specific gravity 1.185 and is 36.5% (w/w). Prepare from this bottle 1 L of 0.1 HCl solution. 25 mL of this solution titrated with 30 mL of NaOH.
Estimate the et losses for the area in inches and centimeter : The discharge of the river at the basin outlet is measured at an avarage of 650 cfs. assuming that the charge in storage for the system is essentially zero, estimate the ET losses for the area in inches and centimeters for the year
Define the temperature dependence of the rate constant : We could find out more information about ths reaction by studying the temperature dependence of the rate constant, k. These same experiments could be carried out at a lower temperature (ice bath) and a second rate constant, k2 could be determined ..
Determine the final kinetic energy of the system : A student on a piano stool rotates freely with an angular speed of 3.05rev/s . The student holds a 1.45kg mass in each outstretched arm, 0.779m from the axis of rotation. Calculate the final kinetic energy of the system
Determine the design flow for the conduit : An intake conduit from a well field used to pump ground water is being designed for a town with a population of 23,000 people. Six years ago the population was 21,500 people. a) assuming deometric growth, calculate the population in 50 years
Explain solution boiled to remove co2 and then the excess : Solution boiled to remove CO2 and then the excess HClO4 back titrated with 13mL of dilute NaOH. In a seperate experiment 18.44 mL of HClO4 neutralized NaOH in a 16.0 mL portion. Calculate molarities of HClO4 and NaOH
What is the final angular speed of the merry-go-round : A disk-shaped merry-go-round of radius 2.73m and mass 185kg rotates freely with an angular speed of 0.681rev/s. What is the final angular speed of the merry-go-round
Find summer values for oxygen tranfer-hp and airflow rate : A fine-bubble aeration basin has a flow of 21.5 mgd, an influent BOD of 180 mg/l, 31 mg/l of mmonia, and effluent of 10 mg/l. During the winter, the wastewater temperature of 14.8 degrees C does not nitrify.
Explain a perfect gas has a constant volume molar heat : A perfect gas has a constant volume molar heat capacity of CV,m = 1.5× R, and a constant pressure molar heat capacity of Cp,m = 2.5× R. For the process of heating 4.50 mol of this gas with a 12 W heater for 400 seconds, calculate

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determine the axial and hoop stresses at the lower end

Determine the axial and hoop stresses at the lower end of the vessel. A standpipe 12 ft in diameter and 50 ft tall is being con- structed for use as a storage tank for water with a specific weight of 62.4 lb/ft3. The wall thickness of the vessel is..

  At what temperature change delta t does the wire go slack

a brass wire of diameter d=1/6 in is stretched between rigid supports with an initial tension T of 37lb. assume the coefficient of thermal expansion is 10.6X10^-6 / F and the modulus of elasticity is 15X10^6 psi.

  Determine the amount of oil and money saved per year

The maximum flow rate of a standard shower head is about 3.5 gpm and can be reduced to 2.75 gpm by switching to a low-flow shower head that is equipped with flow controllers. Consider a fam- ily of four, with each person taking a 6-minute shower e..

  Determine the speed of the stone

A 0.20 kg stone attached to a 0.8 m long string is rotated in a horizontal plane. The string makes an angle of 25° with the horizontal. Determine the speed of the stone.

  Determining axial load of a dense sand

A dense sand has an effective friction angle of 43 and c'=0. A dry, 2.8-inch diameter sample is tested in drained triaxial shear with a confining pressure of 2500 psf. What axial load, P (in pounds), will be required to fail the sample?

  Determine what is the final temp and the final mass of air

an insulated tank is evacuated. Air from the atmosphere at 12 psia and 70 degrees farenheight is allowed to flow into the 100 cubic foot tank. What is the final temp and the final mass of air in the tank just after flow ceases.

  Consolidation ratio of the soil at the unloaded condition

An increment of vertical stress of150kpa compress the sample to a void ratio of1.43. What is the over consolidation ratio of the soil at the unloaded condition.

  Required height of the roller coaster

Determine the required height h of the roller coaster so that when it is essentially at rest at the crest of the hill it will reach a speed v= 100km/hr when it comes to the bottom.

  Determine the total velocity when the weapon is open

A smart, anti armour weappon is launched of an aircraft flying at 250 knots (422 FT/s) straight and level at an altitude of 300FT above the ground, the weapon is released from the aircraft with an initial downward velocity of 15FT/s.

  Estimate the volume of soil

A proposed earthen dam will contain 5,000,000 cubic meters of earth. Soil to be taken from a borrow pit will be compacted to a void ratio of 0.78. The void ratio of soil in the borrow pit is 1.12. Estimate the volume of soil (cubic meters) that mu..

  Calculate the peak financial requirement

given the following cost expenditures for small warehouse answer project calculate the peak financial requirement, average overdraft.

  Should bernard bid for the project assignment

Does Bernard have an unfair advantage over firms having designed the project on which he wants to bid?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd