a layer of sand 4 m thick, overlies a layer below permeability clay, 5m thick. the bulk unit weight of the sand is 16.5 KN/m^3 and its saturated unit weight is 18 KN/m^3. the saturated unit weight of the clay is 21 kN/m^3. the water table exist initially at 1m below the ground level but pumping will permanently and rapidly lower the water talbe to 3.0m below the ground level. determine the effective stress at the top, middle and bottom of the clay;

1. before pumping

2. immediately after lowering the water table

3. in the long term.

determine the change in effective stress in the clay caused by the pumping.

Reference no: EM13298275

Questions Cloud

Determine what are the volume and density of the rock : A piece of rock weighs 301 N in air and has an apparent weight of 202 N when suspended under water. What are the volume and density of the rock
Find the minimum uncertainty in the momentum of the object : An object is moving along a straight line and the uncertainty in its position is 1.5 m. Find the minimum uncertainty in the momentum of the object
State what is the final temperature of the water : 200.0 g Al (C = 0.900 ) at 95°C is added to 85.4 g H2O at 25°C. What is the final temperature of the water (and the Al)
What is the company net working capital : The company had cash and marketable securities worth $1,235,455, accounts payables worth $4,159,357, inventory of $7,121,599, accounts receivables of $3,488,121, short term notes payable worth $1,151,663 and other current assets of $121,455. What ..
Determine the change in effective stress in the clay : a layer of sand 4 m thick, overlies a layer below permeability clay, 5m thick. the bulk unit weight of the sand is 16.5 KN/m^3 and its saturated unit weight is 18 KN/m^3. the saturated unit weight of the clay is 21 kN/m^3.
What is the break-even point in bags : United snack company sells 50 pound bags of peanuts to university dormitories for $10 a bag the fixed costs of this operation are 80 000 while the variable cost of peanuts are $.10 per round.
What is the recoil velocity of the pitcher : A baseball pitcher (m = 81 kg) is initially standing at rest on an extremely slippery, icy surface. What is the recoil velocity of the pitcher
State what concentration of the base will produce a ph : A certain weak base has a Kb of 7.40 × 10-7. What concentration of this base will produce a pH of 10.11
Determine total stress and pore water pressure of sand : a layer of clay, 5m thick, overlies a deposite of sand, 5m thick, which is underlaid by rock. the water table in the sand is sub-artesian with a level at 2m below fround level. the saturated unit weights of the clay and sand are 21 and 16 KN/m^3 r..

Reviews

Write a Review

Civil Engineering Questions & Answers

  Estimate the storage change for the lake during the month

A lake with a surface area of 1050 acres was monitored over a period of time. During a one month period, the inflow was 33 cfs, the outflow was 27 cfs, and a 1.5 in seepage loss was measured.

  Determine the stresses in the steel and concrete

determine the stresses in the steel and concrete under the service loads

  How to find degree of kinematic indeterminacy

how to find degree of kinematic indeterminacy

  Determine the force to overcome static friction with table

A 15kg Block rests on top of a 25kg Block which is subject to a 400N force. Block B sits on a table. the Coeffiecents of friction are the same for all surfaces, u(s) is .4 and U(k) is .3. The force is Applied to the bottom block ( with no inclinat..

  Find the minimum flow rate of air

Find the minimum flow rate of air and the heat exchanger second-law efficiency.

  Which project will company choose on present value criteria

A company facing an interest rate of 8% must choose among projects offering the following four-year cash flows. If the company is employing the net present value criterion, which project should they choose

  Determine the velocity and acceleration of point c of belt

determine the velocity and acceleration of point C of the belt, (a) immediately before the power is turned off. (b) 9 s later.

  Dissolved inorganic carbon sample

The total dissolved inorganic carbon (TIC) of a sample of groundwater is 8.33 mM. The temperature of the aquifer is 15C, the pH is 7.5, and the ionic strength is 0.05 M. What is the H2CO3, HCO3-, CO3 2-, and the partial pressure of CO2? [Use activ..

  Determine the horizontal deflection of joint

The maximum vertical load and horizontal load have been identified and shown in the figure. Under this loading condition, you are asked to determine the horizontal deflection of joint C.

  Calculate the rainfall amount from a unit hydrograph

If direct runoff hydrgraph derived from a unit hydrograph of a catchment (drainage area = 50 acre) is 120 acre-ft, back calculate the rainfall amount. Assume total abstraction in the area is 50%.

  What is the minimum distance from the stalled car

What is the minimum distance from the stalled car at which the driver could apply the brakes and still stop before hitting it? Assume coefficient of rolling resistance of 0.013.

  Wall shear stress and friction velocity

A rectangular channel 5 m wide carries a discharge of 10 m^3/s at a uniform depth of 3 m. The channel is running on a slope of 0.0025 m/m. Estimate wall shear stress and friction velocity. Assume the density of flowing water as 1000 kg/m^3.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd