You are planning a Polaris observation at latitude 42 degrees North when the star is at or near upper culmination. You want to know the error in azimuth that will result from a 1 min timing error. You know that the meridian angle, t, is exactly 0 degrees at upper culmination.

Use the approximations that the celestial sphere rotates once in approximately 24 hours, the declination of Polaris is approximately 89 degrees 10 minutes, and the bearing of Polaris is approximated by the folwing equation: Z = (sint)(p)(coslatitude). The azimuth error resulting from a 1 min timing error is most nearly?

Reference no: EM13314935

Questions Cloud

What is the cause of this phenomenon : A gymnast performing a routine on the high bar feels weightless at the highest point of their rotation. Why does the gymnast feel weightless at the highest point of their rotation around the bar? What is the cause of this phenomenon
Draw envelope shear and moment diagrams taking into accounts : For an intermediate beam in 3 bays by 3 bays (each bay is 20' by 20') floor plan, draw the envelope shear and moment diagrams taking into account effect of pattern loading.
Create class diagrams to represent online ordering system : create class diagrams to represent online ordering system. Use Case diagrams to represent what the online ordering process would look like
Determine the pressure drop in the constriction : When a person inhales, air moves down the bronchus (windpipe) at 14 cm/s. determine the pressure drop in the constriction
Determine the bearing of polaris is approximated by z : You are planning a Polaris observation at latitude 42 degrees North when the star is at or near upper culmination. You want to know the error in azimuth that will result from a 1 min timing error.
Determine the speed at which the water leaves the hole : A large storage tank, open to the atmosphere at the top and filled with water, Determine the speed at which the water leaves the hole
In the process safety standard : In the Process Safety Standard, OSHA placed new requirements on the prime/subcontractor relationship. Describe at least three elements of these new rules. Why did OSHA make these changes? Include discussion of some of the incidents that helped set th..
What is the density of the material : A sample of an unknown material appears to weigh 280 N in air and 180 N when immersed in alcohol of specific gravity 0.700. What is the density of the material
What force is required to hold it completely : A ball has a diameter of 3.90 cm and average density of 0.0845 g/cm3. What force is required to hold it completely submerged under water

Reviews

Write a Review

Civil Engineering Questions & Answers

  At what temperature does the liquid solidify

What is the composition of this last remaining liquid phase?

  What is meant by the base value in an arithmetic gradient

1. What is meant by the "base value" in an arithmetic gradient 2. Which two alternative comparison techniques requier equal service lives Why

  Find how many trucks are needed to service the backhoe

A haul fleet of trucks having a heaped capacity of 15 cy. is to be loaded by a hydraulic backhoe excavator (CT=.48 min.) with a 3 1/2 cy. heaped capacity. Assume the material is a wet loam that weighs 3380 lb/cy in the bank state

  Sketch and label vi-vo and vn versus time

An inverting amplifier is implemented with a R1=10 kilo Ohms and R2= 100 Kilo Ohms, and an op amp with finite open-loop gain a=10^3 V/V. Sketch and Label Vi,Vo,and Vn versus time if Vi is a 1-kHz triangular wave

  What is the new water content

A soil sample with a water content of 14.5% and unit weight of 128.2 lb/cu. ft. was dried to a unit weight of 118.8 lb/cu. ft. without changing its void ratio. What is its new water content (in %)?

  Calculate the re-circulating load in the secondary crusher

A two stage crushing operation feeds 0.6 m diameter ore into a primary crusher at a rate of 25mt/hr. 80% of the ore feeds through an 0.2m screen into a secondary crusher. 65% of the ore from the secondary crusher comes out of a 50mm screen.

  What is the maximum positive coordinate reached by particle

The position of a particle moving along an x axis is given by x = 17t2 - 5.0t3, where x is in meters and t is in seconds. (a) Determine the position, velocity, and acceleration of the particle at t = 3.0 s. x = m v = m/s a = m/s2

  Determine a complete set of dimensionless parameters

Water flows over a dam. Assume the volume flowrate per unit length q along the dam is a function of the head h , width b, acceleration of gravity g, f luid density and the fluid viscosity. Determine a complete set of dimensionless parameters

  Calculate the overall copper recovery for the process

A froth flotation process is used to concentrate copper ore. It is a two stage process with a rougher stage followed by a cleaner stage. The cleaner tailings are returned to the rougher flotation.

  Find the average time in system

If the time required to pay for parking is exponentially distributed with a mean of 15 seconds, find the average time in system.

  Determine the minimum possible area of the metal plate

A circular hole of diameter 11.42 + and - 0.03 inches is cut out of the plate. Also, using the tolerances given, determine the minimum possible area of the top surface of the metal plate.

  Determine the tension t and the reaction at b and d

Two transmission belts pass over sheaves welded to an axle supported by a thrust bearing at B and a journal bearing at D. The sheaves A has a radius of 50mm, and the sheave at C has a radius of 40mm.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd