Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
You are planning a Polaris observation at latitude 42 degrees North when the star is at or near upper culmination. You want to know the error in azimuth that will result from a 1 min timing error. You know that the meridian angle, t, is exactly 0 degrees at upper culmination.
Use the approximations that the celestial sphere rotates once in approximately 24 hours, the declination of Polaris is approximately 89 degrees 10 minutes, and the bearing of Polaris is approximated by the folwing equation: Z = (sint)(p)(coslatitude). The azimuth error resulting from a 1 min timing error is most nearly?
What is the composition of this last remaining liquid phase?
1. What is meant by the "base value" in an arithmetic gradient 2. Which two alternative comparison techniques requier equal service lives Why
A haul fleet of trucks having a heaped capacity of 15 cy. is to be loaded by a hydraulic backhoe excavator (CT=.48 min.) with a 3 1/2 cy. heaped capacity. Assume the material is a wet loam that weighs 3380 lb/cy in the bank state
An inverting amplifier is implemented with a R1=10 kilo Ohms and R2= 100 Kilo Ohms, and an op amp with finite open-loop gain a=10^3 V/V. Sketch and Label Vi,Vo,and Vn versus time if Vi is a 1-kHz triangular wave
A soil sample with a water content of 14.5% and unit weight of 128.2 lb/cu. ft. was dried to a unit weight of 118.8 lb/cu. ft. without changing its void ratio. What is its new water content (in %)?
A two stage crushing operation feeds 0.6 m diameter ore into a primary crusher at a rate of 25mt/hr. 80% of the ore feeds through an 0.2m screen into a secondary crusher. 65% of the ore from the secondary crusher comes out of a 50mm screen.
The position of a particle moving along an x axis is given by x = 17t2 - 5.0t3, where x is in meters and t is in seconds. (a) Determine the position, velocity, and acceleration of the particle at t = 3.0 s. x = m v = m/s a = m/s2
Water flows over a dam. Assume the volume flowrate per unit length q along the dam is a function of the head h , width b, acceleration of gravity g, f luid density and the fluid viscosity. Determine a complete set of dimensionless parameters
A froth flotation process is used to concentrate copper ore. It is a two stage process with a rougher stage followed by a cleaner stage. The cleaner tailings are returned to the rougher flotation.
If the time required to pay for parking is exponentially distributed with a mean of 15 seconds, find the average time in system.
A circular hole of diameter 11.42 + and - 0.03 inches is cut out of the plate. Also, using the tolerances given, determine the minimum possible area of the top surface of the metal plate.
Two transmission belts pass over sheaves welded to an axle supported by a thrust bearing at B and a journal bearing at D. The sheaves A has a radius of 50mm, and the sheave at C has a radius of 40mm.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd