Determine the annual production capacity of the plant

Assignment Help Business Management
Reference no: EM13859701

1. The ABC Company is planning a new product line and a new plant to produce the parts for the line. The product line will include 8 different models. Annual production of each model is expected to be 900 units. Each product will be assembled of 180 components. All processing of parts will be accomplished in the new plant. On average, 6 processing operations are required to produce each component, and each operation takes an average of 1.0 min (including an allowance for setup time and part handling). All processing operations are performed at workstations, each of which includes a production machine and a human worker. The plant operates one shift. Determine the number of (a) components, (b) processing operations, and (c) workers that will be needed to accomplish the processing operations if each worker works 2000 hr/yr.

2. One million units of a certain product are to be manufactured annually on dedicated production machines that run 24 hours per day, five days per week, 50 weeks per year. (a) If the cycle time of a machine to produce one part is 1.0 minute, how many of the dedicated machines will be required to keep up with demand? Assume that availability, utilization, worker efficiency = 100%, and that no setup time will be lost. (b) Solve part (a) except that availability = 0.90.

3. A mass-production plant has six machines and currently operates one 8-hour shift per day, 5 days per week, 50 weeks per year. The six machines produce the same part each at a rate of 12 parts per hour. (a) Determine the annual production capacity of this plant. (b) If the plant were to operate three 8-hour shifts per day, 7 days per week, 52 weeks per year, determine the annual percentage increase in plant capacity?

4. A job shop has four machines and operates 40 hours per week. During the most recent week, machine 1 processed part A for 25 hours at a production rate of 10 parts per hour, and part B for 12 hours at a rate of 7 parts per hour. Machine 2 processed part C for 37 hours at a rate of 14 parts per hour, and was idle 3 hours. Machine 3 processed part D for 15 hours at a rate of 20 parts per hour, and part E for 25 hours at a rate of 15 parts per hour. Machine 4 processed part F for 13 hours at a rate of 9 parts per hour, part G for 12 hours at a rate of 18 parts per hour, and was idle the rest of the week. Determine (a) weekly production output of the shop and (b) average utilization of equipment.

5. The table below presents production data for three batches of parts processed through a batch production plant. Production rates (Rp) are given in parts per hour. Utilization fractions (f) are the fractions of time during the 40-hour week that the machine is devoted to the production of these parts. The parts do not proceed through the machines in the same order. Determine (a) weekly production rate, (b) workload, and (c) average utilization of this set of equipment. A spreadsheet calculator is recommended for this problem.

 

Machine 1

Machine 2

Machine 3

Machine 4

Part

Rp1

f1

Rp2

f2

Rp3

f3

Rp4

f4

A

15

0.3

22.5

0.2

30

0.15

7.5

0.6

B

10

0.5

12.5

0.4

8

0.625

 

 

C

30

0.2

15

0.4

 

 

20

0.3

6. A batch production plant processes an average of 35 batches of parts per week. Five of those part styles have been selected as a sample for analysis to assess the production performance of the plant. The five parts are considered to be representative of the population of parts processed by the plant. Any machine in the plant can be set up for any type of batch processed in the plant. Batch quantities, numbers of operations in the processing sequence, setup times, and cycle times for the parts are listed in the table below. The average nonoperation time per batch per operation is 11.5 hours. The plant operates 40 hours per week. Use this sample to determine the following measures of plant performance: (a) manufacturing lead time for an average part, (b) plant capacity if all machines could be operated at 100% utilization, and (c) work-in-process (number of parts- in-process). Use of a spreadsheet calculator is recommended for this problem.

Part j

Qi

noj

Tsuij (hr)

Tcij / (min)

Tno (hr)

A

100

6

5.0

9.3

11.5

B

240

3

3.8

8.4

11.5

C

85

4

4.0

12.0

11.5

D

250

8

6.1

5.7

11.5

E

140

7

3.5

3.2

11.5

7. In the operation of a certain production machine, one worker is required at a direct labor rate = $10/hr. Applicable labor factory overhead rate = 50%. Capital investment in the system = $250,000, expected service life = 10 years, no salvage value at the end of that period, and the applicable machine factory overhead rate = 30%. The work cell will operate 2000 hr/yr. Use a rate of return of 25% to determine the appropriate hourly rate for this work cell.

8. The break-even point is to be determined for two production methods, one a manual method and the other automated. The manual method requires two workers at $9.00/hr each. Together, they produce at a rate of 36 units/hr. The automated method has an initial cost of $125,000, a 4-year service life, no salvage value, and annual maintenance costs = $3000. No labor (except for maintenance) is required to operate the machine, but the power required to run the machine is 50 kW (when running). Cost of electric power is $0.05/kWh. If the production rate for the automated machine is 100 units/hr, determine the break-even point for the two methods, using a rate of return = 25%.

9. A customer has requested a quotation for a machining job consisting of 80 parts. The starting work part is a casting that will cost $17.00 per casting. The average production time of the job is 13.80 min on an automatic machine whose equipment cost rate is $66.00 per hour. This rate does not include any overhead costs. Tooling cost is $0.35 per part. The factory overhead rate is 128% and the corporate overhead rate is 230%. These rates are applied only to time and toooling costs, not starting material costs. The company uses a 15% markup on total cost for its price quotes. What is the quoted price for this job?

10. A part is processed through six operations in a batch production plant. Cost of the starting material for each unit is $5.85. Batch quantity = 40 parts. The table below presents time and cost data for the six operations: Tsu= setup time, Th= part handling time, To= operation processing time, Tt = tool handling time where applicable, Tno= nonoperation time, Co = operating cost of the work center, and Ct = tool costs where applicable. Determine the total production cost for this part. A spreadsheet calculator is recommended for this problem.

Operation

Tsu

(hr)

Th

(min/Pc)

To

(min/Pc)

Ts
(min/Pc)

Tno

(hr)

Co

($/hr)

Cs

($/pc)

1

2.5

0.25

1.25

0

10

32.88

0

2

1.3

0.22

2.50

0.25

10

65.50

0.22

3

4.1

0.30

1.75

0

10

48.25

0

4

1.7

0.25

0.85

0.10

10

72.15

0.16

5

1.4

0.18

1.67

0

10

45.50

0

6

0.8

0.33

0.95

0.15

10

29.75

0.18

Reference no: EM13859701

Questions Cloud

Write a response on overall morale of an organization : Toxic leaders have an adverse effect on the overall morale of an organization - Respond with 150 words
Examine the impact of import or export compliance : Examine the impact of import or export compliance and security management post 9/11
Concept of toxic leadership : Organizations such as these are more concerned with the bottom line and subscribe to the "end justifies the means" philosophy of conduct.
Starting from equilibrium national income : Starting from equilibrium national income of $250 billion, suppose government purchases decreased by $25 billion. Describe the effects on the AE curve and on equilibrium national income.
Determine the annual production capacity of the plant : Determine the annual production capacity of this plant. (b) If the plant were to operate three 8-hour shifts per day, 7 days per week, 52 weeks per year, determine the annual percentage increase in plant capacity?
What is the current state of ikea operations in china : How does Ikea modify its marketing strategies to compete effectively within the Chinese market? What is the current state of Ikea's operations in China
Transactions on all taxpayers : The committee would like for you to summarize your conclusions regarding the potential effects-both good and bad-of these potential changes. In formulating your answer, please discuss all of the possible tax and economic implications that you see ari..
Database designer to ensure the integrity of keys. : When constructing a database, two rules are followed by the database designer to ensure the integrity of keys. Describe each rule and discuss common violations.
Contains sales data from a small bakery : 5. (TCO 9) You have been provided with an Access database that contains sales data from a small bakery. The data has information about the client, bread type, cost to produce the bread and sales. You have been asked to complete analysis in Excel and ..

Reviews

Write a Review

Business Management Questions & Answers

  Explain how does mobility differ in organizations

Explain how does mobility differ in organizations with innovative career paths and show three innovative career paths and describe how mobility occurs in each.

  Matrix form of organizational design

Matrix form of organizational design - What are some of the advantages and other disadvantages of this type of design?

  Taking the communication plan seriously

Taking the Communication Plan Seriously at the Big Old Company

  Mrp structureconsider the bill of material for product j

mrp structureconsider the bill of material for product j and the data given in the following table. the gross

  Compute a 3-month moving average forecast of demand

The Harley Davis motorcycle dealer in the Minneapolis St. Paul area wishes to be able to predict accurately demand for Roadhog Super motorcycle during the next month.

  Key competency requirement of a material engineer

What are the essential criteria for selecting materials required for Turbine blades Such endures vibration' and wine conditions and Domestic utensils used in kitchen.

  Operations management - productivity ratios

Calculate the productivity ratios AND the percentage change in productivity for each from 2010 to 2011.

  Explain why do applicants flock to work at quirky industry

The industry's motto is to "hire for attitude, train for skills." Do you think most industries could adopt this motto? Explain why or explain why not? Make sure to comprise a suitable introduction also summary for your paper.

  Explain what role do ceremonie play in socialization process

Organization Behavior - Explain What role do ceremonies play in the socialization process of someone crossing an important organizational boundary?

  Analyzing operations facilitiesgiven the following

analyzing operations facilitiesgiven the following companies boeing airliner manufacturer and dell computer computer

  The subsequent information about the activities is given

Contained in the proposal is a list of activities which must be accomplished to complete the new office system project. The subsequent information about the activities is given.

  Professional values and ethics

Write down a response in which you explain the relationship among professional values, ethics, and career success. Address the following items in your explanation:

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd