Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Two activated sludge aeration tanks in Podunk, MO are operated in series. Each tank has the follwing dimensions: 7.0 m wide x 28.0 m long x 3.5 m effective liquid depth. The plant operating parameters are:
Flow = 0.0945 m^3/s MLVSS = 1650 mg/L
BOD5 after pimary settling = 135 mg/L MLSS = 1.35 (MLVSS)
Determine the aeration period and F/M ratio for these operating conditions.
A large drainage channel has a trapezoidal cross section with a bottom width of 75 feet and bank side slopes of 4:1 (H:V). If the normal depth of flow is 25 feet, compute the normal flow rate through the channel (Q in cfs).
Evaluate the pressure head at point a and determine the vertical effective stress at point b and evaluate the lateral pressurein the brown clay
The air density is 0.00206 slugs/cuft. The car has frontal area of 19.8 sqft, a drag coefficient of 0.28, a wheel radius of 12.6 inches, a drive axle slippage of 3%, and a drivetrain efficiency of 88%.
A cantilever beam of length 50 ft is embedded in a wall at A and has a free end B. A concentrated load of 100 kips upward is located at x = 25 ft from A. A uniformly distributed load of 20 kips/ft downward extends from 25 to 50 ft.
You have a $1,500 monthly loan payment. If inflation is 3.5% annually (compounded monthly). What is the constant dollar amount of this payment in your 80th month
A 2000 ft vertical curve connects to a +3% grade to a -5% grade. If the vertical tangents intersect at station 52+60.55 and elevation 877.62 ft, calculate the elavations at the VPC, VPT, high point and station 54+00.
The tank contains water to depth of 2m and oil (SG=0.8) on top of the water to a depth of 1m. Determine the magnitude and location of the resultant force acting on one end of the tank (i.e. 3m high by 3m wide).
An existing high-way railway at-grade crossing is being redesigned as a grade seperated to improve traffic operations. the railway must remain at the same elevation. the highway is being reconstructed to travel under the railway.
A structural component in the form of a very wide plate is to be fabricated from 4340 steel that was cooled using a fast cooling rate and has a yield strength of 1515 MPa and a fracture toughness (KIC) of 60.4MPam.
The ball is kicked so that it has a velocity of 0.5 m/s and the cord is pulled in at a rate of 0.2 m/s. Neglect friction so that the only important force on the ball is the tension in the cord. Find the tension in the cord when the radius is 0.25 ..
The letter size is such that the sign can be ready by a person with 20/20 vision from a distance of 200 ft. Does the subject driver have enough time to read the sign at a speed of 30 mi/h
The state highway department is considering six routes for a new highway. Listed below are the estimated construction costs, maintenance costs, and the user cost associated with each route.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd