Determine selling price that yields effective annual return

Assignment Help Civil Engineering
Reference no: EM13296897

Five $1,000 bonds having a bond rate of 8% per year payable quarterly are pur chased for $4,940 and kept for 6 years, at which time they are sold. Determine the selling price that yields a 6% effective annual return on the investment.

Reference no: EM13296897

Questions Cloud

What is the tce concentration in ppm if the tank is filled : What is the TCE concentration in ppm if the tank is held at (a) 4 degrees C and (b) 35 degrees C (c) What is the TCE concentration in ppm if the tank is filled with hexane instead of water Consider the temperature dependence of the density of wat..
Review the genetics of self-pollinated species : Review the genetics of self-pollinated species and understand the breeding methods commonly used for self-pollinated crops.
What is their primary eps : They also have 600 bonds with a face value of 1,000 and a coupon rate of 6%. These bonds can be converted into15,000 shares of stock. Their marginal tax rate is 40%. What is their Primary EPS?
What is the value of each warrant : However, with the warrants attached the bonds will pay a 6% annual coupon and can still be issued at the par value of $1,000. There are 30 warrants attached to each bond. What is the value of each warrant?
Determine selling price that yields effective annual return : Five $1,000 bonds having a bond rate of 8% per year payable quarterly are pur chased for $4,940 and kept for 6 years, at which time they are sold. Determine the selling price that yields a 6% effective annual return on the investment.
Explain why the present value of a cash flow stream : Explain why the present value of a cash flow stream, and the asset associated therewith; fluctuate in value with the level of interest rates in the capital markets.
What uniform annual series of cash flows over 12-year period : What uniform annual series of cash flows over a 12-year period is equivalent to an investment of $5,000 at t= 0, followed by receipts of $600 per year for 11 years and a final receipt of $1,600 at t= 12 of the investor's time value of money is 6% ..
Draw and submit a time line : Draw and submit a time line, including EBIT, taxes, depreciation, operating cash flow, tvm factors, and discounted cash flow.
Show that the ratio of mean shear to the wall shear rate : for a laminar flow of a newtonian fluid in a tube of a circular cross section, show that the ratio of mean shear to the wall shear rate is 2/3

Reviews

Write a Review

Civil Engineering Questions & Answers

  Cause of heading-up of the water surface

A rectangular channel 2.0 m wide carrying a discharge of 2.5 m3/s is to be fitted with a weir at its downstream end to provide a means of flow measurement as well as to cause heading-up of the water surface.

  What will be the new level of service

If an additional 11ft lane is added (each direction) and all other factors stay the same, what will be the new level of service?

  Draw a small sketch that shows a situation

Name three types of metamorphic foliations, and draw a small sketch that shows a situation where a metamorphic foliation could cause problems in an excavation.

  How many short tons of coal are required

How many short tons of coal are required by this plant per year, assuming it operates continuously? If 10% of the coal mass remains as residual ash, how many tons will develop in the ash pile over 25 years?

  Shafts in a speed-reducer unit

The two shafts in a speed-reducer unit are subjected to couples of magnitude M1 = 18 N · m and M2 = 7.5 N · m, respectively.

  How much force must be applied to keep the gate \

A gate (shaped like .25 of a cylinder with radius R=3m) is used to control the flow of water through a canal.The height of the water in the tank is 30m. How much force must be applied to keep the gate from opening? The gate is 30m wide.

  What was involved in the first far-reaching

what was involved in the first far-reaching, comprehensive study of Earth's oceans?

  Expected boiling-point elevation

What is the expected boiling-point elevation of water for a solution that contains 271 g of sodium chloride dissolved in 1.0 kg of water?

  Rectangular duct carries air

A 30mm pipe X 460 mm rectangular duct carries air. What size square conduit is needed to transport 4m cube per sec of water at a distance of 45m and head loss of of 1.08m.

  How sustainability and green engineering can be integrated

Discussion on how sustainability and green engineering can be integrated in the four components of materials science and engineering?

  Smallest standard commercial pipe

For satisfactory operation, the static pressure at the pump inlet must not be lower than -6 m of water gage. Determine the smallest standard commercial pipe that will give the required performance.

  Concrete dam retaining water

A concrete dam retaining water has a specific weight of concrete of 23.5kn/m3, what is the factor of safety against sliding & overturning and pressure intensity on the base if coefficient of friction is 0.45

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd