Determine minimum surge tank size for max allowable height

Assignment Help Civil Engineering
Reference no: EM13299507

A hydroelectricity plant is supplied from a resevoir via a pipeline 2km long and 2.5m in diameter. The pipeline terminates at the downstream end at in a control valve.

Under normal operating conditions the hydro plant runs with a steady discharge of 30 cumecs and the water level in the surge tank is 19m below the level in the supply reservoir.

Determine the minimum surge tank size if the max allowable height in the surge tank above the reservoir is 7.5m showing working?

Reference no: EM13299507

Questions Cloud

How the bank would go about assessing risk : Discuss in a two-page document the details of how the bank would go about assessing risk and the probability of default prior to extending credit to the company.
Explain a reddish-brown bromine solution : When a reddish-brown bromine solution (the solvent is often carbon tetrachloride) is added to the alkene shown below, the brown color of the bromine solution disappears
Determine the velocity and the acceleration of the particle : the path of particle p ios the elipse difined by relations r=2/(2-cosPIEt) and theta=PIEt, where r is exspressed in meters , tis in seconds nd thet is in radians. Determine the velocity and the acceleration of the particle whern t=0 seconds
Explain what is q heat change per gram of sucrose oxidized : Sucrose (C12H22O11, table sugar) is oxidized in the body by O2 via a complex set of reactions that ultimately produces CO2(g) and H2O(g) and releases 5.64 x 103 kJ/mol sucrose. What is q (heat change) per gram of sucrose oxidized
Determine minimum surge tank size for max allowable height : A hydroelectricity plant is supplied from a resevoir via a pipeline 2km long and 2.5m in diameter. The pipeline terminates at the downstream end at in a control valve. Determine the minimum surge tank size if the max allowable height
Calculate keenan total dividends for 2011 : Which of the proceeding policies would you recommend? Restrict your choices to the ones listed, but justify your answers.
Explain make a 3 liter solution of 500 mm formic acid buffer : If you wanted to make a 3 liter solution of 500 mM formic acid buffer at ph 3.9 how many grams each of sodium formate (MW=68g/mol) and formic acid (MW=46g/mol) would you add... 98.6 g sodium formate and 2.3g of formic acid or 20.2 sodium formate
Locate the center of gravity of the person : A massless, rigid board is placed across two bathroom scales that are separated by a distance of 2.06 m. Locate the center of gravity of the person relative to the scale beneath his head
Compare total reactor volume require to remove the substance : Compare the total reactor volume required for 90% removal of a substance that decays according to first-order kinetics with a rate constant of 0.05 day -1 in a CM system that contains a single reactor against a system that contains three CM reacto..

Reviews

Write a Review

Civil Engineering Questions & Answers

  Highway construction project

A soil sample was taken from a proposed cut area in a highway construction project and sent to a soils laboratory for a compaction test, using the Standard Proctor compaction procedure. Results of the test are as follows:

  Explain what criteria are used in the selection of personnel

What criteria are used in the selection of personnel for the demonstration of maintenance tasks? Define the criteria for the selection of test and support equipment.

  Determine the position of the race car

Starting from x = 0 with no initial velocity, the acceleration of a race car is defined by the relation a = 6.8e-0.00057x, where a and x are expressed in m/s2 and meters, respectively. Determine the position of the race car when v = 30 m/s.

  Determine the water depth at 30 m upstream of the brink

The channel entrance is rounded and smooth (negligible head loss at entrance), and the reservoir water surface is 2.5 m above the bed of the channel at the entrance. hf=0.00019*Q2, where Q (in m3/s) is the discharge in the channel.

  Calculate the specific weight of the material

Your engineering consulting firm has been asked to determine the specific weight of an unknown material. You decide to use the concept of buoyancy to figure this out. So you weigh the material in both air and water.

  Compute difference in the weights of dry gravel in a 10 ton

A stockpile of gravel that has a water content of 6% is rained on so that its water content increases to 9%. Compute the difference in the weights of dry gravel in a 10 ton truckload taken from the pile before and after the rain.

  What is the astronomic azimuth of the line

The magnetic north azimuth of a line is 128 degrees 27' while the magnetic declination is 3 degrees 30'E. What is the astronomic azimuth of the line (in decimal degrees)?

  Determine the values of k and c

The landing gear of an airplane can be idealized as the spring-mass damper system. If the runway surface is described y(t)=y0 cos wt, determine the values of k and c that limit the amplitude of vibration of the airplane (x) to 0.1m. Assume m=2000k..

  Commencement of fill placement

Determine the horizontal spacing of the vertical drains if the drains are installed in triangular grid to reach 90% of primary consolidation in 1.5 years after the commencement of fill placement.

  How many light bulbs could be lit with the wasted power

The flow depth and velocity before the jumo are 0.8 m and 7 m/s respectively. The flow depth and velocity after the jump are 2.46 m and 2.28 m/s respectivly. Assuming a flat channel, determine a) the energy loss due to the jump, hl (head loss)

  How much was invested in each account

Suppose a person invests a total of $10,000 in two accounts. One account earns 8% annually, and the other earns 9% annually. If the total interests earned from both accounts in a year is $860, how much was invested in each account?

  What is the concentration of tracer in the reactor

What is the concentration of tracer in the reactor 1 h after tracer addition is terminated? The reactor had an initial concentration of tracer of 1.0 mg/L when tracer addition commenced.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd