An ideal reheat Rankine cycle with water as the working fluid operates the inlet of the high pressure turbine at 800Kpa and 450°C. The inlet of loe pressure turbine is 500Kpa and 500°C. Condenser operates at 10 Kpa. Determine the mass flowrate through boiler needed to produce 5000KW of power.
Draw the Bending Moment and Shear Force diagrams for the girder and calculate the maximum tension in the cable.
Write the unit of measurement and unit of payment of following items. 1) Earthwork in excavation in foundation. 2) Framwork. 3) Steelwork in trusses. 4) Damp proof course D.P.C. 5) Cement.
Jack Flubber, who owns sons of Flubber Construction Co. and runs it as a proprietorships had gross profit last year of $ 80000. His personal and family expenses are $ 52000 and he has $ 7000 in exemptions and deductions.
Sketch a streamline, pathline, and streakline, For a given flow the velocity from time t=0 to t=5s was u=2 m/s, v=0. Then from t=5s to t=10s the velocity was u=+3 m/s, v=-4 m/s. A dye streak was started at t=0
A runs slope a distance of 156.777 m from one point to another point at a rate of +1.5%. What is the corresponding horizontal distance between the points?
If friction between the cars and the rails is neglected, what were the magnitude and the direction of the velecity of the cars after the collision?
When P = 800 lb, A) Draw the shear and bending moment diagram along its length; B) Determine the maximum tensile and compressive bending stresses; and C) determine the maximum shear stress.
How do you calculate the force of water hitting a concrete cylindrical pole. The velocity of the water is 2 ft/s, the depth of the water is 10 ft, and diameter of the pole is 3 ft. So what would be the total force exerted on the pole by the water?
a delivery company accepts only rectangular boxes the sum of whose length and girth (perimeter of a cross section) are equal to 108cm. find the dimensions of an acceptable box of a largest area.
How to calculate the principle of shoring system in formwork analysis when the secondly floor upper has been poured?
Conduct either a qualitative or quantitative risk assessment on this project. Identify the risk factors that you consider most important for the suspension bridge construction. How would you assess the riskiness of the project? Why?
If the BOD5 of the river below the mill outfall must not exceed 5 mg/L, what percent removal of organic matter (BOD5) is required by the mill to meet this requirement?
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd