In an attempt to estimate the speed of a vehicle just before it hit a traffic signal pole, a traffic engineer measured the length of the skid marks made by the vehicle and performed trial runs at the site to obtain estimate if the coefficient of friction, Determine the estimated unknown speed if the following data were obtained:Skid Marks Length: 585, 590, 580, 595 (in feet)Speed of trial run: 30 mphDistance travelled during trial run: 300 ftExamination of the vehicle just after the crash indicated that the speed of impact was 35 mph.
A trapezoidal canal 6m wide at the bottom and having a side slope of 1V:2H carries water with a mean velocity of 1.0m/s to a depth of 60cm. What length of contracted rectangular weir 1.0m high should be placed at the middle of the canal to make th..
What is the concentration of tracer in the reactor 1 h after tracer addition is terminated? The reactor had an initial concentration of tracer of 1.0 mg/L when tracer addition commenced.
A pipe is to be installed under the ground on a bed of aggregate 6 in. thick. The entire weight on the aggregate from pipe and soil above the pipe is 1800 lbs. per linear foot of pipe. What is the pressure on the soil if theta is 45 degrees? Assum..
Compute the maximum service (unfactored) concentrated live load that can be applied at 1ft from the free end of the cantilever. Use load and strength -reduction factors from ACI Code Sections 9.2 and 9.3. Also check As,min.
The dye appears 14 days later in an observation well 75 ft away from the injection point. Compute the seepage velocity and estimate the hydraulic gradient in the aquifer if the porosity of the soil is 42%.
The calculation and layout of horizontal and vertical curves should be done only by experienced surveyors and differential leveling measurements
Determine the slenderness ratio of a 5 m column with built in ends if its cross- section is (a) circular with a radius of 40mm and (b) 50 mm square. Use the concept of effective length.
The meter inlet and throat are connected by the two legs of a mercury manometer. Use the Bernoulli equation to describe how this manometer can be used to measure the flow rate through the meter.
Write an essay on the topic "application of geophysical techniques using electromagnetic induction as a tool for sustainable soil and water management of agricultural fields in the humid tropic Caribbean. components:
A 2014 Ford Mustand convertible in 'Gotta have it Green Metallic' is retailing for $38,000. If you put $3,500 down on the vehicle, and obtain approval for a 2.19% car loan compounded monthly for 5 years.
Design the ramp for the highest design speed (to the nearest 5 mph) without exceeding a minimum D of 8.0. (Assume the PC of the horizontal curve is at station 15+00, and the vertical curve PVIs are at the PC and PT of the horizontal curve). Maximu..
Beginning whith the 1-D, steady state, general mass(volume) balance equation Qin-Qout=0 derive the 1-D poisson equation.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd