Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
The lubbock board of city development has decided to ask the city council to construct a tunnel under the snowcapped mountain range east to downtown lubbock so that out of town visitors can reach historic prairie dog town without becoming lost and ending up at the ski lift. This project is expected to have a first cost of $2,000,000 and an annual maintenance cost of $50,000. In addition, major repairs costing $250,000 will be required after 25 years and each 15 years thereafter. Use an interest rate of 12% and determine the capitalized cost of the project.
A powerplant is burning coal on a cold, clear winter morning at 8am with a wind speed of 2.6m/s measure at 30m and an inversion layer with its base height of 697m. The effective stack height is 30m.
if the sphere falls at a speed of 150mm/s, what is the mean velocity relative to the cylinder wall of the water in the gap surrounding the midsection of the sphere
There are 3 forces acting on the ring. using the non vector approach, determine the resultant force of only the 150 Ib and 100 Ib forces. Also calculate the angle between the resultant force and the positive x axis.
the velocity varies linearly with time throughout the nozzle. the velocity at the base is 1t and at the tip is 4t. what is the local acceleration midway along the nozzle when t=2s
Tacoma Narrows Bridge. Conduct either a qualitive and quantitive risk assessment on this project. Identify the risk factors that you consider most important for the suspension bridge construction. How would you assess the riskiness of this project..
Samples of 20 rivets for a steel structure are checked for quality every hour. The probability of finding a bad rivet that has to be scrapped is 1%.assume that x is the number of parts in the sample of 20 that have to be scrapped.
Find the steel area required for beam which has b = 10 in. and d = 17.5 in. to carry a factored load moment of 1,600 in-kips.
For the data given below, derive the 2-hr unit hydrograph for a watershed having a drainagearea of 216 km^2, assuming a constant baseflow of 20 m^3/s.
The steel uniform shaft has four pulleys attached to it and frictionless bearings at its ends. The pulley at B is connected to a motor that is driving the system. The other three pulleys are consuming the power delivered by Pb .
The outer surface of the tank is cooled by air at 300 K with a heat transfer coefficient of 100 W/m2K. Determine the maximum temperature in the tank. Take the thermal conductivity of the wastes as 2.0 W/mK.
Compute the maximum acceptable service load on an A36 steel plate tension member 1/4in.x12in. having a single line of holes parallel to the direction of loading. The load is 25% dead load and 75% live load, and 7/8in. diameter bolts are used.
Determine the magnitudes of the additional loads that must be applied at B and F if the resultant of all six loads is to pass through the center of the mat.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd