Reference no: EM132171665
Scenario: PORTSMOUTH ROAD DEVELOPMENT
In this assignment you will pretend to be working for Portsmouth City Council on a new road scheme. This will include a flyover bridge linking Portsmouth City Centre directly to Gosport to make travel from the City towards Southampton much easier for motorists. The Council wants to sample residents' views first. Your role is to create an electronic questionnaire in Microsoft Word using Word controls to gather data. This will then be analysed using Access and Excel and incorporated into the design of a PowerPoint presentation.
Task 1: Microsoft Word
First you will sample ideas using a questionnaire, developed in Microsoft Word, containing questions similar to these:
How important do you rate the scheme on a scale 1-5?
Should the Royal Navy be consulted first?
What impact is the scheme likely to have on tourism?
Could naval vessels dock in Southampton Water instead?
Would a tunnel be a better idea than a bridge?
How much money should the UK Government contribute?
Include a minimum of 10, and maximum of 15, questions in your questionnaire. Ensure that, overall, these questions result in both text and numerical data being provided for your subsequent analysis. The questionnaire should be designed so that it could be sent as an email attachment. It must contain these Microsoft Word controls: option buttons, check boxes, date picker and drop-down lists. You will then generate data from twenty such questionnaires.
Task 2: Microsoft Access
You will now design a Microsoft Access database for the raw data from your questionnaire. The database will include a table including fields of appropriate data type. Analysis of the data you have gathered in Task 1 must be carried out, producing a query and a report.
Task 3: Microsoft Excel
Next you will analyse numerical data gathered from your questionnaires using Microsoft Excel. This analysis will be statistical and include the mean, median and mode of relevant data. The spreadsheet should show that you can calculate standard deviation and perform correlation between different datasets. In addition you will insert appropriate graphs and charts into your spreadsheet.
Task 4: Microsoft PowerPoint
Using PowerPoint, you will design a presentation of your collection and analysis of data. This presentation should enable informed and sensible decisions to be made about how viable the new road scheme would be.
Attachment:- Assignment File.rar