DESIGN PROJECT - CIVIL AND STRUCTURAL ENGINEERING - STEEL FABRICATION WORKSHOP, STORES, AND OFFICES

The work you will complete for this unit will require you to demonstrate the validity of the knowledge and experience that you have acquired from previous CDU units or elsewhere in recent years. You will also have to seek out and work with additional resources to develop your knowledge and understanding of new topics or topics that may have been introduced in earlier studies. The University must be satisfied that you are able to bring all the various skills you are expected to possess to the effective solution of design problems - whether or not the problem is presented in terms that are within your actual previous experience.

In selecting and developing your design of structures, you should also remember general guidance given in previous design studies, and in particular:

a) all structures must be safe;

b) a good design has certain typical features of simplicity, unity, and necessity;

c) structures must fulfil their intended function.

Client's requirements

1. A steel fabricator wishes to construct a new workshop with offices and stores. A crane with a safe working load of 15 tonnes will provide full coverage of the workshop area, which is to be column-free (see Figure 1-attached).

2. Two doors each 11.0 m wide × 7.0 m high are to be provided in the west and south elevations.

3. The elevations for the whole development including the roof are to be in lightweight construction using metal cladding. Roof lights are to be provided over 20% of the roof area.

4. The maximum overall height of the workshop is to be limited to 15.0 m. The maximum spacing of perimeter columns is to be 10.0 m. The office and store areas are each to have two levels with a minimum floor to floor height of 4.0 m.

5. The minimum hook approach is to be 1.5 m. The overall depth of the crane including hoist is to be 1.5 m with a clear height of 8.0 m from floor level to the underside of the crane bridge.

Assignment 1 - Statement of Work (and Initial Conceptual Design)

Prepare a design solution with appropriate sketches indicating a distinct and viable structural solution for the proposed structure including the foundations. Your solution must comply with all the requirements of the Client's brief.

A clear statement must be made for the proposed design to indicate the fundamental philosophy of its design, and materials to be used.

You will need to provide numerous (hand-drawn) sketches to include a plan view of the scheme, together with sufficient elevations and sections to describe important features of the design.

These sketches must clearly indicate the: functional framing, load transfer, and stability aspects of the scheme that you propose.

Assignment 2 - Critical Analysis of Options (and Further Conceptual Design)

a) Prepare a second conceptual design solution, again with appropriate sketches for a viable structural solution for the proposed structure and its foundations. This solution must also comply with all the requirements of the Client's brief.

A clear statement must be made for the proposed design to indicate the fundamental philosophy of its design, and materials to be used.

As in Assignment 1, you will need to provide numerous (hand-drawn) sketches of plan views of the scheme, together with sufficient elevations and sections through the building to describe important features of the design.

These sketches must clearly indicate the: functional framing, load transfer, and stability aspects of the scheme that you propose.

CHANGING MATERIALS BUT USING THE SAME STRUCTURAL DESIGN IS NOT ACCEPTABLE AND WILL RESULT IN AUTOMATIC FAILURE OF THIS UNIT.

b) Consider both of the proposed solutions, and make a recommendation regarding which one you would choose to develop, giving reasons to support your choice.

c) After the workshop has been built, and due to an increase in workload, the Client needs to replace the existing crane with one with a higher capacity capable of lifting up to 30 tonnes. Write a letter to the Client explaining how this can be achieved, and include this letter in your submission for this Assignment.

Assignment 3 - Final Design Recommendation (and Detailed Design)

Detailed design of a number of structural elements and foundation(s) will be required for Assignment 3. Further information of which elements are to be designed will be available later in the Unit.

Attachment:- Assignment File.rar

Reference no: EM131889001

Questions Cloud

Phosphoric acid ad sodium phosphate : ?Two solutions are made containing the same concentrations of solutes. One solution is composed of phosphoric acid ad sodium phosphate
What are the various adverse health outcom : What are the various adverse health outcomes that occurred as a result of exposure to the environmental hazard?
Describes the development and deployment plan for project : Describes the development and deployment plan for your project. Your development cycles should conform to some type of methodology.
Research on the topic-health hazards caused : Explain how you can determine whether you are exposed to increased levels of environmental hazards in your home.
Design of a number of structural elements and foundation : ENG405 INTEGRATED DESIGN A - PRT507 SYSTEM DESIGN A. Detailed design of a number of structural elements and foundation(s) will be required for Assignment 3
Talk about the technical issues of migrating : Talk about the technical issues of migrating from IPv4 to IPv6 and how can the smooth transition be done - research and developyour arguments
Determining the thermochemical equations : Consider the following thermochemical equations.
Analyze the intended impact of environmental health laws : What is the role of various government agencies that are charged with enforcing and evaluating the impact of the law?
Total mass of solids remaining : What is the extent of reaction, ?, when the total mass of solids remaining (KClO3 plus KCl) is 5.52 g?

Reviews

len1889001

3/6/2018 2:58:06 AM

In assignment 3 it is not clear what we need to do. But I want the total Detailed design of a number of structural elements and foundation(s). Please ask the expert that we want the detail design and the work done according to the assignment level. Graduate engineers from Charles Darwin University must have the ability to design and a facility to communicate their design intentions. Where you are required to list and discuss possible solutions you must show by brief, clear, logical and systematic presentation that you understood the general engineering principles involved.

len1889001

3/6/2018 2:58:00 AM

There is a substantial section called “Civil and Structural Resources” on the Learnline website for this Unit which contains valuable information which you should read, and with which you should become familiar. Some of this information is background material; other documents will help you with initial design and sizing of elements. Access to Microstran is also available, which you will need to use either at the end of this Unit or at the start of the next Design Unit which follows on from this one.

len1889001

3/6/2018 2:57:55 AM

The titles of each of the Technical Guidance Notes currently available are provided on a separate 1-page document within “Civil Resources”. These Notes can be accessed through the archive section of “The Structural Engineer” which CDU students can access (free) once they have joined the Institution of Structural Engineers as (free) Student Members and registered with their electronic information system. Note: All dimensions are in metres.

Write a Review

Civil Engineering Questions & Answers

  Engineering ethics and ethical issue

what is the engineering ethics course where to write about any engineering ethical case and discuss the ethical issue?

  Engineering ethics and concept and cases

what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?

  Transportation and management

In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.

  Supporting Investment Promotion: ERNST & YOUNG

Ernst & young is currently providing support to various sectors. In this regards it was felt that if this report is able to document good practices currently being adopted or planned in ceramic sector.

  Personalized Cancer Therapy-A step forward

Cancer is the uncontrolled growth of abnormal cells in the body resulting in tumours that can be benign or malignant (cancerous cells). A proper treatment is necessary to fight with this serious disease.

  Discuss the different environmental companies

Discuss the different agencies, institutes, centers, different environmental companies that are active in UAE.

  Develop a simple urban constructed wetland design

Develop a simple urban constructed wetland design.

  Evaluate company performance in relation to GRI standards

Evaluate company performance in relation to GRI standards and comment on Stigler's theory.

  Water system design

Determine the corresponding error in the computed discharge

  Hydraulic behaviour in open channel

Describe how test flumes and associated equipment are used to assess and confirm hydraulic behaviour in open channel

  Write a paper on steel sustainability

Write a paper on steel sustainability.

  Writing case study about bridge collapse

Writing case study about bridge collapse

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd