Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Design a balcony slab exposed to the weather. The cantilevered span is 8 ft and the service live load is 100 psf. fc' = 4,000 psi, fy = 60,000 psi. [Hint: Reinforcement is placed on top. For thickness of slab, in addition to the provision of the main steel and shrinkage steel, at least 3 in. of depth (cover) should exist over and below the steel.]
The segment of river shown has a rectangular cross-section, with width 50 ft. The river bed is at angle theta=10 degrees from horizontal. The average velocity is 2 ft/s at the upstream end, and 3 ft/s at the downstream end.
Determine the diameter of glass tubing that is necessary for the capillary rise to be less than 0.5 mm. Assume the fluid is water with surface tension equal to 0.0728 N/m and specific weight equal to 9800 N/m3
A 12-in. square concrete pile is driven into clay to a depth of 40 feet. Unit weight is 115 pcf, and qu is 2000 ksf. Find the pile's design capacity if the factor of safety is 2.
A quality of water within a piston-cylinder assembly executes a Carnot power cycle. During isothermal expansion, the water is heated from saturated liquid at 50 bar until it is a saturated vapor. The vapor then expands adiabatically to a pressure ..
what is the equivalent PF rate constant that would be used to describe treatment in a series of three CM reactors in terms of flow (Q), the total volume in the system (V), and the rate constant observed for the CM system
Engineering ethics concepts and cases
A cylindrical tank 5-m in diameter is filled with water to 3-m depth. A very short horizontal pipe with 20-cm diameter and rotary valve is used to drain the tank from the bottom.
The receiver's velocity is constant at 10 yd/sec, and he catches passes when the ball is 6 ft. above the ground. If the quarterback desires the receiver to catch the ball 2.5 sec. after the launch instant, determine the initial speed v0 and angle,..
As a project manager on site where work for 3 km long tunnel has been undertaken the site is remote and takes about 2 days to travel to nearest town supervisors technicians and skiled workers in dangerous work.
In taping from A to B, a tree on-line necessitated setting an intermediate point C offset 4.5ft to the side of line AB. Line AC was then measured as 368.92ft along a uniform 4% slope
The local engineer concludes that, since the oil must have been destroyed by the soil microorganisms at a rate of 20 mg/kg each year, in one more year the site will be free of all contamination. a. Is this a good assumption
A glass jar is heated in an oven and sealed when the air pressure is 103 kPa and the temperature is 105 C. Find the absolute, gage, and vacuum pressures in the jar when it cools to 20 C.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd