Describe the steps of an eia process

Assignment Help Civil Engineering
Reference no: EM13969239

A small Municipality population predication shows an increase of 3.2% over the next 15 years. The Municipality in developing, Master Plan, consider the future infrastructure requirements for the increase in population which also includes drinking water requirements to fulfill needs of the future growth requirements.

The Municipality has undertaken in Environmental Assessment with several alternatives and selected an alternative for future drinking water requirements which is more economical and pose less environmental consequences and is the shortest possible route for the future pipeline. The best alternative is short route and cost effective.

However, the best alternative alignment for the proposed pipeline is passing through a small wetland and has to cross local creek named Tributary 1. A group of people known as friends of the Tributary 1 and property owner are against the proposed best alternative. They think that the proposed local alignment of the pipelines is passing through stream and private property where there is wetland which may have species at risk which needs to be protected. Also, the groundwater may fluctuate quite often in one section of the proposed alignment.

You are project engineer working with a consultant to undertake an EIA process to assess the impact of the proposed alignment of the pipeline on the wetland and the stream.

1. Describe the steps of an EIA process for the above subject project;

2. Who will you consider in public participation and why;

3. What type of base line data will you need for the EIA;

4. Develop an ICID checklist by considering the environmental problems and its affects. The checklist should provides a comprehensive and practical possible impacts of the projects on the environment;

Attachment:- Referencematerial.rar

Reference no: EM13969239

Questions Cloud

What is one marketing concept involved in the article : What is one marketing concept involved in the article by Bloom and Dalphe (1993).Provide support for your analysis.
Target selling price per unit under absorption costing : Compute the target selling price per unit under absorption costing. (Do not round intermediate calculations. Round your final answer to 2 decimal places.)
Vietnam to china to the bay of bengal : The temples of Angkor, built by the Khmer civilization between 802 and 1220 AD, represent one of humankind's most astonishing and enduring architectural achievements. From Angkor the Khmer kings ruled over a vast domain that reached from Vietnam to C..
Execution phase of the project life cycle : For this assignment, consider and discuss the degree to which the likelihood and impact of specific risks is anticipated to change during the Execution phase of the project life cycle
Describe the steps of an eia process : Describe the steps of an EIA process for the above subject project - who will you consider in public participation and why and what type of base line data will you need for the EIA
How does this ethical issue impact nursing and health care : How does this ethical issue impact nursing and health care? What is the relevance of this ethical issue? Why you think this ethical issue is important to resolve?
Prepare the income statement statement of changes in : Talley Inc. experienced the following events in 2016, in its first year of operation: Prepare the income statement, statement of changes in stockholders' equity, balance sheet, and statement of cash flows for the 2016 accounting period.
Show that the sherwin-williams product is the best value : Using the concept of life cycle costing, Show that the Sherwin-Williams  product is the best value for the final customer Write a one page FORMAL business letter (NOT AN EMAIL - see below) to Mr. Miller with your recommendation and showing your ca..
Analysis of this offer for the hotel manager : Prepare an analysis of this offer for the hotel manager.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Compute azimuth of line pc to point p and chord distance

Given the stationing in meters as (4+56) for the PC of a horizontal curve of radius R=1200 meters and angle I=22°. The azimuth of the line PC to PI as AzPC-PI = 155° 30'. A point P is to be located on the curve at stationing of 7+00.

  Calculate the change in reservoir pore volume

A reservoir cover is 12,000 acres and is 20 feet thick. The formation has initial porosity of 0.25. The pore volume compressibility of the reservoir rock is 3.0 x 10^(-6) psi^(-1) . Calculate the change in reservoir pore volume (in barrels) if the re..

  How long can the turbines produce 380 of power from the

How long can the turbines produce 380.0 MW of power from the release of the mass of stored water calculated above? Assume the water sustains a friction loss of 39.5 m2/s2 on the way down to the turbine.

  Design the flexural reinforcement for this member

A rectangular concrete beam of width b = 24 inches is limited by architectual considerations to a maximum total depth of h = 16 inches. it must carry a total factored load moment of Mu = 400 ft-kips. Design the flexural reinforcement for this member,..

  Prepare an additional detail claim

Prepare an additional detail claim in order to adjust the cost overrun. For example, under the part "d" instead of timber trusses client prefers steel trusses. It causes massive impact on rates whereas the provided BoQ doesn't have such items. In ..

  Determine what are air flow and particulate concentration

Three streams of polluted air are combined prior to treatment in an electrostatic precipitator (ESP). The flow and particulate concentration of each stream are 600 cfm at150 mg/m^3, 700 cfm at 200 mg/m^3, and 500 cfm at 1000 mg/m^3.

  Determine the increment of vertical stress in the soil

Constructing the foundation causes changes in the levels of vertical stress at all points in the soil. One such point lies at the centre of the footing plan, and is at a depth of 10 m. Determine the increment of vertical stress there.

  Calculate max bending stress and shear stress in the pole

A Timber power-line pole is 10 in. in diameter at its base where it is solidly embedded in concrete. The pole extends 20 ft vertically upward from its base and is subjected to a horizontal pull of 300 lb at its top.

  Determine the true azimuth and bearing for that line

For the simple curve with an arc length of 1090.83 feet and a tangent of 606.81 feet, if the station of the PI is 24+57.00, what are the stations of the PC and the PT?

  Estimate the chronic daily intake of trichloro ethane

Estimate the chronic daily intake of 1,1,1-trichloro ethane from exposure to a city water supply that contains a 1,1,1-trichloroethane concentration equal to the drinking water standard of 0.2 mg/L.

  Determine what is the porosity of the soil sample

The sample is placed in a 103 F oven overnight and is weighted again the next day. If the weight after drying is 0.85 lb and the specific gravity of the soil granuals is 2.65, what is the porosity of the soil sample

  Determine which of the following statements is true

The velocity and pressure are given at two points in the flow field. Assume that the two points lie in a horizontal plane and that the fluid density is uniform in the flow field and is equal to 1000 kg/m^3. assume steady flow. Then, given these data,..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd