Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Assume you are observing traffic in a single lane of a highway at a specific location. you measure the average headway and average spacing of passing vehicles as 3 seconds and 150 ft, respectively. calculate the flow, average speed, and density of the traffic stream in this lane.
Using the USLE, estimate the annual erosion from a 100 ha. forested watershed assuming the following: R =112 tonnes/ha/year. The forest is in fair condition with 40% cover; Average slope is 3%; The soils are clay loam in hydrologic group C.
The section of the plywood in the 3rd quadrant is sawed off and the resulting piece is then glued squarely over the 4th quadrant portion of the plywood with glue of negligible weight.What are the x- and y-coordinates of the resulting center of gra..
Compare the total reactor volume required for 90% removal of the same pollutant in a CSTR system that contains a single reactor against a system that contains three CSTR reactors of equal volume in series.
Find the total mass, quality of steam, specific volume, specific enthalpy, and specific internal energy.
Develop a simple urban constructed wetland design.
Assuming unit surface area, find the conductive heat loss through the furnace wall and the temperature at the interface of the fire clay and red brick.
In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.
Cancer is the uncontrolled growth of abnormal cells in the body resulting in tumours that can be benign or malignant (cancerous cells). A proper treatment is necessary to fight with this serious disease.
Determine the minimum distance from the diversion that a road sign should be located informing drivers of the temporary change on the highway. The letter height on the road sign is 5 inches.
Suppose that the distance from the lake outlet to the withdrawal cannot be more than 20 mi. What should be the new volume of the lake?
Assuming that the velocity variation within the main channel and the floodplain subsections is much smaller than the change in mean velocities between subsections, find the value of the kinetic energy correction coefficient.
Use the bisection method to find the root of the equation f(x) = x 2 - 4sin(x) = 0. For initial bracketing interval [a,b] , take a=1 and b = 3.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd