Definition of earth filled dams and types

Assignment Help Civil Engineering
Reference no: EM131274723

Assignment

There are many types of dams that are used for the purpose of water storing. Earth fill dams are artificial water barriers. They are constructed basically by compiling and compacting of various compositions of soil, sand, clay and/or rock. In Oman, this type of dams is widely used.

As geotechnical engineer, you are required to write a report presenting the following:

A. Different components of all types of earth fill dam.
B. The type of soil that should be used in each component and its geotechnical properties.
C. Draw a neat proportionate free hand sketch of a typical earth filled dam showing all the components and describe their functions.
D. the general compaction procedure which is followed in any earth dam project
E. The regulations and specifications that followed for compaction works for earth dam in Oman.
F. The experiments that are used to control the quality of the compaction works. Contents of the report

1. Title page (template will be provided).
2. Marking sheet
3. Table of contents.
4. Chapter 1 Introduction
      Here students should describe clearly:
      a) The aim and the objectives of this report
      b) The definition of earth filled dams and types.
5. Chapter 2 Components of earth filled dam
     Here student should answer points A, B, and C of the assignment.
6. Chapter3: Compaction and its importance in earth filled dam projects
     Here student should answer points 0, E, and F of the assignment.
7. Chapter4: Case Studies from Oman
     Discussing an earth filled dam case which was constructed in Oman. The discussion should include points A, B, D, and E
8 References: CCE referencing style should be used.

Submission Requirement

1. The course work is an individual work and you have to write it in your own words.

2. The report should not be less than 1500 words neatly typed using any word processing software

3. Use White A4 sheet, typed on both sides, Font - Arial, size 11, line spacing - 1.5

4. Support the report with drawings and pictures and similar relevant work examples.

5. Proper referencing should be done for the drawings, pictures and quotes, if it is taken from any other source. CCE referencing style should be followed here.

Reference no: EM131274723

Questions Cloud

Sub-data management : When an update to the database takes place, the time of the update, the values of the data before and after the update, and the type of lock used are recorded in the transaction log. true or false?
Values of the data before and after the update : When an update to the database takes place, the time of the update, the values of the data before and after the update, and the type of lock used are recorded in the transaction log. true or false?
Design an annealing treatment for a 1050 steel : Design an annealing treatment for a 1050 steel. Be sure to include details of temperatures, cooling rates, microstructures, and properties.
Establishment of many access categories : If you were designing the file access control for a highly secure environment and were given a choice between the establishment of many access categories and just a few access categories, which you would select and WHY? Explain the advantages and ..
Definition of earth filled dams and types : Draw a neat proportionate free hand sketch of a typical earth filled dam showing all the components and describe their functions - the general compaction procedure which is followed in any earth dam project
Mitigate the ethical dilemma : If data meant for one use is diverted to another process which is socially redeeming and would result in a greater good or could result in a financial gain, does that mitigate the ethical dilemma, no matter how innocent and pure the motivation?
The strict liability claims are preempted by fifra : How do you think the Supreme Court ruled on this appeal? Do you think the strict liability claims are preempted by FIFRA?
Generation of wlan device to the next : Discuss how physical layer changes have contributed to transmission speeds exploding from one generation of WLAN device to the next.
Analyze the events that have caused to occur : Your activity is to analyze the events that have caused this to occur. Pretend that you have a stack of dominoes. Just as dominoes fall over with a cause/effect phenomenon.

Reviews

len1274723

11/12/2016 3:53:39 AM

3 Chapter3: Compaction and its importance in earth filled dam projects D. the general compaction procedure which is followed in any earth dam project (Point C above) 10 E. The regulations and specifications that followed for compaction works for earth dam in Oman. 10 F. The experiments that are used to control the quality of the compaction works. 10 4 Chapter4: Case Study from Oman Discussing an earth filled dam case which was constructed in Oman. The discussion should include points A, B, D, and E 10 Overall style and language of the paper: - Consistency of fonts, proper spacing, alignments, adherence to naming conventions, grammars and spelling, using CCE referencing style. 20

len1274723

11/12/2016 3:53:28 AM

The following marking sheet will be used to evaluate this course work. This marking sheet should be attached into each report. Sr. No. Requirements Maximum Mark , Allotted i Mark 1 Chapter 1 Introduction 1---- The aim and the objectives of this report 5 The definition of earth filled dams and types 5 2 Chapter 2 Components of earth filled dam A. Different components of all types of earth fill dam. 10 B. The type of soil that should be used in each component and its rotechnical properties 10 C. Draw a neat proportionate free hand sketch of a typical earth filled dam showing all the components and describe their functions. (Note: no credit will be given for disproportionate and badly drawn sketch) 10

len1274723

11/12/2016 3:48:17 AM

Contents of the report 1. Title page (template will be provided). 2. Marking sheet 3. Table of contents. 4. Chapter 1 Introduction Here students should describe clearly: a) The aim and the objectives of this report b) The definition of earth filled dams and types. 5. Chapter 2 Components of earth filled dam Here student should answer points A, B, and C of the assignment. 6. Chapter3: Compaction and its importance in earth filled dam projects Here student should answer points 0, E, and F of the assignment. 7. Chapter4: Case Studies from Oman Discussing an earth filled dam case which was constructed in Oman. The discussion should include points A, B, D, and E 8 References: CCE referencing style should be used. Submission Requirement 1. The course work is an individual work and you have to write it in your own words. 2. The report should not be less than 1500 words neatly typed using any word processing software 3. Use White A4 sheet, typed on both sides, Font - Arial, size 11, line spacing - 1.5 4. Support the report with drawings and pictures and similar relevant work examples.

Write a Review

Civil Engineering Questions & Answers

  Engineering ethics and ethical issue

what is the engineering ethics course where to write about any engineering ethical case and discuss the ethical issue?

  Engineering ethics and concept and cases

what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?

  Transportation and management

In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.

  Supporting Investment Promotion: ERNST & YOUNG

Ernst & young is currently providing support to various sectors. In this regards it was felt that if this report is able to document good practices currently being adopted or planned in ceramic sector.

  Personalized Cancer Therapy-A step forward

Cancer is the uncontrolled growth of abnormal cells in the body resulting in tumours that can be benign or malignant (cancerous cells). A proper treatment is necessary to fight with this serious disease.

  Discuss the different environmental companies

Discuss the different agencies, institutes, centers, different environmental companies that are active in UAE.

  Develop a simple urban constructed wetland design

Develop a simple urban constructed wetland design.

  Evaluate company performance in relation to GRI standards

Evaluate company performance in relation to GRI standards and comment on Stigler's theory.

  Water system design

Determine the corresponding error in the computed discharge

  Hydraulic behaviour in open channel

Describe how test flumes and associated equipment are used to assess and confirm hydraulic behaviour in open channel

  Write a paper on steel sustainability

Write a paper on steel sustainability.

  Writing case study about bridge collapse

Writing case study about bridge collapse

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd