Define what is master plan

Assignment Help Civil Engineering
Reference no: EM13954495

The City of London Council adopted Master Plan for Downtown London on April 14, 2015 called Our Move Forward London's Downtown Plan.

According to the Master Plan, the downtown London plays an important role in the life of Londoners. It is the cultural heart and the original neighborhood of the city. The downtown is, and has historically been, a critical employment centre and economic engine. It is a pillar of the community and provides the basis for our future prosperity by attracting people to live and invest in London.

One of the proposed project is transformation of the fork of the Thames River. The Forks of the Thames project envisions an urban walkway along the bank of the Thames River and a captivating urban park space at the foot of Dundas Street, linking activity on Dundas Place with riverfront activities. The proposed project is River views will be reestablished to reconnect the downtown and the riverfront. A 2015 design ideas competition for London's central riverfront, hosted by the London Community Foundation, will inform the development opportunities associated with this project.

Riverfronts in cities all over North America are entering a period of rejuvenation. These natural assets, which for the past many decades have not been a focus, are now becoming prominent economic development tools. Creating great riverfront public space has been a successful tool in revitalizing many downtowns, large and small, across the continent. For London, the Forks of the Thames is not only the historical founding site of our city, but it has long been the centre point of social life in London. The project details are given on page 54 of the aforementioned Master plan which can be found at:

https://www.london.ca/business/Planning-Development/downtown/Documents/Our-Move-Forward-LondonsDTPlan-adopted-April-14-2015.pdf

1. Define what is Master Plan;

2. List the effects of this proposed project on the environment by keeping in view the deifintion of the "environment" under the Environmental Assessment Act;

3. List the economic gains from the project;

4. As project engineer, how will you explain the economic gains of the proposed project vs. encroachment into the floodplain and riparian buffer;

5. Who will be your target for public consultation;

6. Consider the social context of the project; and

7. Discuss the institutional frame work for the EA considered for the project (City of London vs. UTRCA).

Verified Expert

The given solution is prepared in MS Doc, There were 7 Problems of Civil Engineering which has been solved in more than 500 words count. This is verified solution and its answering all the questions mentioned in requirement. The Topic is about "Master Plan is Our Move Forward London's Downtown Plan".

Reference no: EM13954495

Questions Cloud

Organizational culture analysis : Symbols of culture are called artifacts. Artifacts are the most visible and accessible level of culture. These include behaviors, stories, rituals (everyday practices that are repeated frequently), and symbols (e.g., company logos, company colors)..
Understanding the accounting treatment : You are the financial director of Pilgrim plc, a listed company. Your new group managing director, appointed from one of Pilgrim plc's overseas subsidiaries, is reviewing the principal accounting policies and is having difficulty understanding the..
Recent financial disasters in the news : Because of recent financial disasters in the news, the board of directors of your company decided that they wanted to ascertain that the organization's code of ethics was appropriate and in agreement with the Code of Professional Conduct (CPC) as ..
How the global scope has changed over time : How this global scope has changed over time. Identify the competitive advantages that your organization gains from the resources in its home country and/or another country or countries where it conducts significant activities.
Define what is master plan : Define what is Master Plan - List the effects of this proposed project on the environment by keeping in view the deifintion of the "environment" under the Environmental Assessment Act;
Explain what types of quality management processes : Please answer with cited source (APA format) the below questions. Organizational structures are functional, divisional, matrix, team-based and virtual network.
Arguments in favor of restricting public accounting firm : Summarize the arguments in favor of restricting public accounting firm ownership to those involved in public accounting - Summarize the arguments for allowing public, accounting firms to sell ownership interests to individuals not in public accounti..
Show that particle motion about one end of diameter passing : In the absence of a gravitational force, show that the particle's motion about one end of a diameter passing through the pivot point and the center of the circle, perpendicular to the axis of rotation, is the same as that of a plane pendulum in a ..
Problem regarding the consolidated financial statements : You are the management accountant of Tree plc, a listed company that prepares consolidated financial statements. Your Managing Director, who is not an accountant, has recently attended a seminar at which key financial reporting issues were discuss..

Reviews

Write a Review

Civil Engineering Questions & Answers

  Find the combined rate of discharge from the two orifices

A tank has two identical orifices, each 5 cm in diameter in one of its vertical sides and are situated one above the other. The upper orifice is 4 m below the water surfaceand the lower one is 6 m below the water surface.

  Calculate what is the pressure at the siphon crown

The siphon crown is 1.2m above the water surface elevation of the reservoir and a length 10m away from the siphon entrance. If the siphon diameter is 30 cm, if the friction factor is .02, and the headless coefficient are .2 (inlet) and 1 (exit),

  Determine what is the rolling resistance of the road

A CAT 834H (rubber tires, high pressure), specs found, is pulled up a road whose slope is +3.0% at a uniform speed. If the average tension in the towing cable is 6,060 lb, what is the rolling resistance of the road

  What is the airflow rate needed to maintain the skirts

A design for a hovercraft is made. A fan sends air in from the top of the rectangular chamber (60F) and is exhausted between skirts and the ground. Pressure in the chamber is responsible for lift, and the craft is 15 by 7 ft.

  What are the basic differences between the afl as a labor

What are the basic differences between the AFL as a labor union and the CIO type of union?

  Calculate factor of safety if the material does not yield

The program should use both the maximum shearing-strength criterion and the maximum-distortion-energy criterion. It should also print the values of the principal stresses and, if the material does not yield, calculate the factor of safety.

  What is the tp concentration in the lake one week after the

Over a long period, total phosphorus (TP) has been discharged to a lake through sewage and surface water runoff at a rate of 10 tons/day. Measures were then taken to reduce the TP load to 1 ton/day.

  When the pump operates the measured power draw is equivalent

A pump for a wastewater treatment plant has a motor with a nameplate rating of 20 HP. When the pump operates the measured power draw is equivalent to 15 HP. The pump operates 80% of the time.

  What is the maximum length to which it may be stretched

what is the maximum load that may be applied to a specimen with a cross sectional area of 130 mm^2 without plastic deformation.

  What is the effective vertical stress 12m below the water

A river is 6m deep. The riverbed material has a saturated unit weight of 19.5kN/m3. What is the effective vertical stress 12m below the water surface?

  Cd triaxial compression test

CD triaxial compression test the specimen was consolidated under an effective confining stress

  Develop a spreadsheet application that will display in table

develop a spreadsheet application that will display in a table the values of modulus of elasticity Ec for concrete having unit weight ranging from 95 pcf to 155 pcf (in steps of 5 pcf) and compressive strength ranging from 3500 to 7000 psi

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd