Define the decision variables and specify the objective

Assignment Help Computer Engineering
Reference no: EM133923425

Constrained Optimization Problems

A company produces 3 types of cables: A, B, and C. In-house production costs per foot of cables A, B, and C are $6, $8, and $10, respectively. The production process requires 5 resources: Drawing, Annealing, Stranding, Extrusion, and Assembly. For each resource, the table below specifies the number of minutes of the resource needed to produce a foot of each type of cable. For example, to produce each foot of Cable C, we need 0.1 minutes of Drawing, 0.2 minutes of Annealing, 0.3 minutes of Stranding, 0.1 minutes of Extrusion, and 0.4 minutes of Assembly. The column "Available hours", specifies the number of hours of each resource available during a production period.

For the next production period the firm is contractually obligated to produce 60,000 feet of A, 40,000 feet of B, and 120,000 feet of C. Due to limited resource availability, these demands cannot be met by in-house production alone. The company must procure cables from an outsourcing partner, at higher costs, to meet the demand. The costs per foot for purchasing cables A, B, and C from the outsourcing partner are $8, $10, and $15, respectively. Get online assignment help-AI & plagiarism-free-now!

The production manager must decide how much of each type of cable to produce in-house and how much to purchase from the outsourcing partner to meet the demands at minimum cost.

Relevant data is summarized in the table below:

Cable Type

A

B

C

Available hours

Demand (ft)

60,000

40,000

120,000

 

Production Cost/ft

$6

$8

$10

 

Purchase Cost/ft

$8

$10

$15

 

Drawing (mins/ft)

0.1

0.2

0.1

400

Annealing (mins/ft)

0.1

0.2

0.2

600

Stranding (mins/ft)

0.1

0.3

0.3

800

Extrusion (mins/ft)

0.1

0.3

0.1

500

Assembly (mins/ft)

0.2

0.1

0.4

1000

Task 1. Formulate the problem as a Linear Program.
Define the decision variables and specify the objective function and constraints.

Decision Variables:

Objective Function:

Constraints:

Task 2. Solve the LP and report your optimal solutions.

Minimum cost attainable = $ ___________________

Decision variable values under optimal solutions:

Cable Type

A

B

C

Produce (feet)

 

 

 

Procure (feet)

 

 

 

Resource use: Under the columns "Used" and "Not Used", specify the number of minutes of each resource used, and left unused, under the optimal solution.

Resource

Available (minutes)

Used (minutes)

Not Used (minutes)

Drawing

24,000

 

 

Annealing

36,000

 

 

Stranding

48,000

 

 

Extrusion

30,000

 

 

Assembly

60,000

 

 

Task 3. Sensitivity analysis.

The column "Cost per hour" in the table below specifies the production costs per hour for available resources. For example, the first 400 hours of Drawing costs $60 per hour. Under the column "Cost decrease per additional hour" specify the decrease in total cost if an additional hour of the resource is available; availability of all other resources remain unchanged. Under the column "Maximum amount for additional hour" specify the maximum amount that the company should be willing to pay for an additional hour of each resource (beyond its current availability). Briefly explain your reasoning.

Resource

Current availability (hours)

Cost per hour

Cost decrease per additional hour

Maximum amount for additional hour

Drawing

400

$60

 

 

Annealing

600

$240

 

 

Stranding

800

$180

 

 

Extrusion

500

$120

 

 

Assembly

1000

$300

 

 

Explanation:

How would the minimum cost obtained in Task 2 be affected if the purchase cost per foot of Cable C was $20 (instead of $15). Briefly explain your reasoning. (1 Point)

The company has identified another potential supplier, New-Partner. New-Partner can supply at most 1000 feet of Cable C, but the purchase price is subject to negotiations. What is the maximum price that the company should be willing to offer New-Partner per foot of Cable C? Briefly explain your reasoning. (1 Point)

Reference no: EM133923425

Questions Cloud

Forecasting method called a binary classifier : Forecasting method called a binary classifier. We will then work on how to visualize and understand a binary classifier
Describe how planning, staying on task : Briefly describe how planning, staying on task, meeting deadlines, and utilizing feedback can each have a positive impact on reducing risk and promoting
Create logging policies : Create logging policies. Please review NIST SP800-92, Guide to Computer Security Log Management, specifically Section
What types of intervention efforts could be successful : I would like you to consider gangs as a religion. What do you think of this theory? How does it compare to what we have learned about gangs in this class?
Define the decision variables and specify the objective : Define the decision variables and specify the objective function and constraints - How would the minimum cost obtained in Task 2 be affected if the purchase
What major court cases have advanced the rights of youths : What major court cases have advanced the rights of youths? Why is the juvenile justice system different from the criminal justice system?
How each of your selected wilsons points would help : Use this link and select 3 of the 14 points and explain how each of your selected Wilson's points would help make for a better world.
Describe moral dilemmas that police officers face : Describe moral dilemmas that police officers face. Identify some that are frequent and some that are unavoidable. Explain your answers.
How other half lives studies among the tenements of new york : How the Other Half Lives: Studies among the Tenements of New York Much of the urban reform described above was carried out by middle-class women challenging the

Reviews

Write a Review

Computer Engineering Questions & Answers

  Mathematics in computing

Binary search tree, and postorder and preorder traversal Determine the shortest path in Graph

  Ict governance

ICT is defined as the term of Information and communication technologies, it is diverse set of technical tools and resources used by the government agencies to communicate and produce, circulate, store, and manage all information.

  Implementation of memory management

Assignment covers the following eight topics and explore the implementation of memory management, processes and threads.

  Realize business and organizational data storage

Realize business and organizational data storage and fast access times are much more important than they have ever been. Compare and contrast magnetic tapes, magnetic disks, optical discs

  What is the protocol overhead

What are the advantages of using a compiled language over an interpreted one? Under what circumstances would you select to use an interpreted language?

  Implementation of memory management

Paper describes about memory management. How memory is used in executing programs and its critical support for applications.

  Define open and closed loop control systems

Define open and closed loop cotrol systems.Explain difference between time varying and time invariant control system wth suitable example.

  Prepare a proposal to deploy windows server

Prepare a proposal to deploy Windows Server onto an existing network based on the provided scenario.

  Security policy document project

Analyze security requirements and develop a security policy

  Write a procedure that produces independent stack objects

Write a procedure (make-stack) that produces independent stack objects, using a message-passing style, e.g.

  Define a suitable functional unit

Define a suitable functional unit for a comparative study between two different types of paint.

  Calculate yield to maturity and bond prices

Calculate yield to maturity (YTM) and bond prices

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd