Critically examine hasty decision of contract termination

Assignment Help Other Engineering
Reference no: EM131753597

Aim

To gain knowledge and understanding about contract clauses for implementation of construction projects and about the process of contract management.

Learning Outcomes

- To gain knowledge about procurement methods being followed in Oman
- To understand about different standard forms of contract in practice and their drawbacks.
- To get knowledge about types of contracts in practice.
- To understand the contract clauses and their applications.

Task A:

Scenario 1

An Infrastructure company is inviting contractors for the execution of a Hyper City Shopping Mall situated at major cross roads in Al-Hali South Muscat. The following facilities are provided in the proposed building complex.
- Shopping facility
- Restaurants/Entertainment zones
- Multiplex Theatres
- A three floor Multi Level Car Parking (MLCP) Facility (including the basement).
- Other Utility facility

Total plinth area of the building complex = 0.5M Sq.m. Duration of the project = 5 years
Cost of the project = 155, 000, 000 OMR.

The project has time schedules and the contractors need to adhere to the deadlines for its completion.
a) As a contract administrator explain the factors critically needed to be considered before accepting the job. Also discuss the factors that would likely to effect the project performance, if it would be implemented in European Countries.
b) Evaluate the tendering process and evaluation of the tenders for the given project.
c) Demonstrate the usage of standard form of contracts in Omani context
d) Suggest and review the suitable type of procurement method for the specified project

Scenario 2

After due evaluation of the received tenders by the client, M/s ABC construction company is awarded the project for the execution of Hyper City Shopping Mall. M/s ABC Construction company started the work as per the time lines. The project scheduled completion is 5 years. Project progress is reviewed by the client after 2 years and progress status is reported below:

Progress of the work: Only 35% of scheduled construction is achieved.

Further scrutiny of the tender documents, BOQ by the contract administrator the following deviations are noticed and reported below:

a) The contractor has been carrying out additional work without variation order in place. Many of small jobs has been executed by the contractor through verbal instructions, at the request of the client, for which either minutes of meeting(MOM) or verbal instructions have not been documented.

What actions the contract administrator has to initiate to avoid the disputes between the client and contractor for the smooth cash flow and project completion.

b) It is noticed that the contractor is submitting additional claims for the work variations which are not covered by the contract sum. Also it is recorded that the contractor is submitting the additional claims at short notice period for release of payments, which is affecting the scheduled cash flow.

As a Contract Administrator, what measures need to be adopted to ensure the timely cash flow for the smooth running for the project?

c) In spite of issuing Good for Construction (GFC) drawings to the contractor, contractor not adhered to the required specifications and major devotions were recorded on second floor Restaurants/Entertainment zones. Subsequently it was declared that the contractor was at fault for not following GFC drawings and the contractor was terminated. Work is awarded to anew contractor for the completion of the balance work.

Critically examine the hasty decision of contract termination by the client. Also suggest measures to avoid occurrence of such incidents.

d) During the in-situ concrete pile load testing by the quality control division it is noticed that the Piles PF2 and PF4 are failed at 82% and 86% of designed load. Verification of the records reveals that slump and cube strength tests on ready mix concrete were carried and certified for their confirmation to the code provisions.

As the Pile load test is failed, the contractor's is instructed to recast the new piles and the contractor's double claim is rejected for by the client. As the contractors is in the liability period.

The contractor administrators is requested to critically examine the responsibilities of the contractor's during defect liability period and suggest measure for the timely completion of the project with in the budget.

e) The High-Tension cable running across the site is affecting 2nd floor concrete slab. There is a need to shift the power cable utilities and it would likely to affect the project schedule by two weeks. The contractor submitted claims for idling charges of his men and machinery due to time delay's from the client side.

Examine the contractor's claim for compensation of idling charges of the men and machinery as per the scope of work and Terms of Reference (TOR) of the contract. Suggest suitable measures to for the timely completion of the project with in the budget resources.

f) Contractor became bankrupt before completion of the project. It is recorded that about 30% of work is pending for completion.

The contract administrator is summoned up to the site to resolve financial issues and help the contractor to restart the work immediately. Suggest suitable measures for the timely completion of the project.

Task B:

a) Individual presentation of the assignment including answer to the questions

Individual type of project will be informed to the students at the time of delivering the coursework. Your submission should be at least 2000 words and should be word processed in 1.5 line spacing in 12 point Times New Roman font for consistency in the report.

Verified Expert

In this assignment there has been two scenario given on the contract administration and the questions have been answered the factors included in contract in construction system has been discussed the various forms in the contract system has been decided and selection has been made.

Reference no: EM131753597

Questions Cloud

Explore how mark sims could better motivate employees : Explore how Mark Sims could better motivate employees he already has to become more productive and dedicated. Provide specific example to support your response.
Discuss the accounting profession is being automated : As we discussed last week with automated inventory control systems, more and more about the accounting profession is being automated
Anonymous firsthand account of the sioux : Anonymous Firsthand Account of the Sioux "Sun Dance" from History of Wahasha County, Minnesota (1884)
Promise and contradictions of freedom : President Andrew Jackson became president on March 4th 1829. How did Jackson represent both the promise and contradictions of freedom
Critically examine hasty decision of contract termination : MHK 224633 - What actions the contract administrator has to initiate to avoid the disputes between the client and contractor for the smooth cash flow
Outline an editorial supporting or opposing ratification : Outline an editorial supporting or opposing ratification of the Constitution. Be sure to explain why you have taken your position.
What do you think were three causes of the civil war : What do you think were three causes of the Civil War? Use examples from multiple different time periods and perspectives.
Create the piece of art : Create the piece of art. (Try to make it something fairly simple that will not take up too much time using whatever supplies you might have around the house.)
Critique how well the organization adapts to change : Critique how well the organization adapts to change. Discuss the primary internal organizational considerations for the development of a strategic plan.

Reviews

len1753597

12/6/2017 7:52:59 AM

2. The course work shall be subject to plagiarism software check. 3. Course work should be submitted on time. College guidelines on late submission of 5. Name, student identification and title of the course work to be written clearly and legibly on the cover page. 6. The completed course work is to be submitted to the departmental assistant on or before the deadline and record your name, date of submission and signature in the book with the departmental assistant. 7. For online submission of course work, pdf file with appropriate cover page mentioning name of student, student number and title of the course work should be uploaded using the submission link created and made available by the module leader.

len1753597

12/6/2017 7:52:44 AM

Marking scheme Component Description Weightage (%) 1 Task A: Scenario 1 25 2 Task A: Scenario 2 55 3 Task B 20 Total 100 Instructions 1. Plagiarism is a serious offence. In case of any plagiarism detected, penalty will be imposed leading to zero mark.

Write a Review

Other Engineering Questions & Answers

  Characterization technology for nanomaterials

Calculate the reciprocal lattice of the body-centred cubic and Show that the reciprocal of the face-centred cubic (fcc) structure is itself a bcc structure.

  Calculate the gasoline savings

How much gasoline do vehicles with the following fuel efficiencies consume in one year? Calculate the gasoline savings, in gallons per year, created by the following two options. Show all your work, and draw boxes around your answers.

  Design and modelling of adsorption chromatography

Design and modelling of adsorption chromatography based on isotherm data

  Application of mechatronics engineering

Write an essay on Application of Mechatronics Engineering

  Growth chracteristics of the organism

To examine the relationship between fermenter design and operating conditions, oxygen transfer capability and microbial growth.

  Block diagram, system performance and responses

Questions based on Block Diagram, System Performance and Responses.

  Explain the difference in a technical performance measure

good understanding of Mil-Std-499 and Mil-Std-499A

  Electrode impedances

How did this procedure affect the signal observed from the electrode and the electrode impedances?

  Write a report on environmental companies

Write a report on environmental companies

  Scanning electron microscopy

Prepare a schematic diagram below of the major parts of the SEM

  Design a pumping and piping system

creating the pumping and piping system to supply cool water to the condenser

  A repulsive potential energy should be a positive one

Using the data provided on the webvista site in the file marked vdw.txt, try to develop a mathematical equation for the vdW potential we discussed in class, U(x), that best fits the data

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd