Critically evaluate the application of measurement rules

Assignment Help Civil Engineering
Reference no: EM132864061

CE701 Applied sustainable construction technology & Measurement - Kingston University London

Module - Applied sustainable construction technology & Measurement

Learning Outcome 1: Demonstrate a working knowledge of the construction of low and high-rise buildings both commercial and residential
Learning Outcome 2: Demonstrate the ability to competently specify the building technologies involved in the construction of complex structures.
Learning Outcome 3: Measure structures and work sections of complex buildings and infrastructure works competently.
Learning Outcome 4: Critically evaluate the application of measurement rules of standard industry conventions in quantifying complex construction works.

Assessment task

Part 1
The work in Part 1 is to be measured in accordance with the latest Civil Engineering Standard Method of Measurement (CESMM).

Take off the quantities and prepare descriptions for the piles, pile caps, and bridge abutments in the drawings numbered 5120315-BR-DD-001, 5120315-BR-DD-002,5120315-BR-DD-003, 5120315-BR-DD-004, and 5120315-BR-DD-005.

You are to measure thein-situ concrete, reinforcement and formwork only.

Part 2

The work in Part 2 is to be in accordance with the New Rules of Measurement 2 (NRM2).

Using the information supplied, this includes drawings, finishing schedules and door and window schedules, measure and price the internal finishes for the semi-detached houses using CostX software.

You are to also prepare:
• Items for inclusion in the Preliminaries Bill for the Employers requirements (NRM2 1.1);
• A BQ Provisional item for £7,200 to be spent on fencing; and
• A Dayworks Bill

(You may make an estimate of the cost of the dwelling and assumptions of the trades needed)

Note: Preamble clauses may be written if needed.

Part 3
Using the BIM model of the technical college building provided, measure completely, the following elements:
• Floors
• Roof
• Curtain Wall

Part 1
The work in Part 1 is to be measured in accordance with the latest Civil Engineering
Standard Method of Measurement (CESMM).

Take off the quantities and prepare descriptions for the piles, pile caps, and bridge abutments in the drawings numbered 5120315-BR-DD-001, 5120315-BR-DD-002,5120315-BR-DD-003, 5120315-BR-DD-004, and 5120315-BR-DD-005.

You are to measure thein-situ concrete, reinforcement and formwork only.

Part 2
The work in Part 2 is to be in accordance with the New Rules of Measurement 2 (NRM2).

Using the information supplied, this includes drawings, finishing schedules and door and window schedules, measure and price the internal finishes for the semi-detached houses using CostX software.

You are to also prepare:
• Items for inclusion in the Preliminaries Bill for the Employers requirements (NRM2 1.1);
• A BQ Provisional item for £7,200 to be spent on fencing; and
• A Dayworks Bill

(You may make an estimate of the cost of the dwelling and assumptions of the trades needed)

Note: Preamble clauses may be written if needed.

Part 3
Using the BIM model of the technical college building provided, measure completely, the following elements:
• Floors
• Roof
• Curtain Wall

Practical Report
The report should be submitted online as a single combined Word or pdf file. The exf files for Part 2 and Part 3 are to be submitted separately as supporting information

Part 1
Your work should be presented as per CESMM4 and industry standard format within the combined Word or pdf report file.

Part 2
Your work should be presented as per NRM2 and industry format within the combined Word or pdf report file. The report must include query sheets and the pdf priced bill generated from your iTWOcostX building file. Theexf file containing all your measurements and costings must also be submitted. Marks will not be awarded for the accuracy of rates used in pricing, rather marks will be awarded for the skilful use iTWOcostX as an integrated measurement and costing software.

Part 3
Your work should be presented as per NRM2 and industry format within the combined Word or pdf report file. This must include query sheets and the pdf priced bill generated from your iTWOcostX building file. Theexf file containing all your measurements must also be submitted.

Word Limit: No set word limit. A limit of three files can be submitted: one report and two exf files.

Research and referencing

You are expected to refer to the indicative bibliography of the module provided in the Module Descriptor and the additional bibliographic sources suggested in the lecture programme and notes. In addition, you must undertake your own appropriate further reading and research in relation to the matters addressed in this coursework brief. Evidence of independent reading and research will be rewarded. A list ofReferences must be presented at the end of the report listing all bibliographic sources cited in the main report.

Attachment:- Sustainable construction technology.rar

Reference no: EM132864061

Questions Cloud

Complete external environmental scan : Complete the external environmental scan for your organization. Perform an internal competitive environmental scan for your organization.
Quality management : Determine one key differentiating factor between the new approach to quality and performance management that you chose and past approaches
Change management system : You and your manager reviewed the change management system you defined for the project
Find the break-even point for Gardner Corporation : Find the break-even point (rounded to the nearest dollar) for Gardner Corporation for the current year
Critically evaluate the application of measurement rules : Critically evaluate the application of measurement rules of standard industry conventions in quantifying complex construction works
Explain the goals of firms and role of financial concepts : Explain the goals of firms and the role of financial concepts in value creation? Identify the role of firms and the roles and responsibilities
Calculate depreciation expense at the end of the first year : The Cerearls Company purchases equipment for $100,000. Calculate depreciation expense at the end of the first year using the double-declining balance method
What amount should lucban report as bonds payable : In its December 31, 2020 statement of financial position, what amount should Lucban report as bonds payable
What should Phil have done differently : The cost of the new machine by itself was listed in the proposal at $1.1 million. What should Phil have done differently

Reviews

len2864061

4/21/2021 9:24:58 PM

This coursework involves quantity surveying measurement both manual and in CostX

Write a Review

Civil Engineering Questions & Answers

  Engineering ethics and ethical issue

what is the engineering ethics course where to write about any engineering ethical case and discuss the ethical issue?

  Engineering ethics and concept and cases

what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?

  Transportation and management

In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.

  Supporting Investment Promotion: ERNST & YOUNG

Ernst & young is currently providing support to various sectors. In this regards it was felt that if this report is able to document good practices currently being adopted or planned in ceramic sector.

  Personalized Cancer Therapy-A step forward

Cancer is the uncontrolled growth of abnormal cells in the body resulting in tumours that can be benign or malignant (cancerous cells). A proper treatment is necessary to fight with this serious disease.

  Discuss the different environmental companies

Discuss the different agencies, institutes, centers, different environmental companies that are active in UAE.

  Develop a simple urban constructed wetland design

Develop a simple urban constructed wetland design.

  Evaluate company performance in relation to GRI standards

Evaluate company performance in relation to GRI standards and comment on Stigler's theory.

  Water system design

Determine the corresponding error in the computed discharge

  Hydraulic behaviour in open channel

Describe how test flumes and associated equipment are used to assess and confirm hydraulic behaviour in open channel

  Write a paper on steel sustainability

Write a paper on steel sustainability.

  Writing case study about bridge collapse

Writing case study about bridge collapse

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd