Coordinating the construction for structural integrity

Assignment Help Civil Engineering
Reference no: EM131436078

Project 1 - Work readiness and structural planning

Part A: Getting work ready

Note: This is a compulsory pre-assessment task that you must complete to enable you to carry out practical assessments later in this course. However, this task will not contribute to the results recorded for your assessment in this unit. Do not bother with this Part

Part B: Planning for structural integrity - Class 1 and Class 10 building
Plan for the erection of the structure of the Casey house (Class 1) and fencing (Class 10) including:

- applying structural principles when planning the erection of the structure of the house and fencing including footings, floor system, structural and non-structural walls, roofing and external wall cladding. Refer to AS 1684 - Non-cyclonic.

- Explore forces and loads, and mechanical properties of materials.

- analysing plans and building materials for structural integrity to withstand bushfire, high winds, earthquake, etc.

- seeking professional advice/input from architects, engineers, etc.

- outlining how you would coordinate the demolition of any existing structures (e.g. a garage) in accordance with legislative and planning requirements, environmental standards, and safe work practices.

- describing what is involved in conducting a pre-commencement site inspection.

a) Read the scenario below that relates to the building of the Casey house and respond to the questions that follow.

Scenario

Consider the plans for the Casey house and imagine that you are responsible for planning the building of this house in a bushfire-prone alpine area: Casey plans - Sections, Elevations, Floor Plan, Site Plan.

As part of the planning process you need to ensure the structures and materials you use will togetherwithstand the loads and forces that will act upon them, and ensure the stability of the building.

Outline the main structural principles that might apply to the construction of the Casey house includingforces, loads and mechanical properties of materials. Include two examples of each principle that would apply to the Casey house. (400 words max)

- Loads (include two examples):

- Forces (include two examples):

- Mechanical properties of materials (include two examples):

b) Review the four Casey plans and consider the structural systems that will be used in the construction including the footings, floor system, structural and non-structural walls, roofing and external wall cladding: Casey plans - Sections, Elevations, Floor Plan, Site Plan.Remember that you are planning to build the Casey house in a bushfire-prone alpine area.
Complete the table below outlining the materials and performance characteristics for each structural system, and where you would seek expert advice.

c) In the box below, complete a 2-D, freehand, cross-section drawing showing a gable roofing structure at 22.5 degree. Drawing is not to scale and is primarily assessing your knowledge of materials and structural performance characteristics, not your drawing skills.

You must show the following items in your drawing:

- A gable-end roof structure

- The materials that will be used in the structure

- Structural performance characteristics of the materials and the structure

d) Before the construction of the Casey house, consider how you might go about demolishing any small existing structures such as a garage and brick fencing. Briefly outline the steps you would take for the demolition processincluding the planning, and the environmental and safety requirements you would need to comply with. (200 words max)Please complete

Hint: To assist with the work safety requirements, look at the ‘Notification of demolition work' form on the Sullivon Constructions website. This form is used to notify WorkCover of demolition work under the Work Health and Safety Regulation 2011.

e) Once the construction planning and demolition processes are complete for the Casey house, a pre-commencement site inspection will need to be conducted. Briefly list the factors that would need to be checked for this inspection. (200 words max)

In completing your final assessments, you will show evidence of your ability to:

- Plan, coordinate and manage the laying of floor system.

- Plan, coordinate and manage the building of structural and non-structural wall systems.

- Plan, coordinate and manage the building of roof system.

- Plan, coordinate and manage the external wall cladding of structure.

Project 2 - Coordinating the construction for structural integrity

a) Revisit the Casey plans you reviewed in Project 1 for this module. Casey plans - Sections, Elevations, Floor Plan, Site Plan.
Create your own checklist using the table below to assist the construction manager/foreman to coordinate and check the building.
Your checklist will include the following structural systems, and list what needs to checked for quality and compliance with the NCC and Australian Standards:

- footings

- floor system

- structural and non-structural wall systems

- roof system

- external wall cladding of structure

- fencing

b) In the box that follows, complete 2-D, freehand, cross-section drawings showing x2 structural wall types of your choosing for a low rise building. This task is primarily assessing your knowledge of the NCC, Australian Standards, structural components and quality checks.

You must show the following items in your drawing:

- Structural walls

- Relevant NCC and Australian Standards

- Structural components e.g. bracing components

- Quality checks needed for compliance

Assignment Files -

https://www.dropbox.com/s/szbkh90yj0f8kk6/Assignment%20Files.zip?dl=0

Reference no: EM131436078

Questions Cloud

Prepare the given statements and balance sheet for trading : Prepare an income statement and cash flow statement for each day's trading and prepare a balance sheet at the end of each day's trading.
Suggest population variance in blood platelet count increase : Is there any evidence to suggest the population variance in blood platelet count has increased? Assume normality and use a = 0.001.
Explain what psychological factors can often motivate hacker : Explain what psychological factors can often motivate hackers (eg, addiction, crime, greed, status, etc....), and give examples where these motivations were a factor in a cyberattack.What can organizations do to be more proactive in identifying an..
Evidence to suggest that mean police response time decreased : The chief of police claims that response time has improved. Is there any evidence to suggest that the mean police response time has decreased? Assume normality and use a = 0.05.
Coordinating the construction for structural integrity : Project 2 - Coordinating the construction for structural integrity. a) Revisit the Casey plans you reviewed in Project 1 for this module. Casey plans - Sections, Elevations, Floor Plan, Site Plan
What was the earth recoil speed : A meteor whose mass was about 1.8×108 kg struck the Earth (mE=6.0×1024 (kg) with a speed of about 25 km/s and came to rest in the Earth.? Part A) What was the Earth's recoil speed (relative to Earth at rest before the collision)?
Identify at least one major stressor in your life : Identify at least one major stressor in your life and discuss its likely impact on your health and steps you could take to mitigate that impact. Provide specific examples to support your response.
What is correct amount of impairment charge to be recorded : What is the correct amount of impairment charge to be recorded in profit and loss under IFRS and US GAAP? Determine amount of borrowing costs that Thurstone should include in the cost of new building at 31 March, Year 1.
What is the probability of a type ii error : What is the probability of a type II error if the true mean amount of ore extracted has changed to 1875 DMT; that is, find β(1875)? Find the probability of a type II error if the true mean is 1925 DMT.

Reviews

len1436078

3/22/2017 2:21:57 AM

Subject- Construction management. Word Count-As per the questions. Below are 4 drawings that you will work off. you will also need the National Construction Code (NCC) Volumes 1 & 2. Attached below is NCC Vol 1. you can download NCC Vol 2 here https://www.qbcc.qld.gov.au/sites/default/files/NCC2015_BCA_Volume_Two.pdf as the file is too big to send. Should you do a perfect job on this assignment I will come back for your services.

Write a Review

Civil Engineering Questions & Answers

  Engineering ethics and ethical issue

what is the engineering ethics course where to write about any engineering ethical case and discuss the ethical issue?

  Engineering ethics and concept and cases

what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?

  Transportation and management

In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.

  Supporting Investment Promotion: ERNST & YOUNG

Ernst & young is currently providing support to various sectors. In this regards it was felt that if this report is able to document good practices currently being adopted or planned in ceramic sector.

  Personalized Cancer Therapy-A step forward

Cancer is the uncontrolled growth of abnormal cells in the body resulting in tumours that can be benign or malignant (cancerous cells). A proper treatment is necessary to fight with this serious disease.

  Discuss the different environmental companies

Discuss the different agencies, institutes, centers, different environmental companies that are active in UAE.

  Develop a simple urban constructed wetland design

Develop a simple urban constructed wetland design.

  Evaluate company performance in relation to GRI standards

Evaluate company performance in relation to GRI standards and comment on Stigler's theory.

  Water system design

Determine the corresponding error in the computed discharge

  Hydraulic behaviour in open channel

Describe how test flumes and associated equipment are used to assess and confirm hydraulic behaviour in open channel

  Write a paper on steel sustainability

Write a paper on steel sustainability.

  Writing case study about bridge collapse

Writing case study about bridge collapse

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd