Topic 3: Analysis of building retrofit investment risks using life cycle approach.Research Aims:Retrofitting is carried out to reduce the energy consumption and greenhouse gas emission of a building. Retrofitting of a building requires large investments and a proper risk analysis is required for decision making. Risks in a building retrofit project may come from uncertainties in installation and performance of the retrofit, maintenance, utility cost, discount rate etc. The aim of this research is to conduct a risk analysis of a building retrofit project following life cycle approach, from investor perspective and focus on investment risks.

Reference no: EM131055202

Questions Cloud

Fund assuming that only the interest income is distributed : George Jefferson established a trust fund that provides $178,500 in scholarships each year for worthy students. The trust fund earns a 5 percent rate of return. How much money did Mr. Jefferson contribute to the fund assuming that only the interest i..
Possibility of small scale profitability entry in small : Viton's 1981 study of urban transit costs found that urban transit firms operating in small cities (where fewer than one million vehicle-miles are produced annually) operate under increasing returns to scale, Assuming that fares are set at marginal c..
Determine the wall temperatures : Determine the wall temperatures to be applied along AB, BC, and CD so that 1) the last point to solidify in the casting is point P, and 2) the time for complete solidification of the product is as fast as possible.
Renfro rentals has issued bonds : Renfro Rentals has issued bonds that have a 12% coupon rate, payable semiannually. The bonds mature in 9 years, have a face value of $1,000, and a yield to maturity of 9.5%. What is the price of the bonds?
Conduct a risk analysis of a building : The aim of this research is to conduct a risk analysis of a building retrofit project following life cycle approach, from investor perspective and focus on investment risks.
Project manager for new management accounting system : You are the project manager for a new management accounting system that will provide monthly profit and loss accounts to a chain of 30 computer dealerships, each of which is franchised to its local owner/manager.
Temporary project that will generate the cash inflows : The firm will also be required to spend $10,000 to close down the project at the end of the three years. If the cost of capital is 10 percent, should the investment be undertaken?
Organizational risk appetite and risk assessment : Imagine that a software development company has just appointed you to lead a risk assessment project. The Chief Information Officer (CIO) of the organization has seen reports of malicious activity on the rise and has become extremely concerned wit..
What is the current yield or cost of the preferred stock : NPerpetuity, Inc. issued $1,000 par value preferred stock 20 years ago. The stock provided a 7.50 percent yield at the time of issue. The preferred stock is now selling for $1,162.79. What is the current yield or cost of the preferred stock?

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determine the control efficiency needed to meet the criteria

A Chemical manufacturer emits air with 250 PPM of toluene at 1 atm and 30 degrees C at a flow rate of 10,000 cubic meters per minute.The air is routed to a biofilter to control total emissions to less than 110 kg/day of toluene.

  Working of real estate salesperson

You are a real estate salesperson working for Good Earth, Realtors, Inc. You receive 50 percent of all commissions received by the firm (net of MLS fees) for which you were either the listing agent or the selling agent.

  Calculate the overflow rate detention time and weir loading

A fine sand has a hydraulic condutivity of 3.5 x 10^-5 m/s a hydraulic gradient of 0.00141, and a porosity of 45 percent. Detrmine the Darcy velocity and the averge linear velocity

  Determine the foundation soils allowable bearing

A square footing 2 meters by 2 meters is to be constructed 1.22 meters below the ground surface. The groundwater table is located 1.82 meters below the ground surface. The subsoil consists of a uniform, medium dense, cohesionless soil with the follow..

  What angle would be needed in order for an equivalent body

The face of a 100m wide rectangular dam is built at an angle of 60 degrees above the horizontal and holds back a body of fresh water that is 30m deep at the face of the dam

  Is the actual flow in the pipeline laminar or turbulent

Oil flows through the Trans-Alaska pipeline. Because oil is viscous, you might think that the flow is laminar. (a) What is the minimum flowrate (m3/s) for which the flow would likely be laminar.

  Define the term stocky wall

Define the term stocky wall Define the term simple bearing.

  Calculate the ammonia concentration in mg per l

NH4+ = N+ + NH3 pK =9.24 If the pH is 8.5 and the ammonium(NH4+) concentration in 20mg/L, calculate the ammonia(NH3) concentration in mg/L.

  Is this a reasonable claim

A cooling tower with a cooling capacity of 100 tons (440 kW) is claimed to evaporate 15,800 kg of water per day. Is this a reasonable claim?

  Determine the masses of dry air and the water vapour

Determine the masses of dry air and the water vapor contained in a 240-m3 room at 98 kPa, 23°C, and 50 percent relative humidity.

  What is the horizontal force excerted on the supports

A carbon steel tank, 6ft. inside diameter X 10 ft. long with a 3/8 inch wall, is sitting on evenly spaced rolls and 4 evenly spaced supports (2 on each side). What is the horizontal force excerted on the supports

  Determine height from ground and time at which may pass

Ball A is thrown vertically upward from the top of a 30-m-high building with an initial velocity of 5 m/s. At the same instant another ball B is thrown upward from the ground with an initial velocity of 20 m/s. Determine the height from the ground..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd