Compute what is variable overhead rate variance for march

Assignment Help Managerial Accounting
Reference no: EM132640014

Preble Company manufactures one product. Its variable manufacturing overhead is applied to production based on direct labour-hours, and its standard costs per unit are as follows:

Direct materials: 5 kg at $8.00 per kg$40.00

Direct labour: 4 hours at $15 per hour 60.00

Variable overhead: 4 hours at $5 per hour 20.00

Total standard cost per unit$120.00

The company planned to produce and sell 21,000 units in March. However, during March the company actually produced and sold 24,000 units and incurred the following costs:

  1. Purchased 150,000 kg of raw materials at a cost of $6.40 per kg. All of this material was used in production.
  2. Direct labour: 66,000 hours at a rate of $18 per hour.
  3. Total variable manufacturing overhead for the month was $413,820.7. What is the variable overhead spending variance for March? (Do not round intermediate calculations. Round the actual overhead rate to two decimal places. Indicate the effect of each variance by selecting "F" for favorable, "U" for unfavorable, and "None" for no effect (i.e., zero variance.).)

Question 1: What is the variable overhead rate variance for March? (Round the actual overhead rate to two decimal places. Indicate the effect of each variance by selecting "F" for favorable, "U" for unfavorable, and "None" for no effect (i.e., zero variance.).)

Reference no: EM132640014

Questions Cloud

Compute the quantity of joint compound needed to finish : Compute the quantity of joint compound needed to finish 3000 sq ft of gypsum board wall? Explain in detal and provide the suitable example.
Explain the benefits of your recommendations : Developing appropriate pharmacological treatment plans requires medical and mental health professionals to consider all potential factors that may be.
Assumptions of the simple keynesian model : Identify the basic assumptions of the simple Keynesian model.
What are the influences of keynesian perspective : What are the influences of Keynesian Perspective and the Neoclassical Perspectives on monetary policy?
Compute what is variable overhead rate variance for march : Compute What is the variable overhead rate variance for March? (Round the actual overhead rate to two decimal places. Indicate the effect of each variance)
Difference between gdp and gnp : What is the difference between GDP and GNP?
What are the four main categories of resources : What are the four main categories of resources? Explain each of them. Explain what can we learn from a country's production possibilities curve?
Limitations of gdp as a measurement tool : What are the limitations of GDP as a measurement tool?
Analytical scenarios that best fit business solution : Explain how statistical techniques can solve business problems - Identify and evaluate valid statistical techniques in a given scenario to solve business

Reviews

Write a Review

Managerial Accounting Questions & Answers

  Manage budgets and financial plans

Explain the budgeting process and its importance to a business, identifying the components of different budgets, forecast estimates for inclusion in the budgets.

  Prepare a retained earnings statement

Prepare a retained earnings statement for the year and Prepare a stockholders' equity section of given case.

  Prepare a master budget for the three-month period

Prepare a master budget for the three-month period.

  Construct the companys direct labor budget

Construct the company's direct labor budget for the upcoming fiscal year, assuming that the direct labor workforce is adjusted each quarter to match the number of hours required to produce the forecasted number of units produced.

  Evaluate the predetermined overhead rate

Evaluate the Predetermined Overhead Rate

  Determine the company''s bid

Determine the company's bid if activity-based costing is used and the bid is based upon full manufacturing cost plus 30 percent.

  Compute the pool rates for the different activities

Complete the schedule to compute the pool rates for the different activities.

  Prepare Company financial statements

Prepare Company financial statements

  Prepare an analysis of terracycles

This individual assignment is based on the TerraCycle Inc.

  Discuss the ethical issues

Discuss the ethical issues

  Political resources in emerging markets

Calculate the GDP in Income Approach  and Expenditure Approach

  Management accounting - ehsan electronics company

A new plant accountant suggested that the company may be able to assign support costs to products more accurately by using an activity based costing system that relies on a separate rate for each manufacturing activity that causes support costs.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!