Compute the average photographic scale along the line ab

Assignment Help Civil Engineering
Reference no: EM131143475

The distance between two points on a vertical photograph is ab and the corresponding ground distance is AB. For the following data, compute the average photographic scale along the line ab.

(a) ab = 2.41 in.; AB = 4820 ft

(b) ab = 5.29 in.; AB = 13,218 ft

(c) ab = 107.389 mm; AB = 536.943 m

Reference no: EM131143475

Questions Cloud

Find the approximate dimensions of rectangular building : Find the approximate dimensions (in meters) of a large rectangular building that also appears on this photo and whose sides measure 20.5 mm by 6.8 mm. (Hint: football goal posts are 120 yards apart.)
What is learning organization : What is a learning organization? Examine your organization. Is it a learning organization? Explain why or why not. Explore what factors have enabled it to survive. What changes can it implement to ensure its continued existence?
Choose a photo to be incorporated into descriptive essay : Choose a photo to be incorporated into your Descriptive Essay.-  Write a descriptive essay based on the photo you selected.-  Write a separate paragraph elaborating the purpose of the sensonry escription in your essay.
Comfortable adopting rich communication media : As a manager are you more comfortable adopting "rich" communication media (face to face meetings) or more "leaner" forms( e-mail, newsletter)?Which one have had the most success and why?
Compute the average photographic scale along the line ab : The distance between two points on a vertical photograph is ab and the corresponding ground distance is AB. For the following data, compute the average photographic scale along the line ab.
Change communication process : What is your view: How central should CEO's and supervisors be in the change communication process? What are the key issues from your point of view?
Express delivery systems-just in time parts : Express Delivery Systems, Inc. is a worldwide package delivery company that specializes in fulfilling "just in time" parts and supplies to manufacturers. It provides both "overnight" and "express" deliveries, express referring to the fastest road-bas..
How fast is the top ladder moving down : A 16 foot ladder is leaning against a building. if the bottom of the ladder is sliding along the pavement directly away from the building at 2 feet/second, how fast is the top ladder moving down when the foot of the ladder is 2 feet from the wall
Do you think terrorists could be viewed as martyrs : Analyze and explain the differences in ideology that might force an individual to commit a terroristic act? Do you think terrorists could be viewed as martyrs? Why? Do you think people who are willing to give their life for their cause are sane and r..

Reviews

Write a Review

Civil Engineering Questions & Answers

  How long the train blocked the crossing

Assuming constant acceleration, determine how long the train blocked the crossing. Dis- regard the width of the crossing.

  What are the masses of gravel-sand and water per cubic meter

The design of a concrete mix requires 1173kg/m3 of gravel in SSD condition, 582 kg/m3 of sand in SSD condition, and 157kg/m3 of free water. The gravel available at the job site has a moisture content of 0.8% and absorption of 1.5%

  What equal year-end withdrawls can be made each year

If a single deposit of $15,000 is invested at 2.75% yearly interest, what equal year-end withdrawls can be made each year for 10 years, leaving nothing in the fund after the 10th withdrawl

  What is the magnitude of shaft work obtained

If the amount of heat transfer in the HE unit is 2460 kJ per kg of steam, what is the magnitude of shaft work obtained from the turbine in kW?

  Determine what is the point b ellipse height

H = h - N Point B has a geoid correction of -100', and a NAVD88 elevation of 100'. What is the point B ellipse height

  Calculate the current density involved in the corrosion

Calculate (a) the current and (b) the current density involved in the corrosion of the iron

  Determine total time for the compression wave to travel down

You are to perform a dynamic pile load test on a24-inch OD open ended homogeneous pipe pile. The pile has a shellthickness of 0.5 inch and is 80 feet long. Calculate: Compression wave velocity(hint: E=29x106 psi, g=490 pcf)

  Calculate the air mass temperature at the 1500 m. and 1000

Consider a mass of air at 18 ºC, which is located at 1,000 m. above mean sea level. A strong wind moves the air mass over a mountain range at 2,500 m. mean sea level and then the air descends to an elevation of 500 m on the leeward

  Determine maximum nominal average shear stress

Using the method of superposition, draw a neat labelled Bending Moment Diagram and Shear Force Diagram for the beam member shown in Figure 1, and determine the Bending stresses under maximum positive and negative bending moment.

  What resistor is needed to create the necessary coil voltage

The available relay for switching a secondary circuit requires 4 volts and has a coil resistance of 145 ohms. If a voltage divider circuit is used to reduce the voltage to activate the relay, what resistor is needed to create the necessary coil vo..

  What average thickness must the engineer build to meet these

An engineer uses a standard technique for measuring the thickness of a clay landfill liner that has a typical standard deviation of 0.7 in. The project specifications require the liner thickness to be 36 inches or more, at least 95 percent of the tim..

  Find vertical reactions and construct complete shear moment

A 16-ft [4.88 m] span beam is fixed at one end and simply supported at the other end. A single concentrated load of 9600 lb [42.7 kN] is placed at the center of the span.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd