A highway reconstruction project is being undertaken to reduce crash rates. The reconstruction involves a major realignment of the highway such that a 60-mi/h design speed is attained. At one point on the highway, a 720-ft equal-tangent crest vertical curve exists. Measurements show that at 3 + 40 stations from the PVC, the vertical curve offset is 3.5 ft.
Assess the adequacy of this existing curve in light of the reconstruction design speed of 60 mi/h and, if the existing curve is inadequate, compute a satisfactory curve length.
In a processing plant, a chemical tower has a liquid which is vaporized. However, if the vapor in the tower reaches 150°C, an alarm needs to be generated so that safe shutdown of that system of the plant may be initiated. An RTD will be used to me..
If an observation for route 1 finds that the gaps between 30% of the vehicles are less than 6 seconds, estimate the volume and average travel times for the two routes.
1. A thin stick one metre long is suspended at one end from the ceiling by a string. As it swings, the angle of the stick to the vertical is consistently twice that of the string. What is the length of the string? (Show all working.)
Consider the system with transfer function P(s) = 1/s which is to be controlled by a strictly causal DT-PI controller of the form C(z) = K(z-a)/z(z-1), Discuss the selection of a suitable sampling time for the controller
Consider a binary symmetric channel characterized by the transition probability p. Plot the mutual information of the channel as a function of p1, the a priori probability of symbol 1 at the channel input; do your calculations for the transition p..
Comprehensively describe the optimum solution you have chosen for your project. Include the location, lay-out, demand/supply balance, financial considerations, and give a detailed specification and quantification for materials and labour required
Please describe the basic elements in a distillation process and what must be controlled in a distillation tower in order to ensure proper functioning of the distillation process?
1. if 8000m3d of wastewater from an industry has a bod5 of 190 mgl and k 0.17 per day base 10a. how much oxygen kgday
(a) Show that the time interval required to empty the tank is given by (b) Evaluate the time interval required to empty the tank if it is a cube 0.500 m on each edge, if A = 2.00 cm2, and d = 10.0 m.
Find the currents entering the high-voltage terminals and leaving the low-voltage terminals if the low-voltage windings are (a) Y connected, (b) ? connected.
3-15. Describe two options for handling the staffing levels for this new line of work. What issues and complications are likely to surface with the new amount of work for Jill's department?
Assuming that the transistors in both circuits are properly sized to provide each gate with a current-driving capability equal to that of the basic matched inverter, find the number of transistors and the total area of each circuit.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd